Now you can upload your resume directly to Monsterusing Word 2007!
- Install Monster’s Easy Submitadd-in by clicking the “Install” icon on the menu ribbon.
- Once installation is complete, restart Word.
- Click on the “Upload” icon to upload your resume to Monster.
For any issues or questions, please visit theEasy Submit installation support page.
To close this reminder, click the border and then press DELETE.
Roy B Lozano
Employment Pass (EP) Number: G5061281W, Passport Number: XX2628302
07-4347 Blk 803, Yishun Ring Road, Singapore nSingapore 760803
nHP: (+65) 83857325 Telephone (+65) 65260503 nEmail: [email protected]
Sitio Salvacion, Maguikay, Mandaue City, Cebu nPhilippines 6014
nHP:(+63) 9193943417 Tel/Fax: (+6332) 4227260 nEmail: [email protected]
Career Objective: To work in a professional way without hesitation and reservation! Given experience and aptitude, I will progress into senior level specialising in construction for Oil & Gas Industries.
Experience
Professional Qualification (1995 – 2011)
Significant experience in oil and gas for Electrical and Instrumentation scope of work; which includes shutdown works, expansion projects, modification, mechanical completion, pre-commissioning and commissioning activities, and project management.
Result-oriented. Speaks English and Filipino; conversant in Hindi and Arabic.
Shaw Stone & Webster Asia, Inc.
Gate #1, 100 Jurong Island Highway, Singapore 627867
Project: Singapore Parallel Train (SPT) Olefins Recovery & Utilities Project
ExxonMobil Chemical Asia Pacific Pte Ltd
Supervisor Instrument, August 2011 – Present
- Supervise and monitor daily construction activities.
- Assist the pre-commissioning department for day to day requisition on Instrument disconnection, removal and re-instatement.
- Clearing of punch list items on Loop Folders, and helping/assisting the Loop Check group to achieve its target loop checks per day.
- Signing of work permits, JSA, and material requisitions
- Participate on daily tool box meeting
ABB Pte Ltd
Singapore 139935
Project: Singapore Parallel Train (SPT) Project
ExxonMobil Chemical Asia Pacific Pte Ltd
New SPT Gate, 100 Jurong Island Highway, Singapore 627867
QA/QC Engineer/ Coordinator, Oct 2010 – June 2011
- Lead and maintain relevant documentations.
- Liaise to the client; attend daily meetings and interfaces with all associated departments for daily activities.
- Prepare, review and endorsement of test packs and dossiers.
- Clearing of punch list items both construction and engineering issues.
- Involved in the field inspection and verification.
- Loop Check Coordinator. Worked side-by-side with FWP (Main Contractor) Project Coordinator and overall Project Manager for fast tracking andprogress monitoring.
- Unit Shutdown Lead; involved in pneumatic/cable/tubing tie-end, and other related electrical and instrumentation activities.
- Other related activities, assisting in the preparation of daily work permits.
ABB Norway
Doha, State of Qatar
Project: Qatar Aluminum Smelter Plant (QATALUM)
Qatar Petroleum and Norks Hydro Joint Venture
Mesaieed Industrial City, State of Qatar
Interface Coordinator/ QA/QC Engineer, Oct 2009 - May 2010
- To report and work with project manager on a regular basis and more specifically when decisions with an impact on the strategy of the project are needed. Ensure the smooth progress and completion of the project within cost, time and quality standards.
- Responsible in making necessary arbitration between contractors in case of conflict such as potential problems, issues associated with late or missing information around interfaces, communication breakdowns, and to resolve while keeping all the parties informed. Ensure satisfactory close out and sign off all interface actions.
- Liaise with client and suppliers for quality issues, such as fabrication and installation activities. Provide input to weekly and monthly progress reports.
- Coordinated daily construction activities. Control daily activities of sub-contractors on schedule requirement and engineering interface.
- Performed routine quality control inspections, such as field installation activities. Respond to (RFI) request for inspection, witness modifications, control room panel lay out, cable installations and terminations, prior to hand-over to the client.
- Review and provide tested and accepted documentation required for project completion.
- Issued punch list for outstanding works and document result in accordance to approved Project Owner procedures and specifications.
- Other related activities, also involved in HSE matters and preparation of Work Permit System.
RYNZ MARKETING
(Contracting/Distributor/Trader)
Mandaue City, Philippines
Project: Entrepreneurships/Trading
Mandaue City, Philippines
Owner, June 2002 to PRESENT
- Implement and enforce all company policies, procedures and practices.
- Highly involved and consulted on various aspects on contracting and marketing activities.
- Establish and implement strategic preparation for business location.
- Owner/finance construction activities like telecommunication and electrical works. Work includes pulling cable, splicing and termination of copper and fiber optic cables; telephone system; electrical wiring and installation of panels and lighting fixtures.
Accomplishments:
- Apo– Cemex Plant Project
- Hilton Cebu Resort and Towers (Level 18 & 19) Project
- CoralPoint Group of Companies
- M. ZED School Project
- CenturyPlazaCommercial Complex Project
- Southern Leyte State College of Science and Technology (SLSCST) Project
- Gaisano Department Store Project
- PLDT Projects
- Globe Projects
- Globe-Islacom Projects
- MetroBank PlazaProject
- Cebu-MactanInternational AirportProject
- Municipal Hall Project
- Maria Luisa Subdivision Project
- Ceniza Petron Station Project
KELLOGG BROWN & ROOT INT’L INC. /TECHNIP PROJECT
Dodsal Pte. Ltd.
Doha, State of Qatar
Project: Qatar Petrochemical (Q-CHEM)
Mesaieed Industrial City, State of Qatar
Foreman Instrumentation, Aug. 2001 to June 2002
- Earned a reputation as a trusted staff: “Awarded/certified as QA/QC Instrumentation Inspector for acting as good counterpart by Kellogg Brown & Root Int’l Inc./Technip Project (KBRT)”
- Strict implementation of project quality plan in accordance to Standard and Specifications.
- Monitor construction activities. Witness, testing and inspection from installation to the field-testing activities as per standard requirements and specifications.
- Check and review all loop test packages as per stated attachments and requirements.
- Performed pre-commissioning and clearing the final punch list for mechanical completion.
Eupen Cable Asia, Inc.
Cordova, Cebu, Philippines
Project: Manufacturer of Fiber Optic Cables
Cordova, Cebu, Philippines
Quality Assurance Engineer, July 2000 to Aug 2001
- Lead, implement and maintain ISO 9002.
- Monitor and evaluates related standards at all stages of production, from raw fibers, process lines (colouring of fibers, tubes, stranding and sheathing), to Fiber Optic Cable (Final Product).
- Specified implementation of standards, methods and procedures for inspection to achieve product precision, accuracy and reliability.
- Monitors and implements corrective and preventive actions for continuous improvement and prevention of non-conformance.
TECHNIP/BECHTEL PROJECT
Consolidated Contractors International Company S.A.L.
P.O. Box 70193, Habshan, Abu Dhabi, United Arab Emirates
Project: Onshore Gas Development, Phase 2 (OGD 2)
Habshan, Abu Dhabi, United Arab Emirates
Chargehand Electrical & Instrumentation, Nov 1999 to June 2000
- Preparation, implementation and execution of all Instrumentation Scope of Work as per Standard and Specification.
- Pulling of cables to different environment such as underground, trench, ducting, cable tray, and conduit from different locations and destination.
- Cable gland and termination, installation of Field Instruments and Junction Boxes, and performed Bench and Field Calibration.
- Control Room Layout:
- Installation of Instrument Panels and Cabinets
- Cable Tray Layout
- Pulling Cable/ Cable Routing and re-routing
- Cable Gland and Termination
- Fabrication of supports for cable tray and conduit installation.
ISLA Communications Company, Inc.
Cebu City, Philippines
Project: Construction of Telecommunication Facilities
Cebu City, Philippines
Junior Engineer, June 1999 to Nov 1999
- Evaluation of abnormalities in site condition of cables that may result to sub-standard construction or abnormal function of the network.
- Evaluation and testing of fiber optic and copper cable. Conduct cutover & splicing, telephone installation, troubleshooting and repair.
- Perform fiber optic and copper cable acceptance and warranty testing.
Jamjoom – Wescon Saudi Arabia Co. Ltd
P.O. Box 2864, Jeddah, Kingdom of Saudi Arabia
Project: Construction and maintenance of oil fields
Kingdom of Saudi Arabia
Lead Electrical & Instrumentation, July 1997 to June 1999
- Preparation, implementation and execution of all instrumentation scope of works.
- Worked both construction and maintenance which includes shutdown works, modification, expansion, punch list clearing.
- Performed calibration and installation of process field instruments, impulse tubing, cable tray layout, conduit, fabrication of supports, loop checking and commissioning.
- Additional scope of work includes material take-off, and filing of daily Work Permits (having passed the written examination for Saudi Aramco’s Work Permit System).
Construction:
- Saudi Petrochemical Company (SADAF)
- Saudi – Yanbu Petrochemical Company (YANPET)
- Saudi – Aramco Mobil Oil Refinery Company Ltd. (SAMREF)
- Saudi – Aramco National Gas Line (NGL)
Maintenance:
- Petromin Lubricating Oil Refinery Co. 2 (LUBE – REF 2)
- Saudi – Aramco Jeddah Oil Refinery Co. (JORC)
- National Titanium Dioxide Company (CRISTAL)
Philippine Global Communications, Inc. (PhilCom)
Cebu City, Philippines
Project: Construction and maintenance of Telecommunication Services
Cebu City, Philippines
Junior Engineer, June 1995 to July 1997
- Preparation of necessary documents such as test results and other protocols. Supervise cutover and splicing activities perform by contractors.
- Clearing & rectification of deficiencies in conjunction with the outside plant activities.
- Conduct installation, troubleshooting and repair of telephone, fax & telex machines.
EDUCATION
8 December 1995 Professional Board
Professional Electronics and Communications Engineer
Philippine Regulation Commission (PRC)
Republic of the Philippines
27 May 1995 Graduated
Bachelor of Science in Electronics and Communications Engineering
Cebu Institute of Technology
Cebu City, Philippines
ORGANIZATION/AFFILIATION
Institute of Electronics and Communications Engineers of the Philippines (IECEP)
Republic of the Philippines
AWARDS
- Safety Awardee for the Month of May 2002
Q-Chem Petrochemical Complex
MesaieedIndustrial City, Doha, State of Qatar
- Safety Awardee for the Month of April 2002
Q-Chem Petrochemical Complex
MesaieedIndustrial City, Doha, State of Qatar
SEMINARS AND TRAINING:
Special Seminars/ Training:
- ExxonMobil Live Plant Training 9 Sept 2011
- Shaw Brownfield Awareness Training Course 6 Sept 2011
- Shaw LOTO Training Course 6 Sept 2011
- Shaw JSA Workshop Training Course 24 Aug 2011
- Shaw Permit-to-Work Training Course 23 Aug 2011
- Shaw Working at Height Training Course 22 Aug 2011
- Shaw Confined Space Entry Training Course 22 Aug 2011
- Shaw SIC Training Course 22 Aug 2011
- Katoen Natie Singapore (KNS) Safety Induction Course (SN: 029/0211) 15 Feb 2011
ExxonMobil On-Site (EMOS) Terminal
Jurong Logistics Terminal (JLT)
Jurong Island, Singapore
- Oil/Petrochemical Industry Safety Course For Supervisors (27 To 29) Dec 2010
Accredited by MOM (AKC-10-81079)
Absolute Kinetics Consultancy Pte Ltd
64 Hillview Terrace
Singapore 669277
- Log Out Tag Out (LOTO) 20 Dec 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
Jurong Island, Singapore
- Supervisor SHE & Cultural Awareness Workshop 12 Nov 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
- Enhanced Safety Orientation Course Training (ESOC Training) 11 Nov 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
- Manual Handling for Supervisor 2 Nov 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
- Working at Height for Supervisor 1 Nov 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
- Pre-Task Talk 28 Oct 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
- Continuous Observation And Risk Evaluation (CORE) Training For Supervisor 27 Oct 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia Pte Ltd.
- Enhanced SHE Roles And Responsibilities For Supervisor 27 Oct 2010
(Accredited by MOM)
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia Pte Ltd.
Jurong Island, Singapore
- Power Group HSE Induction 18 Nov 2009
Qatar Aluminium Complex (Qatalum)
MesaieedIndustrial City, Doha, State of Qatar
- Skilled Person Training Course (Hazardous Energy Control System) 18 Nov 2009
QatarAluminium (Qatalum)
MesaieedIndustrial City, Doha, State of Qatar
- Timeless Keys to Work Success 21 May 2005
A career success and survival seminar
Globe Telecom, Aisatown, I.T. Cebu City, Philippines
- Permit to Work System Training Course 1 Sept 2001
Q-Chem Petrochemical Complex
MesaieedIndustrial City, Doha, State of Qatar
- Work Permit Receiver Training Course 20 Mar 1999
Onshore Gas Development
Habshan, Abu Dhabi, United Arab Emirates
- Saudi Aramco Loss Prevention Work Permit Receiver Training Course 25 Aug 1998
Jeddah Area Loss Prevention Division
Yanbu Loss Prevention Unit
Madinat, Yanbu, Kingdom of Saudi Arabia
- Computer Aided Design (AutoCAD) 5 Mar 2001
Technical Education & Skills Development Authority Region 7, Training Centre
Cebu City, Philippines
Continuous Professional Education Seminars/Training:
- Telecommunication Outside Plant Engineering 8 Aug 1999
IECEP-TESDA 7 Training Centre, Cebu City, Philippines
- Private Automatic Branch Exchange (PABX) Network Management 8 Sept 1996
IECEP-Sacred Heart Centre, Cebu City, Philippines
- Advanced Electro-Pneumatic Control 2 June 1996
IECEP-Sacred Heart Centre, Cebu City, Philippines
- Microwave Design and Multiplex Telephony 16 Dec 1995
CIT-Audio Video Room, Cebu City, Philippines
- Communications-Application to Power System Operation 3 Dec 1995
IECEP-Sacred Heart Centre, Cebu City, Philippines
- On The-Job Training (OJT) 3 Jan 1995
Philippine Global Communications, Inc. (PhilCom)
Cebu City, Philippines
- Engineering Broadcast and Acoustics 31 May 1995
Don Bosco Training Laboratories
Don Bosco Technical School
Cebu City, Philippines
- Update in Telecommunication Services 11 Mar 1995
CIT Multi-Purpose Room
Cebu City, Philippines
*** Other additional information will be provided, if required.
Now you can upload your resume directly to Monsterusing Word 2007!
- Install Monster’s Easy Submitadd-in by clicking the “Install” icon on the menu ribbon.
- Once installation is complete, restart Word.
- Click on the “Upload” icon to upload your resume to Monster.
For any issues or questions, please visit theEasy Submit installation support page.
To close this reminder, click the border and then press DELETE.
Roy B Lozano
Employment Pass (EP) Number: G5061281W, Passport Number: XX2628302
07-4347 Blk 803, Yishun Ring Road, Singapore nSingapore 760803
nHP: (+65) 83857325 Telephone (+65) 65260503 nEmail: [email protected]
Sitio Salvacion, Maguikay, Mandaue City, Cebu nPhilippines 6014
nHP:(+63) 9193943417 Tel/Fax: (+6332) 4227260 nEmail: [email protected]
Career Objective: To work in a professional way without hesitation and reservation! Given experience and aptitude, I will progress into senior level specialising in construction for Oil & Gas Industries.
Experience
Professional Qualification (1995 – 2011)
Significant experience in oil and gas for Electrical and Instrumentation scope of work; which includes shutdown works, expansion projects, modification, mechanical completion, pre-commissioning and commissioning activities, and project management.
Result-oriented. Speaks English and Filipino; conversant in Hindi and Arabic.
Shaw Stone & Webster Asia, Inc.
Gate #1, 100 Jurong Island Highway, Singapore 627867
Project: Singapore Parallel Train (SPT) Olefins Recovery & Utilities Project
ExxonMobil Chemical Asia Pacific Pte Ltd
Supervisor Instrument, August 2011 – Present
- Supervise and monitor daily construction activities.
- Assist the pre-commissioning department for day to day requisition on Instrument disconnection, removal and re-instatement.
- Clearing of punch list items on Loop Folders, and helping/assisting the Loop Check group to achieve its target loop checks per day.
- Signing of work permits, JSA, and material requisitions
- Participate on daily tool box meeting
ABB Pte Ltd
Singapore 139935
Project: Singapore Parallel Train (SPT) Project
ExxonMobil Chemical Asia Pacific Pte Ltd
New SPT Gate, 100 Jurong Island Highway, Singapore 627867
QA/QC Engineer/ Coordinator, Oct 2010 – June 2011
- Lead and maintain relevant documentations.
- Liaise to the client; attend daily meetings and interfaces with all associated departments for daily activities.
- Prepare, review and endorsement of test packs and dossiers.
- Clearing of punch list items both construction and engineering issues.
- Involved in the field inspection and verification.
- Loop Check Coordinator. Worked side-by-side with FWP (Main Contractor) Project Coordinator and overall Project Manager for fast tracking andprogress monitoring.
- Unit Shutdown Lead; involved in pneumatic/cable/tubing tie-end, and other related electrical and instrumentation activities.
- Other related activities, assisting in the preparation of daily work permits.
ABB Norway
Doha, State of Qatar
Project: Qatar Aluminum Smelter Plant (QATALUM)
Qatar Petroleum and Norks Hydro Joint Venture
Mesaieed Industrial City, State of Qatar
Interface Coordinator/ QA/QC Engineer, Oct 2009 - May 2010
- To report and work with project manager on a regular basis and more specifically when decisions with an impact on the strategy of the project are needed. Ensure the smooth progress and completion of the project within cost, time and quality standards.
- Responsible in making necessary arbitration between contractors in case of conflict such as potential problems, issues associated with late or missing information around interfaces, communication breakdowns, and to resolve while keeping all the parties informed. Ensure satisfactory close out and sign off all interface actions.
- Liaise with client and suppliers for quality issues, such as fabrication and installation activities. Provide input to weekly and monthly progress reports.
- Coordinated daily construction activities. Control daily activities of sub-contractors on schedule requirement and engineering interface.
- Performed routine quality control inspections, such as field installation activities. Respond to (RFI) request for inspection, witness modifications, control room panel lay out, cable installations and terminations, prior to hand-over to the client.
- Review and provide tested and accepted documentation required for project completion.
- Issued punch list for outstanding works and document result in accordance to approved Project Owner procedures and specifications.
- Other related activities, also involved in HSE matters and preparation of Work Permit System.
RYNZ MARKETING
(Contracting/Distributor/Trader)
Mandaue City, Philippines
Project: Entrepreneurships/Trading
Mandaue City, Philippines
Owner, June 2002 to PRESENT
- Implement and enforce all company policies, procedures and practices.
- Highly involved and consulted on various aspects on contracting and marketing activities.
- Establish and implement strategic preparation for business location.
- Owner/finance construction activities like telecommunication and electrical works. Work includes pulling cable, splicing and termination of copper and fiber optic cables; telephone system; electrical wiring and installation of panels and lighting fixtures.
Accomplishments:
- Apo– Cemex Plant Project
- Hilton Cebu Resort and Towers (Level 18 & 19) Project
- CoralPoint Group of Companies
- M. ZED School Project
- CenturyPlazaCommercial Complex Project
- Southern Leyte State College of Science and Technology (SLSCST) Project
- Gaisano Department Store Project
- PLDT Projects
- Globe Projects
- Globe-Islacom Projects
- MetroBank PlazaProject
- Cebu-MactanInternational AirportProject
- Municipal Hall Project
- Maria Luisa Subdivision Project
- Ceniza Petron Station Project
KELLOGG BROWN & ROOT INT’L INC. /TECHNIP PROJECT
Dodsal Pte. Ltd.
Doha, State of Qatar
Project: Qatar Petrochemical (Q-CHEM)
Mesaieed Industrial City, State of Qatar
Foreman Instrumentation, Aug. 2001 to June 2002
- Earned a reputation as a trusted staff: “Awarded/certified as QA/QC Instrumentation Inspector for acting as good counterpart by Kellogg Brown & Root Int’l Inc./Technip Project (KBRT)”
- Strict implementation of project quality plan in accordance to Standard and Specifications.
- Monitor construction activities. Witness, testing and inspection from installation to the field-testing activities as per standard requirements and specifications.
- Check and review all loop test packages as per stated attachments and requirements.
- Performed pre-commissioning and clearing the final punch list for mechanical completion.
Eupen Cable Asia, Inc.
Cordova, Cebu, Philippines
Project: Manufacturer of Fiber Optic Cables
Cordova, Cebu, Philippines
Quality Assurance Engineer, July 2000 to Aug 2001
- Lead, implement and maintain ISO 9002.
- Monitor and evaluates related standards at all stages of production, from raw fibers, process lines (colouring of fibers, tubes, stranding and sheathing), to Fiber Optic Cable (Final Product).
- Specified implementation of standards, methods and procedures for inspection to achieve product precision, accuracy and reliability.
- Monitors and implements corrective and preventive actions for continuous improvement and prevention of non-conformance.
TECHNIP/BECHTEL PROJECT
Consolidated Contractors International Company S.A.L.
P.O. Box 70193, Habshan, Abu Dhabi, United Arab Emirates
Project: Onshore Gas Development, Phase 2 (OGD 2)
Habshan, Abu Dhabi, United Arab Emirates
Chargehand Electrical & Instrumentation, Nov 1999 to June 2000
- Preparation, implementation and execution of all Instrumentation Scope of Work as per Standard and Specification.
- Pulling of cables to different environment such as underground, trench, ducting, cable tray, and conduit from different locations and destination.
- Cable gland and termination, installation of Field Instruments and Junction Boxes, and performed Bench and Field Calibration.
- Control Room Layout:
- Installation of Instrument Panels and Cabinets
- Cable Tray Layout
- Pulling Cable/ Cable Routing and re-routing
- Cable Gland and Termination
- Fabrication of supports for cable tray and conduit installation.
ISLA Communications Company, Inc.
Cebu City, Philippines
Project: Construction of Telecommunication Facilities
Cebu City, Philippines
Junior Engineer, June 1999 to Nov 1999
- Evaluation of abnormalities in site condition of cables that may result to sub-standard construction or abnormal function of the network.
- Evaluation and testing of fiber optic and copper cable. Conduct cutover & splicing, telephone installation, troubleshooting and repair.
- Perform fiber optic and copper cable acceptance and warranty testing.
Jamjoom – Wescon Saudi Arabia Co. Ltd
P.O. Box 2864, Jeddah, Kingdom of Saudi Arabia
Project: Construction and maintenance of oil fields
Kingdom of Saudi Arabia
Lead Electrical & Instrumentation, July 1997 to June 1999
- Preparation, implementation and execution of all instrumentation scope of works.
- Worked both construction and maintenance which includes shutdown works, modification, expansion, punch list clearing.
- Performed calibration and installation of process field instruments, impulse tubing, cable tray layout, conduit, fabrication of supports, loop checking and commissioning.
- Additional scope of work includes material take-off, and filing of daily Work Permits (having passed the written examination for Saudi Aramco’s Work Permit System).
Construction:
- Saudi Petrochemical Company (SADAF)
- Saudi – Yanbu Petrochemical Company (YANPET)
- Saudi – Aramco Mobil Oil Refinery Company Ltd. (SAMREF)
- Saudi – Aramco National Gas Line (NGL)
Maintenance:
- Petromin Lubricating Oil Refinery Co. 2 (LUBE – REF 2)
- Saudi – Aramco Jeddah Oil Refinery Co. (JORC)
- National Titanium Dioxide Company (CRISTAL)
Philippine Global Communications, Inc. (PhilCom)
Cebu City, Philippines
Project: Construction and maintenance of Telecommunication Services
Cebu City, Philippines
Junior Engineer, June 1995 to July 1997
- Preparation of necessary documents such as test results and other protocols. Supervise cutover and splicing activities perform by contractors.
- Clearing & rectification of deficiencies in conjunction with the outside plant activities.
- Conduct installation, troubleshooting and repair of telephone, fax & telex machines.
EDUCATION
8 December 1995 Professional Board
Professional Electronics and Communications Engineer
Philippine Regulation Commission (PRC)
Republic of the Philippines
27 May 1995 Graduated
Bachelor of Science in Electronics and Communications Engineering
Cebu Institute of Technology
Cebu City, Philippines
ORGANIZATION/AFFILIATION
Institute of Electronics and Communications Engineers of the Philippines (IECEP)
Republic of the Philippines
AWARDS
- Safety Awardee for the Month of May 2002
Q-Chem Petrochemical Complex
MesaieedIndustrial City, Doha, State of Qatar
- Safety Awardee for the Month of April 2002
Q-Chem Petrochemical Complex
MesaieedIndustrial City, Doha, State of Qatar
SEMINARS AND TRAINING:
Special Seminars/ Training:
- ExxonMobil Live Plant Training 9 Sept 2011
- Shaw Brownfield Awareness Training Course 6 Sept 2011
- Shaw LOTO Training Course 6 Sept 2011
- Shaw JSA Workshop Training Course 24 Aug 2011
- Shaw Permit-to-Work Training Course 23 Aug 2011
- Shaw Working at Height Training Course 22 Aug 2011
- Shaw Confined Space Entry Training Course 22 Aug 2011
- Shaw SIC Training Course 22 Aug 2011
- Katoen Natie Singapore (KNS) Safety Induction Course (SN: 029/0211) 15 Feb 2011
ExxonMobil On-Site (EMOS) Terminal
Jurong Logistics Terminal (JLT)
Jurong Island, Singapore
- Oil/Petrochemical Industry Safety Course For Supervisors (27 To 29) Dec 2010
Accredited by MOM (AKC-10-81079)
Absolute Kinetics Consultancy Pte Ltd
64 Hillview Terrace
Singapore 669277
- Log Out Tag Out (LOTO) 20 Dec 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
Jurong Island, Singapore
- Supervisor SHE & Cultural Awareness Workshop 12 Nov 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
- Enhanced Safety Orientation Course Training (ESOC Training) 11 Nov 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
- Manual Handling for Supervisor 2 Nov 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
- Working at Height for Supervisor 1 Nov 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
- Pre-Task Talk 28 Oct 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia PTE Ltd
- Continuous Observation And Risk Evaluation (CORE) Training For Supervisor 27 Oct 2010
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia Pte Ltd.
- Enhanced SHE Roles And Responsibilities For Supervisor 27 Oct 2010
(Accredited by MOM)
Foster Wheeler Worley Parsons (FWP) Joint Venture
ExxonMobil Chemical Asia Pte Ltd.
Jurong Island, Singapore
- Power Group HSE Induction 18 Nov 2009
Qatar Aluminium Complex (Qatalum)
MesaieedIndustrial City, Doha, State of Qatar
- Skilled Person Training Course (Hazardous Energy Control System) 18 Nov 2009
QatarAluminium (Qatalum)
MesaieedIndustrial City, Doha, State of Qatar
- Timeless Keys to Work Success 21 May 2005
A career success and survival seminar
Globe Telecom, Aisatown, I.T. Cebu City, Philippines
- Permit to Work System Training Course 1 Sept 2001
Q-Chem Petrochemical Complex
MesaieedIndustrial City, Doha, State of Qatar
- Work Permit Receiver Training Course 20 Mar 1999
Onshore Gas Development
Habshan, Abu Dhabi, United Arab Emirates
- Saudi Aramco Loss Prevention Work Permit Receiver Training Course 25 Aug 1998
Jeddah Area Loss Prevention Division
Yanbu Loss Prevention Unit
Madinat, Yanbu, Kingdom of Saudi Arabia
- Computer Aided Design (AutoCAD) 5 Mar 2001
Technical Education & Skills Development Authority Region 7, Training Centre
Cebu City, Philippines
Continuous Professional Education Seminars/Training:
- Telecommunication Outside Plant Engineering 8 Aug 1999
IECEP-TESDA 7 Training Centre, Cebu City, Philippines
- Private Automatic Branch Exchange (PABX) Network Management 8 Sept 1996
IECEP-Sacred Heart Centre, Cebu City, Philippines
- Advanced Electro-Pneumatic Control 2 June 1996
IECEP-Sacred Heart Centre, Cebu City, Philippines
- Microwave Design and Multiplex Telephony 16 Dec 1995
CIT-Audio Video Room, Cebu City, Philippines
- Communications-Application to Power System Operation 3 Dec 1995
IECEP-Sacred Heart Centre, Cebu City, Philippines
- On The-Job Training (OJT) 3 Jan 1995
Philippine Global Communications, Inc. (PhilCom)
Cebu City, Philippines
- Engineering Broadcast and Acoustics 31 May 1995
Don Bosco Training Laboratories
Don Bosco Technical School
Cebu City, Philippines
- Update in Telecommunication Services 11 Mar 1995
CIT Multi-Purpose Room
Cebu City, Philippines
*** Other additional information will be provided, if required.