Civil / Building / E&M
Programme & Controls Manager, Arup, 1) Arup – Dubai / Abu Dhabi / Doha Head office - All Projects - a) AL Mashtal Development – Abu Dhabi b) Canal Point Hospital – Jebel Ali c) 4.Downtown - Jebel Ali
Planning & Project Controls Managerial
· Develop / implement / manage Project Management Plan, Programme and Scheduling, Progress Measurement System (PMS), Communication Management System and Reporting System (progress and cost).
Angel McMillon PMP
My Name is Angel McMillon and I have been in Project Controls for over 5 years. I currently hold a credential as a Project Managment Professional and currently perform the current task; Performs complex evaluations of existing procedures, processes, techniques, models and/or systems related to management problems or contractual issues. Develops work breakdown structures, prepares charts, table, graphs and diagrams to assist in analyzing problems. Assists in the preparation of management plans and reports.
Project Controls Supervisor, Carter Brothers, CDC
 
Cost Control Engineer, Balfour Beatty, Food Ingredients Production Plant – Indofood, Pantai Indah Kapuk Bridge, Pondok Indah Mall II – Piling & Earth Retaining Structure (Indonesia)
Managed project cost by controlling expenditure of material (bid analysis, price negotiation, supervising procurement officers) and manpower (subcontract, works certification, facilitating timely payment, supervising QSs); maximizing income (variation order and invoicing); and regularly monitoring the actual progress (weekly / monthly report)
Site supervisor, Satyaraj Constructions, G+3 BUILDING
Construction of Residential Building G+3 for 8 apartments
Construction supervision, Getting acquainted with the process of construction
Assistant Manager Planning, City Corporation Limited., Amanora Park Town
- Preparation, Tracking, Monitoring Schedules as per actual work done on site for all residential, infrastructure projects.
- Minimize schedule & cost variances by daily visiting on site and maintaining proper co-ordination with site staff.
- Preparing the estimates of work to be executed and tracking the work according to estimated quantities.
- Preparing Work Breakdown Structure (WBS) for all the projects going on in township.
- Revised the schedule as per site requirement.
- Preparing & monitoring material requirement reports by co-ord
Planning Lead Engineer, S. N. Joshi Consultants, Amanora Park Town
- Preparation of schedules, bar charts for residential, commercial buildings.
- Preparing cash flows for various resources required during construction.
- Preparing material procurement schedule.
- Tracking the schedule according to activities going on site.
- Monitoring the activities on site as per planning schedule.
- Preparing the MIS Report for the Upper Management.
Pagination
- Previous page
- Page 1235
- Next page