Vinayak Deshpande
Primavera P6, MS-Project
CNRL
Primavera P6, MS-Project
• Involve in site projects planning from concept selection to Execution of Project. Prepare integrated Project schedule in Primavera P6 with work breakdown structure (WBS), which includes key deliverables for the project, with inputs from all stakeholders such as engineering, supply management, construction, operations & regular update it. • Get contractors input on weekly basis for schedule & cost and reporting the progress to management with S-curve and any delays in schedule.
Canadian Natural Resources Limited – The Horizon Oil Sand Project Aug 2006 – Nov 2008
Canadian Natural Resources Limited – The Horizon Oil Sand Project Aug 2006 – Nov 2008
Working with CNRL on Madrid, EPC controller with Primavera 6.2/.7 (P6). Horizon Oil sand refinery. Design of level 3 from level 4, control of both levels. Principal engineering contractor controller, first construction contractor controller.
Current Role