EPC Lead Planner, PREMIER OIL, Solan

START Date
END Date

Solan project.
Construction of the jacket and the topside at the Bifab yard.

Managed the Jacket construction planning scope
• Provided new detailed estimation tools of the Load-out planned date, using production daily results (bracers and infills installed/welded out).
• Optimized the schedule of the Rigging contractor and its interactions with production.

Directed a team of 2 production planners
• Trained the team to become proficient with Primavera P6.
• Supported production team by identifying daily priorities and critical path.
• Delivered daily production reports.

Senior Planning Engineer, PREMIER OIL, Sea Lion Project

J
Jon Ward 👤 Member for 17 years 11 months
START Date

Senior Planning Engineer Sea Lion Project.Full offshore field development, currently entering FEED phase of project. Proposed Tension Leg Platform (TLP) with Topsides dry weight of 21,000 tonnes, subsurface development design accommodating reservoir characteristics. As the Senior Planning Engineer for Premier Oil I am responsible for measurement and collation of the entire Field Development Plan together with schedules and estimates relating to future Hook-up, Commissioning and Maintenance of the facilities.

Jon Ward

J
Jon Ward 👤 Member for 17 years 11 months
First Name
Jon
Last Name
Ward
Professional Since
Oldest experience
Years Experience
20

Four (4) year apprenticeship served as a Mechanical Engineer (awarded East of England Apprentice of the Year 1996).  Higher education followed by ten (12) years experience in the Oil and Gas Industry predominantly within Project Controls, experience within project specification, design, execution, start up and close-out of major Greenfield and Brownfield modifications projects.