Position:          Lead EPC Planner/Scheduler

Education:       Quality Control, San Jacinto College, Pasadena, Texas.

                        Continuing Education, Wallace College, Dothan, Alabama.

                        Continuing Education, Troy State University, Dothan, Alabama.

Courses:         Advanced Cost and Schedule Control - By AACEI

                        P3e/c & P5 Course by Commint.                                                                              

                        P6 Course by BP‘s North American SME.

                        Schedule Risk Analysis using Pertmaster for P6.

Affiliations:     

American Association of Cost Engineering International

Project Controls Professionals Linked-in

The Guild of Project Controls – Planning Planet

General Summary:

Work Summary: I have thirty years of EPC planning and scheduling experience for all phases of industrial projects. I’ve worked in the Home Office engineering environment preparing schedules for project phases ranging from conceptual to commissioning.  I’ve worked on numerous new construction sites supporting management on ‘Grass Roots’ and ‘Expansion’ projects.  I’ve assisted clients with ‘self-perform’ construction management and turnarounds.  My responsibilities have included working as the Project Controls Manager, Project Controls Specialist, Construction and Turnaround Planner/Scheduler.  Prior to working in project controls I worked eleven years as a pipefitter, welder, and welding inspector on both new construction and capital projects.

Industry Summary: Most of my experience has been in the oil and gas industry.  I also have experience in chemical and plastics production, copper and phosphate mining facilities, steel making capital projects, pharmaceutical manufacturing sites, office building construction and blast proofing of existing structures as well as industrial security enhancements (post 9-11).

People Skills: My understanding of engineering and construction deliverables enables me to comfortably conduct interactive planning sessions in most EPC environments.  I’m comfortable interacting with all engineering disciplines, buyers, contract administrators and project managers.  I relate easily with construction coordinators, superintendents and site managers.  I enjoy the enjoy working with other project controls personnel and am able to maintain a professional demeanor in stressful situations.

Computer Skills: I'm proficient with the use of the latest industry standard scheduling software.  This includes Primavera (P6 ver. 8.3) and MS Project 2010.  I’m proficient with MS Office software (Excel, Word, Outlook, Access, Power Point).  I have experience using SAP and JD Edwards cost and procurement programs.  I also have experience using many client specific databases for managing cost, progress measurement, drawings and equipment files.

 

Representative Projects:

  1. Turnaround Planner/Scheduler for commissioning of a large expansion project at the ExxonMobil Refinery in Baytown, TX.  The multi-unit shutdown (commissioning) included replacement of several towers, reactor tray and catalyst replacements, pump rebuilds, exchanger cleaning/testing for re-rating, foundation modifications and 500 piping tie-ins, 750 field welds on 560 isometric drawings.
  2. Lead Planner/Scheduler for design and construction of an “Arctic Class” drilling rig.  Prepared schedules for numerous design and construction scenarios for a state of the art onshore drilling rig designed to exceed all onshore drilling depth records.  Also, prepared and monitored the refurbishment schedule for a barge type drilling rig in port, as well as a schedule for relocation and upgrade of an existing drilling in the Middle East.
  3. Project Controls Specialist for construction management of a new dock and storage tank facility for Intercontinental Terminals Company (ITC) in Pasadena, Texas.  Developed a WBS for non-existent cost reporting and scheduling structure for a “self-perform” EPC construction management project.  Provided cost and schedule requirements for contractor bid packages.  Prepared overall site schedule and contractor bid schedules.  Setup cost reporting structure that aligned with the existing JD Edwards accounting system.  Funding was eliminated for project controls.
  4. Principal Specialist Planner/Scheduler for a proposed grassroots onshore LNG plant in Tanzania, Africa.  Provided bid package schedules for various locations along with contract requirements for bidders and WBS structure for numerous EPC bid packages.
  5. Senior Planner/Scheduler for numerous refinery small and mid-cap projects at Jacobs Houston, TX office.PPrepared and updated various levels of EPC schedules for small and mid-cap projects. Prepared proprietary level one monthly schedules and critical path reports.  Provided proposal and work around schedules as needed.
  6. Shutdown Planner/Scheduler for Eastman Chemicals “Polymers Shutdown”at the Kingsport, TN. facility.  Provided detailed shutdown schedule based on maintenance work orders and capital projects.  The schedule was organized by the clients WBS in SAP and was resource loaded by work group for each shift.  Conducted daily meetings with operations and site management during the shutdown.  Provided daily critical path analysis, progress reports and resource requirements for the next two shifts.
  7. Senior Planner/Scheduler for the BP refinery “Flare Gas Recovery Project” at the Texas City, TX. Site.  Worked with the resident engineering contractor to provide an integrated level four (detailed) construction and commissioning schedule.  This effort also included three sub-projects that needed to be completed and started up prior to commissioning the FGR project.  I conducted weekly schedule update meetings and provided a three week look-ahead schedule support the weekly reporting cycle.  I also provided a monthly critical path analysis and Level 1 schedule for the monthly reports.
  8. Senior Planner/Scheduler for the Non-Road Diesel OSBL Project at ExxonMobil in Baytown, TX.  Provided level four (detailed) construction schedule.  Conducted weekly schedule update meetings.  Provided Monthly critical path analysis and progress reports, along with work around/recovery plan schedules when needed. 
  9. Lead Construction Scheduler at the Motiva, Crude Expansion Project (Power Station 4) in Port Arthur, TX.  Worked three months in the home office on the engineering schedule. Moved to the field and refined the existing schedule and monitored weekly progress.  Prepared daily 'Plan of the Day' (POD) schedules. I provided work-around/recovery schedules when need (we had late material problems).  Project was shutdown due to the reduction in oil prices.
  10. Project Controls Lead at the Shell Refinery in Deer Park, TX.  Assumed responsibility of the construction management schedule and cost reporting function for a new six story administration building and parking area.  Reviewed and monitored general contractor’s invoice and schedule progress.  Prepared data for monthly cost and schedule reports.
  11. Lead Planner/Scheduler at the BP Refinery in Texas City, TX.  Worked with BP production planners and Unit Supervisors to prepare and maintain commissioning schedule for startup of the refinery and chemical plant after hurricane Ike.  Integrated schedules from turnaround, maintenance and capital projects with operations startup activities.  Prior to that I prepared and maintained numerous EPC schedules for small and mid-cap projects in the refinery and chemical plant.  Conducted interactive planning sessions at various stages of projects.  Worked closely with engineers and construction coordinators to prepare, and monitor progress.
  12. Construction Planner/Scheduler for Eli Lilly T100 - 5th Unit of Capacity Project in Lafayette, IN.  Worked with Cincinnati office engineer's and lead designer's to develop level 2 construction schedule prior to mobilization.  Continued to provide additional detailed construction schedules as engineering advanced.  Project scope was reduced by Eli Lilly corporate office.  Construction program management team was released.
  13. Turnaround Planner/Scheduler at ExxonMobil Refinery in Baytown, TX.  Worked with Exxon Mobil turnaround planners, execution supervisors, operations personnel and in-house contractors to plan, estimate and prepare detailed resource loaded schedules.  Worked with client and contractors to develop a comprehensive manpower plan.  Assisted with logistics of turnaround (heavy equipment, material and tool's).  Input progress daily and published look-ahead schedules.  Monitored progress, productivity, critical and sub-critical path.
  14. Turnaround Planner/Scheduler for Bayer’s Plastics Expansion Projects in Baytown, TX.  Worked with engineering discipline leads to prepare detailed engineering schedules and cost reports for five expansion projects.  Prepared progress curves and manpower forecasts by discipline for each project. Updated schedules weekly and issued for project team use.
  15. Turnaround Planner/Scheduler for Hovensa’s FCC Unit shutdown in St. Croix, USVI.  Reworked previous T/A manloaded schedule prior to start of 2000 T/A.  Developed work-around schedules with plant maintenance planners and other specialty contractors as needed.  Assisted area superintendents, plant inspectors, maintenance supervisors and unit engineers with planning and execution of work.
  16. Project Controls Lead for Bayer’s “Makrolon” Shutdown in Baytown, TX.  Developed and monitored EPC schedules for forty three capital projects which were completed in a thirteen day shutdown.  Continuously monitored contractors progress and critical path during turnaround.  Reported progress and system turnover status at daily meetings.  After completion of T/A, I assisted the corporate engineering department managers with development of a long range engineering manpower forecast for seven major upcoming expansion projects at the Baytown facility.
  17. Project Controls Lead for construction management of Shell-Norco’s Olefins Debottlenecking Project in Norco, LA.  Compiled all sub-contractors schedules into a master project schedule.  Monitored each contractor’s progress.  Held coordination meetings with multiple lump sum contractors twice weekly in order to manage demo, refurbishment and new construction of an existing Ethylene unit.  Assisted project/field engineer’s with system turnover and start-up coordination at end of project.
  18. Project Controls Manager for new construction of Kerr-McGee’s TiOPigment Expansion Project in Hamilton, MS.  Managed various levels of schedule development.  Coordinated integration of cost and schedule.  Supervised cost reporting and documentation of changes.  Prepared weekly and monthly cost/schedule analysis reports.  Prepared backup for monthly invoices.
  19. Capital Projects Planner/Scheduler for ongoing capital projects at Bethlehem Steel in Baltimore, MD.  Prepared capital appropriations schedule during conceptual phase of projects.  Prepared detailed construction schedules as the engineering developed.  Updated project schedules weekly for review with Bethlehem’s management team and the capital work force supervisors.  Worked with Bethlehem scheduler to issue manpower projections on monthly basis for 50+ projects.
  20. Capital Project Planner/Scheduler for construction management of Genetics Institute’s Suite “B” Project in Andover, MA.  Developed fully integrated engineering, procurement, and construction schedule with the home office scheduler in Cincinnati.  Issued proposal schedules for 35 sub-contracts. Monitored all sub-contractors scheduled progress.  Held weekly schedule/coordination meetings.  Performed continuous analysis to manage “Flash Track”project working days and nights.  Started site work when engineering was only 15% complete.
  21. Project Controls Lead for construction management of FMC’s agricultural products plant expansion in Baltimore, MD.  Developed construction schedule and client specific progress reports in order to monitor sub-contractors daily progress.  Multiple outages were required for modularized unit installation with numerous tie-ins to existing piping, electrical and control systems. Work had to be accelerated by two months in order to meet client’s seasonal product sales due to a fire and lengthy startup of the modified facility.
  22. Project Controls Lead for construction management of a grass root chemical plant in Augusta, GA. for International Flavors and Fragrances.  Monitored sub-contractors schedules and measured progress.  Updated and issued project schedule for use at weekly schedule/coordination meetings.   Prepared weekly progress report for contractors.  Monitored piping erection and testing progress at the iso and system level on a daily basis at project completion in order to assist local contractor with meeting expected finish date.
  23. Construction Planner/Scheduler and Buyer for fast track construction of a grass roots Ethylene Plant at Westlake Petrochemicals in Sulphur, LA.  Developed prioritized construction schedule with field need dates for all equipment and commodities.  Included detailed detailed man-loading.  Worked with the home office planner in Houston to merge the engineering, procurement and construction schedule prior to mobilization.  Construction started when design was 28% complete.
  24. Lead Cost Engineer/Scheduler for construction of a phosphate mining facility for CF Industries, Inc. in Bartow, FL.  Maintained existing construction schedule.  Developed client specific cost and quantity tracking databases for all disciplines.  Prepared weekly labor analysis, progress curves and productivity charts.  Supervised cost reporting and forecasting.
  25. Senior Planner/Scheduler for construction management of an Electrorefinery at Cyprus Miami Mining Corp. in Globe, AZ.  Provided proposal schedules for multiple lump sum bid packages, evaluated contractors proposal schedules for logic, duration, and proper manloading.  Compiled and integrated all schedules into master project schedule.  Assisted with development of turnover packages and startup of Electrorefinery.
  26. Area Planner/Scheduler for construction of a Hydrotreater and Utilities units at Koch Refinery in Corpus Christi, TX.  Developed schedules for specific unit’s, tracked progress, coordinated construction effort with other area Planners.  Worked closely with area superintendent on manpower planning and progress tracking.  Provided turnover and startup schedule at completion.
  27. Cost Engineer/Scheduler for construction of a Catalyst Demetallization Unit for Coastal Refining Company Inc. in Wichita, KS.  Tracked schedule progress, collected and reported cost to the home office, prepared labor analysis and weekly progress report.  Prepared turnover schedule at completion.
  28. Construction Planner/Scheduler for construction of a recovery boiler for Gulf States Paper Company in Demopolis, AL.  Developed schedule, tracked progress, prepared labor and cost performance reports.  Assisted programmers with development of new progress measurement database.
  29. Turnaround Planner/Scheduler for rebuild of a recovery boiler for Stone Container Corporation in Florence, SC.  Developed and tracked hourly schedule for replacement of superheater, economizer, piping and electrical modifications to existing boiler.  Included three months of pre-outage work as well as 30 day (24/7) outage.
  30. Construction Planner/Scheduler for replacement of two recovery boilers for Georgia-Pacific in Cedar Springs, GA.  Developed totally integrated project schedule with other contractors.  Included engineering, procurement, demolition, erection and startup of each boiler.  Assisted prime contractor and engineering company with integration of all sub-contractors work plans into the master schedule.
  31. Turnaround Planner/Scheduler for annual shutdown of the 536 Crude Still at the Lyondell refinery in Houston, TX.  Prepared shutdown schedule and monitored progress of maintenance and capital improvements.
  32. Maintenance Planner/Scheduler for routine maintenance of the Dow Chemicals facility in La Porte, TX.  Ordered materials and scheduled appropriate maintenance personnel and/or specialty contractors on a daily basis in order to maintain on-going plant operations.

     

Employment History:

Worldwide Turnaround Management             2014 - 2016                                      

Turnaround Planner/Scheduler                      Feb. thru Jan.

Parker Drilling                                             2013 – 2013

Engineering Planner/Scheduler                     Apr. thru Dec.

 

KAP Project Services                                 2013 - 2013

Project Controls Specialist                           Jan. thru Apr.

Kellogg, Brown & Root (KBR).                     2012- 2013

Principal Specialist Planner/Scheduler          Jul. thru Dec.

Jacobs Engineering                                     2001 - 2012

Lead Planner/Scheduler                           

CDI Engineering                                          2001 - 2001

Project Controls Specialist                          (Project Canceled)

Jacobs Engineering                                     2000 - 2001

Turnaround Planner/Scheduler                      (3 Month T/A)

CDI Engineering                                          1999 - 2000

Project Controls Specialist                           (6 Month T/A)

Jacobs Engineering                                     1996 - 1999

Planner/Scheduler, Cost Engineer

ABB Lummus Global                                   1995 - 1996

Construction Planner/Scheduler                    (6 Months)

Jacobs Engineering                                     1991 - 1995

Planner/Scheduler, Cost Engineer

Sunland Construction Company.                  1989 - 1991

Planner/Scheduler

Mundy Construction Company.                    1981 - 1989

Pipefitter/Welder and Maintenance Planner

Brown & Root Construction                          1979- 1981

Pipefitter and Material Controls

Brown & Root Construction                          1975 - 1979

Pipefitter Helper and Field Material Expeditor