Professional Summary:

15 years of Extensive experience in Project Management, Planning and Execution of Engineering, Procurement, Construction & Commissioning in Nuclear Facilities, Petrochemicals, Aluminum Smelter and Gold, Copper & Molybdenum Processing Plant Projects.

Strengths:

Tamas Farkas

First Name
Tamas
Last Name
Farkas
Oldest experience
Years Experience
13
Telephone Number
+36 (20) 525-1725 (Hungary); +7 (701) 238-9848 (Kazakhstan)

Date of birth: 05th of October, 1970

Citizenship: Hungarian

E-mail: [email protected]

Skype: arteomo

Education:

GATE-GTK Karoly Robert College, Faculty of Economics, Gyongyos, Hungary – Economic Engineer (BSc course), 1994

Cost Engineer/Assistant Planning Engineer, VEGYÉPSZER INC CO, Directorate of the Regional Enterprise, Kazakhstan, TengizChevrOil Train-5 Project

START Date
END Date

The oil refinery built by VEGYÉPSZER as a subcontractor to TCO/CHEVRON, time-sheet based Train-5 project in Tengiz/Kazakhstan employing around 400 people; my duties included administering the project control of the economic management and supervising the timekeepers’ work, checking the time-sheet reports; planning and scheduling by P3; total control from the recording process to summarising the workhours for issuing monthly invoices

Position: Planning Engineer; Cost Control Engineer/Estimator, CHEMIMONTAZH LTD, Kazakhstan, TengizChevrOil Crude Export Project

START Date
END Date

I was involved in a project of Tengizchevroil as a Planner/Scheduler (Chevron Corporation), namely the Crude Export Project; I worked together with the planning team of TCO as the leader of Contractor’s planning team; I coordinated scheduling of the civil, electrical and piping works; all schedules had to be made in P3 format; my part time duty was also to manage contract issues and develop and monitor the project controls; I also had knowledge of US construction industry techniques

Planning Engineer; Cost Control Engineer/Estimator, ATCS - HILLSON DIVISION LTD, Kazakhstan, Several Agip KCO and TengizChevrOil Projects

START Date

1. 2010 to present; Agip KCO – Dietsmann SpA: Lagoon Mechanical Evaporator System civil, mechanical and electrical works



I was actively contributed to the elaboration of tender quotation from the project starting and developed the WBS of schedule, the project controlling and reporting system based on S-Curve analysis by earned value, collecting and checking data on site for the continuous progress analysis and for maintaining the project schedule