DEVON

Drilling Engineer, DEVON, A variety of oil and gas and engineering projects.

P
Paul Allen 👤 Member for 9 years 1 month
START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
500
  • Responsible for planning, costing, scheduling, operating, troubleshooting and supervising of the drilling of $2-$6+ million onshore vertical and horizontal oil and gas wells; Watched up to three rigs at a time in the Midland and Delaware Basin shales in over 10 counties; Well Control Certified
  • Developed individual operational procedures and designs, optimizing cost and technical parameters based on experience, available equipment, and engineered material
  • Performed regular safety checks, empowered contractors and field hands to stop the job, wrote safety specific job pro

PROCESS ENGINEER, DEVON, the leak of the well of production of oil and gas & optimization of production

START Date
END Date

ü  Analysis of the offshore production system (oil & natural gas)

ü  Analysis of completion & identification of the causes of leaks in production’s well

ü  Corrosion Analysis, Planning of up keeping of production’s well; Reducing of production’s cost

ü  Well performance & Optimization of the production