Tony Hsieh resume

T
Tony Hsieh 👤 Member for 21 years 3 months

Dear sir or madam,

 

I read the required duty descriptions from your company website and have confidence on performing the tasks of this position. You can read my qualifications on this letter and more details from my resume. My hands-on experience on procurement, engineering and construction includes:

  • Identify Work Breakdown Structure for the entire project work scope<?xml:namespace prefix = o />
  • Assist determination on contracting strategy
  • Prioritize project tasks
  • Assist establishing the project/contract management system
  • Prepare pre-qualification and bid document
  • Bid evaluation and recommendation
  • Provide ongoing guidance and hands-on performance review by project and contracts
  • Claim review and negotiations
  •  

I currently work with a construction consulting firm, and assigned to Los Angeles County Public Work Department for claim and dispute resolutions. In 1999 thru 2003, I worked on the Taiwan High Speed Rail project on expatriate base. The work experience on an international project team for a high profile project had built my strong communication skills with the team members from diverse cultural backgrounds. I have solid project control experiences on variety of projects with my responsibilities including the executive level master schedule and cost control, or the field level for construction planning and progress payment process. Change order management and time/cost claims are my other duties in the construction stage. The following table lists my major assignments and experience.

 

Project

Project Scope

Position

Assignment

Time

US Army Chemical Weapon Disposal Program

8 continental job sites from blue grass

Project Control Engineer

Engineering design management

1989 to 1992

Los Angeles Metro Red Line

Heavy Rail Subway (16.4 miles with 14 stations)

Chief Project Control Engineer

Construction management from tunnel, stations, MEP systems to integration tests

1992 to 1999

Taiwan High Speed Rail

High Speed Rail (345 Km with 8 stations) Construction Management

Assistant Project Control Manager

Construction management and reporting from the executive level

1999 to 2003

UCLA Santa Monica Hospital

Buildings replacement by 18 construction phases

Project Control Manager

Field construction management

2003 to 2005

LAUSD High School #11/Vista Hermosa Park

New constructions with methane and sulfide gas mitigation system

Project Control Manager

Field construction management

2005 to 2009

I shall greatly contribute to the project with my experience and self-development working attitude. I deeply appreciate the opportunity to discuss with you for my qualifications on this opportunity.

Sincerely yours,

L.C. Tony Hsieh