Engineer Planning, Descon Engineering Limited Pakistan, Power Plant Retrofit, Maintenance & Shutdowns

A
ASAD LATIF 👤 Member for 8 years 3 months
START Date
END Date

Study, review and fully understand job content and work scopes within the area. 2. Prepare, review and verify Job packages 3. Perform Job walk / site verification to ensure job packages are fully complete and satisfactory. 4. Identify/review requires material 5. Identify resource and equipment requirement 6. Identify critical path for the area 7. Plan and lead his specific area team to meet the target set. 8. To create the contingency plan for critical equipment. 9. To ensure all the task in his area are scheduled properly. 10.

Assistant Planning Engineer planning construction, Descon Engineering Limited Pakistan, shutdown Parco Refinery

A
ASAD LATIF 👤 Member for 8 years 3 months
START Date
END Date

Study, review and fully understand job content and work scopes within the area. 2. Prepare, review and verify Job packages 3. Perform Job walk / site verification to ensure job packages are fully complete and satisfactory. 4. Identify/review requires material 5. Identify resource and equipment requirement 6. Identify critical path for the area 7. Plan and lead his specific area team to meet the target set. 8. To create the contingency plan for critical equipment. 9. To ensure all the task in his area are scheduled properly. 10.

Planning Engineer / Quantity Surveyor, Descon Engineering Limited Pakistan, Satpara Dam Project Skardu

START Date
END Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Cost Management)
550
Experience Hours (Forensic Analysis)
800

Job Profile

muhammad faheem

First Name
muhammad
Last Name
faheem
Professional Since
Years Experience
0
Telephone Number
+92303 7811599
LinkedIn Profile
Facebook Profile
Twitter Profile

I am working as Assistant Engineer Contracts at Descon Engineering Limited , New Khanki Barrage wazirabad gujranwala, pakistan. i m Expert in i) Contract Draftingii) Variation Ordersiii) Extension of Timeiv) Claims v) Requests to Dispute Boardsvi) Method StatementsVii) FIDIC viii) Rate Analysis

Planning Engineer, Descon Engineering Limited Pakistan, UCH-II Power Project 400MW

N
Naseem Khan 👤 Member for 12 years 5 months
START Date
END Date
  • Preparation of Integrated Project Schedule as baseline on Primavera (P6).
  • To determine Scope of work, Work Breakdown Structure (WBS), Organization   
  • Breakdown Structure (OBS) and Work procedures/ Methodologies
  • Preparation of Weekly and Monthly Progress report for client.
  • Analysis & Forecasting of reports and Schedule Plans
  • Preparation of Interim Payment Certificates and Costing
  • Preliminary working on sub-contracting and tendering.
  • Preparation of Rate Analysis of Non BOQ’s item.
  • Prepara

Nouman Zia

N
Nouman Zia 👤 Member for 12 years 11 months
First Name
Nouman
Last Name
Zia
Professional Since
Oldest experience
Years Experience
12
  • Study project scope of work and contractual terms and condition.
  • Prepare project plan level-I to IV and cost control statement as per project milestones.
  • Drawing up plans and preparing resource loaded master schedules in Primavera P6.
  • Plan, organize and supervise for execution of construction activities of the projects according to the schedules.
  • Monitor and control the progress of the project viz.

PLANNING ENGINEER, Descon Engineering Limited Pakistan, BHP Zamzama Field Expansion Project

N
Nouman Zia 👤 Member for 12 years 11 months
START Date

·        More than 12 years of experience in the field of oil & gas development projects.

·        Extensive experience in Project Management, Project Planning & Control, Project Administration, Project Budgeting and Forecasting, Project Monitoring and Cost Control, Earned Value Management, Project Configuration and Change Management, Project Completion and handing over reports.

Planning Engineer, Descon Engineering Limited Pakistan, BYCO oil refinery

M
Mohsin Raza 👤 Member for 12 years 11 months
START Date
END Date
  • Preparation of Execution level-3 & level-4 plans on Primavera Project Planner, Indirect and direct manpower deployments.
  • Monitor progress of piping to ensure that the project is progressing as planned and the targets would be met and raise flags if the targets are likely to slip.

Planning & FEDC Engineer, Descon Engineering Limited Pakistan, DG Cement Plant, Kalar Kahar, Punjab, Pakistan

START Date
END Date

Worked on DG Khan Cement Khairpur, Chakwal, Pakistan

DG Cement Project involves 4500 Tons of equipment fabrication and erection,   having overall 3 Million man-hours. 

 

RESPONSIBILITIES