Continental Construction Limited

Planning Engineer, Continental Construction Limited, Nathpa Jakhri Hydroelectric Project

START Date
END Date
  • Executed Planning, Monitoring, and Coordination for the USD 340 Million contract for construction of the Nathpa Jakhri Hydroelectric Project at Himachal Pradesh, India.
    • River Diversion Works, 55.5 M High Concrete Gravity Dam, Four Power Intakes, Four Underground Desilting Chambers, Silt Flushing Tunnel and Gate cum Ventilation Gallery.
    • 16.062 km long, 10.15-m diameter concrete lined Head Race Tunnel.