NCC

NCC

Sony Lei

S
Sony Lei 👤 Member for 16 years 8 months
First Name
Sony
Last Name
Lei
Professional Since
Oldest experience
Years Experience
6

projrect coordinator &planner, ncc, 33kv EPC

START Date
END Date

 

I am a skillful Electrical Engineer with a background in Transmission line & Substation knowledge. Extensive Experience in Planning Schedule & Project coordinator added with power system knowledge in Testing and commissioning.

 

I have an in depth knowledge of Transmission line & Substation Project and I am looking to expand my experience Level.

projrect coordinator &planner, ncc, 33kv EPC

START Date
END Date

 

I am a skillful Electrical Engineer with a background in Transmission line & Substation knowledge. Extensive Experience in Planning Schedule & Project coordinator added with power system knowledge in Testing and commissioning.

 

I have an in depth knowledge of Transmission line & Substation Project and I am looking to expand my experience Level.

Karim Ragab

K
Karim Ragab 👤 Member for 14 years 6 months
First Name
Karim
Last Name
Ragab
Professional Since
Oldest experience
Years Experience
3
Telephone Number
01008383103

Planning Construction Engineer

Planner, NCC, DCB2

K
Karim Ragab 👤 Member for 14 years 6 months
START Date

- Time Schedules. - Resource Plans. - Method Statement. - Reports (Daily-Weekly-Monthly) - Control sheets. - Delaying Reports. - Tenders Study. - Cost Control (control sheet) - Contract Study and FIDIC

CONSTRUCTION/PLANNING ENGINEER, NCC, Construction of 718 villas

START Date

Planning, Scheduling, Budgeting, Reporting, Monitoring and controlling the project cost of RO.81M, Construction of 718 villas at Different Location in Quriyat.

  1. To work out the Zero cost (project budget) and fix the project profit margin in consultation with top management & HO.
  2. Prepare construction schedule (Cl.14 and internal) in primavera P6 by ensuring logical sequencing of activity for optimize the resources utilization and reduce the overheads, also work out the S curve.