OBJECTIVE

 

Seeking a challenging role in the area of Petrochemical, Fertilizer, Oil and Gas to contribute towards organizational success and grow to a Senior Management level

 

SYNOPSIS

 

Young, energetic and result oriented professional with more than 5 years of comprehensive experience; Expertise in Client Coordination, Planning , Knowledge in process piping; Deep understanding of technology with focus on delivering business solutions; Adroit at analyzing the organization requirements; Highly ethical, trustworthy and discreet

 

EDUCATIONAL QUALIFICATIONS

•        B.Tech with specialization in Mechanical Engineering from L.B.S college of Engineering, Kasaragod , Kannur University, Kerala, India  in 2008 

 

PROFESSIONAL EXPERIENCE SUMMARY:

    5Years’ Experience in Mechanical   Engineering Planning/Scheduling (Shutdown/Construction)

 

·         Planning & Scheduling of EPC Projects & Maintenance of Process Equipment’s-Columns, Heat exchangers, Vessels, Furnaces, Valves etc. (OIL & GAS)

·         Project & Shutdown coordination, Work packs preparation, allocation/Control of Resources, activities, Liaison with Client, Sub contractors.

·         Hands on Experience on SAP Plant maintenance Module and Prometheus Software(GPSS.Graphical Project system Scheduler)

·         Construction/Maintenance/Shutdown schedule preparation on Primavera 6./MSP

·         Preparation of Progress Reports and S Curves/Resource Leveling/Manpower Histograms for    Management Review.

 

 

Madina Group.WLL                                                                                                       (Jan 12 – Present)

Maintenance Turnaround Planner/Scheduler

Duties and responsibilities

·         Has Successfully Completed the Total Facility Shutdown 2013 at Oryx GTL having been assigned as Assist. Project leader for Gas Loops 1 & 2 of Oryx Gtl  Plant

·         Has worked as a planning coordinator for 2 yearly Statutory Inspection & Maintenance of 3 Boilers at Oryx GTL, Ras laffan Qatar within a Span of 6 Months Have vast Experience in Cost Analysis and shutdown Contracts Control.

·         Preparation of Cost Reports/Close out Reports and good presentation Skills to communicate with the Top Management.

·         Currently Busy with Work pack & Schedule Preparations for 2015 Total Facility Shutdowns at Oryx Gtl.

·         Excellent People management skills and good communication Skills to Hold High level Meetings during Shutdowns.

·         Has good Technical Knowledge on Static Equipment’s like Exchangers, Vessels And Collumns.Has handled the Work Pack Quality management team and Has Supervised Work pack Preparations for 2013 Total Facility Shutdown

·         Arranged Kick off Meetings and Shutdown Rationale Meetings to Explain Shutdown Requirements and Govt. Regulations for Statutory Inspections.

·         Scheduling of shutdown works in Prometheus, SAP & MS Projects.

·         Preparation of master schedule for maintenance. Resources Planning & S curve preparation in excel.

·         Updating progress of works during shutdown & preparing daily & weekly reports supported by S curves.

·         Arranging & presiding in cold eye review meetings.

·         Execution of maintenance works during shutdown to ensure work completion as per plan.

·         Material handling & maintaining SAP material master Data.Well versed in material transactions ZINV, ZSHR, Me5a, Me53n, MD04, MMBE & MM03.

·         Work order management & controlling PM order cycles.

·         Optimizing maintenance plans in SAP.

·         Well Versed with SAP MM Module and PM Module.

·         Maintaining Standardized naming conventions, field usages and, variants setup in IH08/IH06 etc.

 

 

 

 

 

Integral services company.WLL                                                                                 (Oct 10 – Jan 12)

Maintenance planning & Execution Engineer (Boiler)

Duties and Responsibilities:

 

•        Preparation of overall maintenance program, monitoring project progress against planned schedules, analysis in the change of contract scope, activities / delay, if any.

•        Updating daily progress report, preparing weekly progress report, weekly management meeting report & Monthly progress report.  

•        Updating Daily Capacities in project Systems and estimating daily manpower Costs.

•        Preparation of maintenance procedures and monitoring its application on site. Coordinate with Material department about purchasing orders and material delivery at site.

•        Direct control over maintenance workforce at site.

•        Preparation of Maintenance Schedules in Primavera-6 and Excel.

•        Co-ordination with all section in-charge for optimum manpower and equipment usage. Maintaining manpower, equipments mobilization/demobilization details.                   

•        Assisting Senior Boiler Engineer for execution of Daily Activities.

•        Preparing invoices, inspection reports and maintenance reports for Client.

 

 

 

PROJECTS HANDLED

           

Project - #01        

Title:                      Maintenance shutdown for boiler-1050MW (Doha east power station) 

Role:                      Boiler Maintenance planning & Execution Engineer

Client:                 Ministry of electricity & water, Kuwait

Location:             Doha, Jahra

Duration:            Oct’ 10 – Till date                                              

 

Key Deliverables  

 

•        Site Co-ordination to Field Execution team, Material arrangements, Monitoring of Daily Progress.

•        Have Planned & Physically coordinated Rotary Air Preheater maintenance during 2 shutdowns of Doha east power station. Type -Ljungstrom regenerative Heater with 24 Basket Sectors.

            Rotation speed-6 RPM

           Basket Materials-For Hot side-Carbon Steel

                                          Intermediate Side-Mild Steel

                                          Cold Side-Corten Steel

Axial Seal Adjustments-Spring Adjusted with canister type adjustments.

Radial seal clearance-5mm & 8 mm in hot side (near end & far End of the Rotor)

                                        5mm & 12mm in cold side (near end & far End of the Rotor)

          

•        Witnessing & monitoring maintenance works at site for mechanical equipments, water wall tubing’s and ducting’s.

•        Preparing the progress report based on the activities done by each section and submits to clients.

•        Preparation of maintenance reports for each unit of 7 boilers to facilitate invoice preparation.

•        To ensure all work forces comply with planning compliance in order to maintain excellent workmanship and in-line with strategic planning, Company’s maintenance policies and procedures, HSE.

•        Preparation of invoices for additional works done on different parts of the boiler.

•        Maintaining manpower, equipments mobilization/demobilization details.

•        Preparing inspection reports and invoices for the different maintenance activities carried out.

•        Arranging workforce for emergency shutdown jobs in short notice of time.

 

Achievements-

•        Have completed 2 emergency shutdowns on boiler water wall tubing repairs (SA210 GR1) within Time Avoiding Production losses.

•        Have managed Shutdown Workforce during the Absence of Senior Boiler Engineer.

•        Have supported MEW with manpower and maintenance Expertise for hydro tests and plant Startup Procedures.

•        Have acquired good knowledge on mechanical EQUIPMENT MAINTENANCE OF BOILERS-MAKE IHI JAPAN AND FIVES CAIL BABCOCK, FRANCE

•        Has handled both maintenance and QC jobs during emergency shutdowns.

•        Has worked as quality control Engineer for a period of two months.

 

 Dorman Engineering Private Limited                                                                         (Jan 09 – Mar 10)

  Piping Engineer Jr  

           

PROJECTS HANDLED

 

Project - #01        

Title:                      FRE Revamp

Role:                      Jr.Planning Engineer (Piping) & Site Coordinator

Client:                 Hindustan Petroleum Corporation Limited (HPCL)

Location:             Mumbai, India

Duration:          Oct 09 – Mar 10   

Key Deliverables  

•        Preparing and Updating Daily fabrication Plans in Excel.

•        Maintaining Pipeline Fabrication & welding updates on a Daily & weekly basis.

•        Inspection of piping layouts as per P& IDs and Isometric drawings.

•        Updating daily report, WNS, Fit-up and NDT reports

•        Preparation of MTO with the help of P & ID’s & Isometric Drawings & also Coordinate With Material Controller, verify and confirm all piping materials, fittings, valves, etc

•        Coordinate with Safety Department for ensuring compliance with Health, Safety and Environmental   Procedures.

•         Responsible for quality control and inspection of the manufactured components. 

•         Material inspection and documentation verification according to purchase order during Line check.

•        Conduct surveillance inspection involving welding and painting work.

•         Supervises the team for timely and accurate work execution

 

Project - #02        

Title:                      Fabrication & Erection of Piping works

Role:                      Jr.Planning Engineer (Piping) & Site Coordinator

Client:                  Bhushun Power & Steel Ltd

Location:             Sambalpur, Orissa, India

Duration:            Jan 09 – Sep 09   

Key Deliverables  

 

 

•        Inspection of piping layouts as per P& IDs and Isometric drawings.

•        Preparing and Updating Daily fabrication Plans in Excel.

•        Maintaining Pipeline Fabrication & welding updates on a Daily & weekly basis.

•        To support the lead site engineer in the above discipline.

•        Updating daily report, WNS, Fit-up and NDT reports on daily basis.

•        Conduct surveillance inspection involving welding and painting

 

 

Aum Consultancy pvt ltd.

Junior Process Engineer

 

PROJECTS HANDLED

 

Title:                      Design of pressure vessel

Role:                      Junior process engineer

Client:                Visakhapatnam oil extraction plant

Location:             Chennai, India

Duration:            Aug 08-Dec 08   

 

 

Key Deliverables  

  

•        Responsible for the design of pressure vessels according to ASME section VIII.

•        Interpretation of piping layouts from the different P&Ids.

•        Tracking flow characteristics of fluids in pipes and selection of pipes on the basis of the results.   

•        Design optimization for pressure vessels & exchangers.

•        Has performed Duties as Assist. Commisioning Engineer for “Mango Kernel Oil extraction Plant”, Thirupathur.        

 

 

            

TECHNICAL SKILLS

 

Planning software:                                        P6, SAP, Prometheus, MS projects

Basic Design and Modeling Tools:              Basics in AUTOCAD, CATIA-V5

Office:                                                                   Microsoft Office, Microsoft Access, Microsoft Excel        

 

 

STRENGTHS

 

•        Proven ability to work effectively in both independently and team environments.

•        Good adaptability to multinational environments, with exposure to various cultures and customs.

•        Excellent communication and soft skills.

•        Interest and ability to learn and apply new skills.

•        Good leadership and interpersonal skills.

•        Committed and hardworking.

•        High result orientation – getting things done on time and as per agreed upon norm

•        Highly active and ready to take up challenges.

•        Fast learner.

 

 

 

PERSONAL VITAE

     

  • Permanent address                       : “Prashanthi”,Pathiriparamba,

                                                        Mele chovva

                                                        Kannur, Kerala

                                                 India

  • Father’s name                                : K.T Ramakrishnan
  • Date of Birth                                   : 9/12/1984
  • Nationality                                       :  Indian
  • Languages Known                        :  English, Hindi, Malayalam, Tamil & Arabic.
  • Marital status                                 :  Single
  • Passport No                                   :  H1979369 valid up to 2019