Water Treatment Specialist, Harouge OIl Operation, Libya, Harouge Oil Operations START Date Sun, 04/01/2007 - 02:00 END Date Tue, 02/01/2011 - 01:00 Read more about Water Treatment Specialist, Harouge OIl Operation, Libya, Harouge Oil Operations
Planning Engineer (Lead), Harough/Petro Canada Oil Operations, Tripoli, Libya, Develops and produces petroleum from Oil Fields (Infrastructures, Oil well drilling, Pipelines, crude tanks, surge tank closed drain tank, ring foundations and Power Plants). START Date Tue, 04/01/1980 - 01:00 Read more about Planning Engineer (Lead), Harough/Petro Canada Oil Operations, Tripoli, Libya, Develops and produces petroleum from Oil Fields (Infrastructures, Oil well drilling, Pipelines, crude tanks, surge tank closed drain tank, ring foundations and Power Plants).