Consultant, AES, Moug Duong II - 2 each 620MWs Greenfield Coal Facility
Consultant to the Owner on a twin unit 620MW Coal Facility.
Consultant, AES, LNG Facility and Combined Cycle Gas Plant
Consultant to support feasibility study, including Cost, Schedule, Construction Methodology and logistics.
Ivelin Borisov
Development and control of schedules on the project; Tracking progress, reporting and proposing recovery actions when necessary; Performing delay analysis; Generating S-curves for the management; Tracking the work progress of sub-contractors working on the project. Site experience. Preparation for arbitration between Client (AES) and the main Contractor.
AES Planner
Current Role
Planner, AES, 600 MW Coal Fired Power Plant - BULGARIA
Planner / Scheduler on a multi-billion huge EPC project for the construction of 600 MW Thermal Power Plant (including roads & infrastructure) and a Waste Disposal Facility with 4.5 km tube conveyor in Galabovo, Bulgaria. Tel. +359 886 445988