Civil / Building / E&M
Tender Planner, Kier Wallis Construction, Multiple Projects
Wallis Construction (A division of Kier Regional) (Assistant Planner)
Assistant Planner, Laing Construction London and South-East, Duke Of York Redevelopment, Sloane Square, London
Laing Construction London and South-East (Assistant Planner)
- Report preparation on sub-contractor extension of time claims against Laing Construction.
- Working with Planning and Quantity Surveying teams.
- Liaising with sub-contractors to reconcile extension of time disputes.
Project
Junior Project Management Consultant, TBH Group, Multiple Projects
Tracey Brunstrom & Hammond Pty. Ltd. (Project Management Consultant)
- Time Management.
- Project Planning.
- Project Monitoring and Reporting.
- Training of project planning skills.
- Process design.
- Arbitration & litigation document preparation (Claims / Forensic Schedule Analysis).
- Intranet web design.
- Q.A. auditing.
Key Projects Involved in:
Senior Planner, Renew Group - Amco Rail, Various
Building & Civil Engineering Planning Experience...
- New build; Retail
- New build; Residential: Flats & houses
- New build & renovation; Bridges
- New build; Schools, University
- Infrastructure; Various Services (University estate redevelopment while maintaining services and access; Water, Gas, Power, Drainage).
- Rail projects: Listed structure renovations, Track engineering works, Earthworks, Stabilisation works, Tunnel works, Bridge replacements & repairs and Building works
Area Planning Engineer., Al Jaber Building L.L.C, Villas and Low Rise Buildings Construction
Since 2007 I'm working as a planning engineer in the United Arab Emirates for a main contractor reporting directly to the project director.
Tender Schedules preparation.
Developing baseline schedules (Resources and cost loaded) using P3, P6 V7
Updating baseline and progress reporting.
Preparing recovery and action plans.
Extension of Time.
Involved in two mega projects (Al Raha Garden >>"1400 Villas" & Al Falah Community Development >>"2080 Villas") and many other small resedential projects.
Area Planning Engineer., Al Jaber Building L.L.C, Villas and Low Rise Buildings Construction
Since 2007 I'm working as a planning engineer in the United Arab Emirates for a main contractor reporting directly to the project director.
Tender Schedules preparation.
Developing baseline schedules (Resources and cost loaded) using P3, P6 V7
Updating baseline and progress reporting.
Preparing recovery and action plans.
Extension of Time.
Involved in two mega projects (Al Raha Garden >>"1400 Villas" & Al Falah Community Development >>"2080 Villas") and many other small resedential projects.
Thomas Fussell
Executive Director, Project Services, Public Bulding Programs
I am responsible for a multi-disciplinary professional team responsible for the design, documentation and construction management of a wide range of public buildings in Queensland Australia.
Pagination
- Previous page
- Page 1249
- Next page