Fluor SA
Fluor SA
Construction / Fabrication Planner, Fluor SA, Construction Multi Projects
Plan schedules on Prima-Vera 3.1 and MS Projects
Resource and submit work packs for approval.
Assist senior planners with budgets and estimates.
Schedule construction work scope and layout all piping work for projects assigned to Fluor at the refinery.
Do material takeoffs.
Register and follow through with all FEQ’S (Field Engineering Queries)
Issue and prog
Project Planner, Fluor SA, Project Turbo
I was part of a core team of individuals that was site based. The project was multi disciplinary, design, procurement, fabrication and erection of piping, civil works, structural steel fabrication and erection, electrical and instrumentation erection, in the petrochemical industry. Using Primavera software, I helped to compile & update level 3 schedules, providing weekly, as well as monthly reports for Management meetings. The compilation of graphs for progress measurement, indicating the earned man-hours versus the planned man-hours.
Bonginkosi Cele
Presently the Project Controls Specialist for the Managing Contractor, Fluor SA (Pty) Ltd on the Sasol Secunda Growth Programme, responsible for engineering, procurement, construction, and management of the programme on behalf of Sasol Technology.
Sound Project Controls experience in the engineering- procurement-, construction-, and commissioning management. Work experience includes motor industry, mining and petrochemical projects collected over 7 years.
Motsamai Molise
Fluor SA Planner
Current Role
Fluor SA Planner
Current Role
Project Planner, Fluor SA, Engen Refinery epcm
Preparation of level 1 to level 3 EPCM project schedule on the basis of SOW documents with the coordination of different departments and integrating sub contractors schedule into main baseline schedule. Identify defined work activities; verify durations, start dates and end dates meet the project needs. Ensure all deviations are reported. Planning and controlling of multi-disciplinary engineering related projects. Experience in pre-construction (design/tender/PO) and construction stages. Generating reports on planned vs. actual work. 2 Week look head activities reports.
Fluor SA Planner
Current Role