Engineering Planning Co-ordinator, Rail Link Engineering, Channel Tunnel Rail Link - Section 1

START Date
END Date

Based in the head office on Tottenham Court Road, London, reporting to the Project Controls Manager (planning and costing). Monitoring and reporting on the production and issue of all project deliverables to site, against the project programme. Primarily using Primavera P3 project management software and Microsoft Excel as reporting tools.  

Planner, Rail Link Engineering, Channel Tunnel Rail Link - Section 2

START Date
END Date

Transferred to section 2 of the project in March 2000 within the central group, tasked with the  reporting of progress on the early enabling works and the production of detailed programmes for the engineering disciplines. In December 2000 re-assigned to the St Pancras team in preparation for the commencement of major construction works in July 2001. Continued with the engineering programming with a growing involvement with the construction team as contracts were let. In July 2001 transferred to site offices to monitor, report and do analysis on Contracts 102, 125 and 135.