Construction Project Planner / Senior Planner / Forensic Analyst, Arabtec Construction LLC, 97 Luxurious Villas - Sanctuary Falls (JGE-Dubai); 1100 Villas with Infrastructure (Fujairah)

START Date
Experience Hours (Planning & Scheduling)
4000

1. Preparation of Baseline Schedule with Resource & Cost Loading

2. Allocating Time Periods for Subcontractor, as per the Maincontractors Shedule and approving their programme of work.

3. Montioring Site Progress and Preparation / Submission of Weekly / Monthly Progress Report

4. Attending Progress Meeting and listing out the Critical / Near Critical activities to Client / Consultant

5. Preparation & Submission of Interim / Final EOT Claims

Ravi Varma

R
Ravi Varma 👤 Member for 14 years 7 months
First Name
Ravi
Last Name
Varma
Professional Since
Oldest experience
Years Experience
7
Telephone Number
+971555780789

Project Planning, Scheduling & Controls Project Management & Co Ordination Schedule Risk Analysis , Active Risk Manager (ARM) & Risk Management Earned Value Management

Senior Planner / Senior Planning Engineer, Arabtec Construction LLC, NIMR Automotive Facility - Abu Dhabi, Najmat Residential Towers - Abu Dhabi, Tiara Hotels and Residential Development - Dubai, Al Waab City Project - Doha - Qatar

R
Ravi Varma 👤 Member for 14 years 7 months
START Date
Experience Hours (Planning & Scheduling)
3600
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
500

W     Project site based planning and controlling of projects from contract award to completion. Preparing Project Master Schedule / FIDIC Clause 14 programme - Fully quantified and labour resourced using planning software Primavera 6.8.

W     Programme updates and analysing variances, productivity, bottlenecks, and highlighting to Project Manager.

Senior Planner / Senior Planning Engineer, Arabtec Construction LLC, 5* Hotel Project, Automotive Facility

R
Ravi Varma 👤 Member for 14 years 7 months
START Date
Experience Hours (Planning & Scheduling)
3600
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
500

W     Project site based planning and controlling of projects from contract award to completion. Preparing Project Master Schedule / FIDIC Clause 14 programme - Fully quantified and labour resourced using planning software Primavera 6.8.

W     Programme updates and analysing variances, productivity, bottlenecks, and highlighting to Project Manager.

Planning Engineer, Arabtec Construction LLC, -High Ends Residential Building Project

START Date
END Date
Experience Hours (Planning & Scheduling)
3850
Experience Hours (Cost Management)
1950

·         Prepare pre and post contract tracker sheets.

·         Payment certificate & payments log

·         Resource & Cost Loading

·         Preparing Progress Layout

·         S-Curve & Manpower histogram Preparation

·         Prepare Recovery programs for various projects

Projects Planning Manger, Arabtec Construction LLC, Anantara Palm Jumeirah Hotel and Tiara Residences Nakheel Properties

A
Aly Mahmoud 👤 Member for 22 years 1 month
START Date
END Date

§  Head up and lead the team of skilled planners working on the projects valued at 2.5+ Billion AED including:

o   Project comprising of 2 Hotel Towers, 7 Residential Towers, Parking Building, Club House and Swimming Pools at Palm Jumeirah Dubai.

o   Project comprising of 2 high rise towers, podium and 2 parking buildings

§  Full Communication with Clients and Senior Management

Mamoon Ali

M
Mamoon Ali 👤 Member for 13 years 5 months
First Name
Mamoon
Last Name
Ali
Professional Since
Oldest experience
Years Experience
0
Telephone Number
+96555115933
  • Primavera P6
  • Microsoft Excel
  •  

Planning Engineer & Site Engineer, Arabtec Construction LLC, College of Arts and Education - Kuwait University

M
Mamoon Ali 👤 Member for 13 years 5 months
START Date

 

1.      Supervising and superintending the day to day site activities to deliver production to the maximum rate with the required satisfying level of quality according to the project specs.

2.      Coordinating the materials (Formworks) recycle plan within the site to put them at the maximum level of efficiency