Schofield Lothian

Schofield Lothian

Senior Planning Consultant, Schofield Lothian, London Underground

START Date
END Date

Worked as a Senior Planning Consultant acting for London Underground Limited to develop the baseline programme for the major upgradation of the entire infrastructure on the Central, Bakerloo and Piccadilly line.

 

  • Prepared master programme for the signalling upgrade for Central, Bakerloo and Piccadilly line upgrade including Enabling works, Rolling Stock.

Ernesto Montales

First Name
Ernesto
Last Name
Montales
Professional Since
Oldest experience
Years Experience
21
Guild Accreditation
GPC Member
Telephone Number
+447738324252
LinkedIn Profile
https://www.linkedin.com/in/ernestomontales/

I’m a Project Planning and Controls Consultant with a passion for helping Project Managers and its team for better understanding (for better delivery of Projects) of the programme by encouraged participation in the planning process therefore having a sense of ownership and by translating the programme to a more user friendly document.

Lead Planner, Schofield Lothian, Brent Cross Re-development Phase 1AN

START Date
Experience Hours (Planning & Scheduling)
500

Schofield Lothian – September 2017 to PresentLead\Senior Project Planner - Brent Cross Redevelopment Phase 1AN (Infrastructure)Project Cost: £400m • Leading and facilitating the development and maintenance of the master project plan for the project • Providing advice on different approaches that can be adopted in order to successfully achieve the client’s overall objectives•

Senior Planner, Schofield Lothian, Various

START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Forensic Analysis)
950

Responsible for the development, implementation and handover of a P3e based project controls system for the £50 million per annum North West Gas Alliance.  This project was for the renewal of 400kms per annum of low and medium pressure gas mains together with service connections.  As well as managing the 6 planning consultants which developed the new controls system, I was also responsible for training the clients planning operatives to use new system.

Prepared a delay report for the civil engineering contractor on a £60 million rail re-signalling project in South Wales.

Planner, Schofield Lothian, RMG A13 JV DBFO Road Claim v TFL

L
Lee Mallek 👤 Member for 21 years 1 month
START Date
END Date
Experience Hours (Forensic Analysis)
2200

Joined Schofield Lothian to gain experience as a Forensic Planner based in Central London.

Slough Borough Council v Dew Pitchmastic, Slough, UK

Worked as the delay analyst for Schofield Lothian providing forensic planning support to the defendant SBC during the refurbishment of a residential tower block. The contractor was requesting an extension of time

Birse Build Ltd v Elliotts Brickwork, Hemel Hempstead, UK

Forensic Planner / Delay Analyst, Schofield Lothian, Multiple Clients

START Date
END Date

 

Planning Consultant Schofield Lothian  Planning consultant;• Delay analysis for civil contractor on rail signalling upgrade project in South Wales.• Kings Cross Underground Redevelopment (Phase 2)