Mohsen Ashiani
I am working as a planner since Mar 2006. My first experience was in a construction project. At that period, a big Petrochemical Plant was being built in Iran. This plant was a joint-venture of an Iranian Company and a South African company (Sasol). I was responsible for preparing reports, controlling the progress via site visit, preparing and controlling schedule for Civil and Piping Disciplines.
In Jan 2008, I went to another construction project.
Cost Engineer, Sasol, Functional Excellence Programme
To update monthly Cost Reports.Get signed approval of each Function Manager.Sort the Budget for the Project in total.Build Consolidated Master Documents.Built a process template in accordance with the timeline for each function per month.Tracking of functions expenditures and savings.Do SAP reports for all functions on a monthly basis.Built Pivot Tables in Excel.Budget, Actual and Forecast.Built S-Curves on a weekly basis.Built Cash flows on a weekly basis.Have weekly t
Andre Gouws
Planning Group Leader, Sasol, Maintenance Shutdowns & Construction Projects
Started as a Maintenance Planner - Snr Maintenance Planner - Shutdown Coordinator - Leader - Planning Group Leader
Senior Planner System Wide, Sasol, Upstream gas Processing Plant (EPC)
2009 Jan – 2010 Jan and 2008 Jan – May: Sasol Petroleum International, South Africa
Based in Johannesburg on a consultancy basis to assist in the establishment of high level planning and project controls using the Primavera P6 tool. Specifically, the contract was to realise systematic control of SPI up-stream gas exploration and development project activities in Mozambique and elsewhere, including:
JOEL MOODLEY