I have been working in the oil & gas, hi-tech, chemical industries with P3 through P8 as a portfolio & execution scheduler. Worked with consultants and produced risk analysis schedules (Monte Carlo) as well. 

Fabrication Site Manager, Conoco Phillips, Alder

START Date
END Date
Experience Hours (Planning & Scheduling)
150
Experience Hours (Cost Management)
150

Working as Site Manager for green-field build of an 1100-ton module, I was responsible for ensuring on time delivery in a very schedule driven project.  I managed a team of 25 construction supervisors and project management team, tasked with co-ordinating the structural fabrication, TSA/PFP application, outfitting and pre-commissioning of the module.  With Design and material supply being the scope of a different contractor, one of the primary challenges faced was ensuring the late receipt of drawings and materials did not affect the fabricator, and structure the work in such a ma

Lorne Bussell

First Name
Lorne
Last Name
Bussell
Professional Since
Oldest experience
Years Experience
18
Guild Accreditation
GPC Member
GPC Pilot Tester

20+ years overall planning experience, starting in maintenance and shutdown planning then moving to operations and brownfield then greenfield project planning

20+ years experience in oil & gas industry covering offshore upstream, onshore LNG and pipeline transmission in both client/operator and ECPM roles Tertiary qualification in project management with experience in all phases of project delivery from FEED and detail design through installation and commissioning to project closeout and operations acceptance

Lead Project Planner, Conoco Phillips, Bayu Undan & DLNG Brownfield Projects

START Date
Experience Hours (Planning & Scheduling)
3500
Experience Hours (Cost Management)
300

ABUW Integrated Operations Support Centre

- Lead Projects Planner

 

This role is a focal point for the overall planning, development and monitoring of the integrated asset plan for capital and OPEX projects managed by the IOSC team.

 

·       Apply SPMS methodology to opportunities utilising FEL gates to develop robust CPM project schedules

Project Planner, Conoco Phillips, Reparing a number of columns, Refinery Wilhelmshaven, Germany

START Date
END Date

-  Creating  a project-schedule in Primavera 6.0

-  Problem solving between each department and the sub companies

-  Linking the activities in a correct order together with the team members

-  Creating the project structure plan

-  Creating progress curves on a daily base tracking

-  Progress-Reporting to the management

Garry Ainsley

First Name
Garry
Last Name
Ainsley
Years Experience
28
Telephone Number
01642 541554

A Project Control Engineer with experience of Planning, Cost Control, Change Management and Risk assessment.

I have began my Planning career with British Coal where I worked as a Colliery Planning Engineer, preparing production schedules, project schedules for replacement faces etc. I was also responsible for the design of Junction plans for underground works, forecasting material usage underground and in the later years preparing contract specifications and monitoring contractor performance as more private companies were engaged by British Coal.

Jamie Welch

J
Jamie Welch 👤 Member for 19 years 1 month
First Name
Jamie
Last Name
Welch
Oldest experience
Years Experience
23
Telephone Number
01469555877

My Name is Jamie Welch, I am 40yrs of age and have 19yrs experience in various planning roles within the petro-chemical industry. I served a mechanical apprenticeship and shortly after completing that moved to the planning arena. My first few years were spent in the maintenance scheduling group as a contractor and having responsibility for the planning and co-ordination of Single Unit Turnarounds, during this time my main tools were Microsoft Project and Suretrak.