CURRICULUM VITAE FOR YEAR 2018
FULL NAME: AYMAN ABDUL-RAZIK MOHAMED
POSITION: Project Manager
Civil Engineer
PERSONAL INFORMATIONS
ADDRESS : Giza - Egypt.
Tel. : Mob. : 01147774875 – Mob. : 01062427294
E-MAIL : [email protected] - [email protected]
DATE OF BIRTH : September 17, 1971.
PLACE OF BIRTH : Cairo, Egypt.
NATIONALITY : EGYPTIAN.
MARITAL STATUS : MARRIED, havetwosons & a daughter.
MILITERY STATUS:COMPLETED "GOOD CONDUCT"
OBJECTIVES
- Increase my experience years on Civil Engineering Field.
- Apply my knowledge in Construction Field.
EDUCATIONS
- Bachelor ofCIVIL ENGINEERING, Cairo University 1994.
- Graduation Project in the ROADS & AIRPORTS ENGINEERING.
- Had passed 1st year inDIPLOMA OF CONCRETE STRUCTURES, including courses ofPROJECT MANAGEMENT , Advanced Structural Design Cairo Uni. 1999.
KEY SKILLS
COMPUTER SKILLS:
Structural Design Programs:
SAP2000, Etabs, AutoCAD, Primavera 6.
MS Programs:
MS Office (Word-Excel-PowerPoint), Oracle.
LANGUAGE SKILLS:
English:Goodin spoken/written
French:Fairin spoken/written
PROFESSIONAL EXPERIENCES
Works are briefly described.
1-From Dec. 2016 to Recent:
At Cleopatra Group for Real Estate Development and Tourist Investment
Project:
Cleopatra Square Compound Project – A 6th October City – for the Owner is Cleopatra Group Company – The project is delivering of old constructed villa after repairing works and adding an extenision building and finally with half finishings.
Position: Cleopatra Squrae Owner Representative
Project Director
Responsible for:
- Managing the works for Seven contractors of the Traditional Works and Ten contractors of the Finishing Works
- Holding of the management meeting with contractor.
- Tacting and Following up the performance of 14 Team worker Engineer.
- Coordinating between the Designer and the consultant .
- Planning the work of hardscape with the landscape.
- Evaluating the contractors performance.
- Appling the strategic goals from the project into executing plans.
2-From Oct. 2016 to Dec. 2016:
At Future Consult Office
Project:
Construction of Super Residential Buildings – At the new administrative Capital– for the Owner is Ministry of Housing )Development Buildings of Nine floors of Four apartments per floor and a basement of half finishing delivery.
Position: Construction Manager
Responsible for:
- Reviewing the quality of concrete works .
- Inspecting the steps of the finishing works .
- Setting the plan of execution on site for verifying the quality criteria.
- Preparing auditing reports for the work performance information.
3-From Jul. 2016 to Oct. 2016:
At SIAC Co. for Industrials and Construction,Egypt
Project:
4800 MEGAWATT BENI SUIF ELECTRICAL STATION – At Beni Suef Administrate -
An Infra& superstructure project– for the Owner is Ministry of Electricity )Development all items of Six utilities/networks for the oily, sanitary, storm, potable water, irrigation and duct banks of capbles of main supply of electricity from the station in additional to enbankment works of Roads.
Position: Area Manager responsible for the civil works of Infra scope
Responsible for:
- Preparing the tactics for the civil works of the Infra activities.
- Execution the civil works by full coordination with the mechanical works.
4-From Jun. 2014 to Feb.2016:
At SAAD ALMOBTY Co. for Contracting,Kingdom of Saudi Arabia.
Project:
DEVELOPMENT OF AL KHARJ INDUSTRIAL CITY Phase II.
An Infra & superstructure project delivers Compounds of Buildings and development the networks of ROADS, SEWERAGE, STORM, POTABLE WAQTER, STREET LIGHTING, MEDIUM VOLTAGE and TELECOMMUNICATION. With overall area 24 km2and one half milliard SR preliminary cost. (Owner is authority of MODON for new cities)
Position: PLANNING & FOLLOWING UP MANAGER
Responsible for:
- Preparing of project time Schedules:
Revised Baseline &UpdateTime Schedule of about 9000 activities loaded with satisfied resources and costs showing the scope changes and new items.
- Preparing of daily planned works reports and follow up performance percentage.
- Designing & Preparing of the weekly & Monthly reports.
- Supervisedthe invoices as per the planned progress.
- Responsibleoftime/cost claims and the ContractStudy and havegotatime extension(8 months).
5-From Oct. 2011 to Jun. 2014:
At MEDHAT ABOUZAID(EGYPTIAN CONSULTING HOUSE),Cairo
Project:
FORTY WEST PROJECT.
A Turn-key construction project consists of Commercial, First class Residential Buildings and Hotels of two Stories podium and six Elevated Stories. With overall area 19000m2and one half milliard EGP preliminary cost. (Owner is SODIC)
Position: STRUCTURAL DEPARTMENT HEAD
Responsible for:
- Approval the MOS for civil and repair works especially the Ground Tanks works.
- Reviewing the submitted progress schedules of works.
- Preparing of the monthly reports.
- Shared in reviewing of the contractor invoices and claims.
- Approval the steel frame works for GRC cornices and GRP panels Calculation Sheet.
- Approval the steel fixations works for Curtain wall installation.
- Shared in Inspecting the Core and Shell (concrete – masonry) works.
- Shared in Inspecting the GRC and GRP execution works.
- Shared in Inspecting the hardscape works coordinating with the infrastructure works.
6-From May2010 to Oct.2011:
At Banwh Co.for limited contracting-KINGDOM OF SAUDI ARABIA
Project:
Construction Building of Faculty of Engineering at Hail University. The building is 22000m2area and 400,000 SR, a preliminary Cost (Owner is The Ministry of High Education)
Position: PROJECT MANAGER
Responsible for:
- Shared in Preparing Baseline of Time Schedule, Planning the delay, Cash Flow Chart and the submit plan of drawings approval taking in consideration the contractors capabilities.
- Planning for the sub-contractor works.
- Coordination between Electromechanical, Architectural and structural drawings as design drawings in parallel with the materials approval from owner/consultant and preparing for detailed drawings with sub-contractors confirmation.
- Shared in reviewing the structural system of the building that had been changed to Post-Tension system the approval from consultant Zuhair Fayez.
7-From March 2009 to May2010:
At MEDHAT ABOUZAID(EGYPTIAN CONSULTING HOUSE),Cairo
Project:
ALLEGRIA PROJECT. A semi-finishing construction project of 1100 variant-design with private fence villas addition to the landscape in/out the villas. The project is 130feddensarea and 2.5 milliards EGP as a preliminary cost. (Owner is the SODIC)
Position: SENIOR STRUCTURAL SUPERINTENDENT
Responsible for:
- Planned and shared in the concrete, finishing works.
- Shared in inspection of the landscape and infrastructure works.
- Reviewed time and progress schedules for contractor work activities.
- preparing the monthly report of project progress.
- Preparation of Snagging lists and shared in handing over the activity items of BOQ.
- Shared in inspection of the water structures as Culvertsand Gulf Pools
8-From Jan.2003 to March 2009:
AtEl-Hadayek Company for Real Estate Projects,Cairo.
Project:
- Construction of Ten Buildings of Five Stories with basements, Four apartments per story, about 700m2area and one million EGP cost per Building - Construction of Eight Villas of Three Stories, about 450m2area and one half million EGP cost per building . (Owner is private ones)
- Supervising construction a compound of 63 villas on the north coast of 15.75millions EGP total cost and 25200m2 area.
Position: PROJECT MANAGER
Responsible for:
- Execution Infra-structure / sub-structure works.
- Shared in preparing shop drawings, management plans and execution procedures.
- Execution Finishing works (Interiors-Outsides-Landscape).
- Responsible for Contracts, BOQ preparation and Contractors payments.
- Supervising sewer and irrigation networks of the compound
- Follow up the piping the main electrical network of the compound
9-From Dec. 99 to Jan.2003:
AtTAMOIL COMPANYfor Petroleum services, Cairo.
Position:STRUCTURAL TECHNICAL OFFICE ENGINEER
Responsible for:
As A STRUCTURAL T.O. ENGINEER worked in:
- Structural redesign for all available stations models (about 15 models).
- Rewrite for all available BOQ with common/special specifications.
- Assign all samples available in the activities.
As An OWNER SUPERVISOR ENGINEERworked in:
- Supervise the construction of five Stations- Tanta, Kafr-Elzyat, 15th of May, El-Fayyum.
- Inspect works of stations coordinating with MEP works:
Base/Sub-base layers– Flooring (RC panels or Pavement) – RC and Steel structures.
10-From Jan .97 to Dec. 99:
AtNILE OFFICEfor CONSULTANTS, Cairo–Egypt.
Position: STRUCTURAL CONSULTANT
Responsible for:
- Supervise many villas, mosques, malls (Concrete/Finishing Works)
- Design for important projects using BS and ACI codes.
11-From June 95 to Jan 97:
11-1-At El-Assyria Co. for Contracting, Cairo-Egypt.
Position: SITE ENGINEER
Responsible for:
- Construction many buildings such as Stores, Meal Building and Big Gates with a wide variety of Finishing core and Shell , Turn-key
11-2-AtNILE OFFICE for CONSULTANTS, Cairo–Egypt.
Position: QS & STRUCTURAL DESIGNER
Responsible for:
- Structural design for Concrete projects:Villas, High-Rise Building.
- Structural design for Steel projects:Covered Bowling Halls, Factories, Steel Towers of Electricity distribution and commercial Buildings.