Airports / Aviation

PLANNING ENGINEER, L & T , SALALAH INTERNATIONAL AIRPORT PROJECT, OMAN

START Date

Roles & Responsibilities:

  • Thorough study of the contract documents / drawings to prepare a Master Plan / Schedule for the project using PRIMAVERA (P6/P3) within the given budget, manpower and time limits using CRITICAL PATH METHOD.
  • Resource Loading / Leveling.
  • Getting the Master plan approved.
  • Updating the progress every week and comparing it against the Master plan / Target for submission to the client / consultant and to the management (Through “S-Curve”).
  • Prepara

Assistant Engineer - Planning & Project Control, Yuksel Construction Co., US ARMY CORPS of ENGINEERS - FY08-FY09 PROJECTS at BAGRAM AIR FIELD

START Date
END Date

Yuksel Construction - Afghanistan      

US ARMY CORPS of ENGINEERS - FY08-FY09 PROJECTS  at BAGRAM AIR FIELD

(Parallel Taxiway, Ramps ,Fuel Line , Steel Hangers)

NATO MAINTANENCE & SUPPLY AGENCY (NAMSA) – PEBS PROJECTS  at BAGRAM AIR FIELD  ( Pre Engineered Steel Buildings )

KAIA APOD OPERATING & LIVING FACILITIES - DFAC BUILDING PROJECTS  at KABIL  ( Reinforced Concrete Building )

Position: Planning & Cost Control Engineer<

Amin Sorour

A
Amin Sorour 👤 Member for 20 years 4 months
First Name
Amin
Last Name
Sorour
Years Experience
4

I am writing to express my interest in applying for vacancies with your organization. Based in Qatar, I am currently employed as a senior planning and project controls Engineer at Bechtel.
 
I have a total of 6 years of full-time work experience in project controls, planning and projects management for large-scale projects in Egypt and Gulf Area.
 
I believe that the skills I have acquired in the course of my professional and educational experiences will be valuable assets for your organization and/or your clients.

Senior Planning and Scheduling Engineer, Overseas Bechtel Incorporated, New Doha International Airport (NDIA project)

A
Amin Sorour 👤 Member for 20 years 4 months
START Date

Responsibility includes collation of design and construction side documentation for the design and construction master schedule, and preparation of output reports with recommendations, preparation of monthly report, cost, schedule and financial reports, submission and distribute the same, preparation of master schedule and details schedules for design and construction including review of a/e and contractors schedules, updating and status reporting to the higher level of management as requested, review the project information and fact sheets and graphical presentati