HI-TECH ENGINEERING

Scheduler, HI-TECH ENGINEERING, Engineering, Procurement and Construction Design of 3Nos 5000mt Storage tanks (21m dia x 15m height) with 4” interconnecting piping works and 3 Nos 8” x 1.15km Cargo pipelines for Fluid to be transported and stored in each

START Date
END Date
Experience Hours (Planning & Scheduling)
15550
Experience Hours (Cost Management)
0
Experience Hours (Forensic Analysis)
0

Image removed.         Developing/ maintaining and managing the Project schedules from conceptual to handing over of the project using MS-Project, Primavera P3.1 & P6.0.