VOLKA

VOLKA

planner, volka, & Oil & Gas Projects 2) Buildings 3) Infrastructurus

START Date
END Date

Responsible for preparation of Clause 14 Baseline Program for project at the tendering stage as per the scope of

work in Primavera version P3.1  P6.

 Developed the (MTS) level 4 integrated EPC (Engineering, Procurement and Construction) schedule based on

contract requirements in cooperation with the Managing Contractor on Primavera.

Updated and reviewed the BSC (Balanced Score Card) for projects. Conducted several presentations for the

site team in order to highlight the importance of BSC.

4D Planner, Volka, 12 High Ends Residential/Condominiums Building Project

START Date
END Date

Responsible for preparation of Clause 14 Baseline Program for project at the tendering stage as per the scope of

work in Primavera version P3.1 & P6.

 Developed the (MTS) level 4 integrated EPC (Engineering, Procurement and Construction) schedule based on

contract requirements in cooperation with the Managing Contractor on Primavera.

Updated and reviewed the BSC (Balanced Score Card) for projects. Conducted several presentations for the

site team in order to highlight the importance of BSC.

4D Planning Consultant, Volka, Building Works (Villas)

START Date
END Date

Responsible for preparation of Clause 14 Baseline Program for project at the tendering stage as per the scope of

work in Primavera version P3.1 & P6.

 Developed the (MTS) level 4 integrated EPC (Engineering, Procurement and Construction) schedule based on

contract requirements in cooperation with the Managing Contractor on Primavera.

 Updated and reviewed the BSC (Balanced Score Card) for projects. Conducted several presentations for the

site team in order to highlight the importance of BSC.

planner, Volka, Building Projects

START Date
END Date

Responsible for the planning and control for the execution of a brown field development, including a field integrity upgrade and field capacity extension on an existing oil field in Oman. During the execution phase of involved in all project management related functions, including estimating, planning and scheduling, risk analysis, cost forecasting and economic appraisal.