robert watkins
Project Planner, Arup, P500
Project Planner,
Due to the gas exploitation in the Groningen (NL) area, the Neherlands are on of the first country's in the world that experience earthquakes due to human involvement. As project planner for the P500 project, you are responsable for the resurge and implementation planning expanidng from the basic study's to the reinforcement of particular buildings. The schedule is built in Primavera P6 and shared with client and government.
Senior Construction Planner , Arup, HS2
Programme Manager for Arup's Role as Environmental Oversight Consultant on HS2 - £34bn Rail project. This project consisted of over 15 contracts put together to deliver the Public Consultation and subsequent Hybrid Bill. Arup's role as the EOC was to manage the technical aspects required to deliver the Draft and Final Environmental Statements for this stage of the project.
Planning Manager - Project Controls Specialist, Arup, Pipeline NMPPP
- Plan, monitor and control the development of the project scheduling requirements including; development of early work schedule, baseline master schedule, progress measurement, forecasting, maintenance of the Page3current schedule, resource and manpower planning, the reporting of variances from plan and the development of recovery plans for consideration by the Project Manager.
- Plan, monitor and control the development of the project cost reporting requirements including; development of WBS, recasting of the estimate to form the baseline control budget, management of committed,
Faaiz van der Schyff
Assistant Project Manager, Arup, Dubai Sports Complex
Assistant Project Manager September 08 – May 09
ARUP Gulf Limited, P.O Box 212416, Dubai, UAE
Programme & Controls Manager, Arup, 1) Arup – Dubai / Abu Dhabi / Doha Head office - All Projects - a) AL Mashtal Development – Abu Dhabi b) Canal Point Hospital – Jebel Ali c) 4.Downtown - Jebel Ali
Planning & Project Controls Managerial
· Develop / implement / manage Project Management Plan, Programme and Scheduling, Progress Measurement System (PMS), Communication Management System and Reporting System (progress and cost).
Laurence Potgieter
Direct project planning experience in Rail, Tunnels, large structures; mining, process plants, pipelines; teach junior planners and planners (and engineers); interact with project players at ALL levels from client's senior person to senior and junior engineers - all disciplines including rock mechanics, process, mechanical, electrical, C&I, civil and structural.