Planning Engineer, DESCON Engineering Qatar L.L.C, PMP
· Preparation of baseline program master schedule base on project requirements and perform critical path analysis;
· Analyze the work statements and drawings for preparation of level IV activity networks in order to calculate the require resource for smooth execution of project;