Summary of Experience:

Project Planning in Building Construction, Civil Works, Marine Civil Works, and Infrastructures eg, Tunneling and Railways.

 

Work Experience:

Jumana Island – Dubai, UAE

Van Oord Middle East, Dubai, U.A.E.

July 2013 – Sept 2013

Construction works consist of dredging and reclamation of temporary causeway as a link with the mainland. Main works consist of dredging, land reclamation, shore protection works and ground improvement works for the island, removal of underwater reef and construction of abortive containment bund.

Plannning Engineer

Develop a construction programme showing optimal sequence of operations on the construction site. Responsible for ensuring that construction projects are completed within set deadlines, on budget, and in line with all the relevant safety standards and regulations. Coordinating activities in a structured manner for a productive outcome.

 

Upper Zakum Artificial Islands

National Marine Dredging Company

Musafah, Abu Dhabi, U.A.E.

May 2010 – Jan 2011

Construction of Four Industrial Islands for the development of Petroleum Operation.

Snr. Project Planner

Provide schedule analysis to include float analysis/slack and critical path status at the summary level (Gantt charts, Milestone/Events, Master Phasing Schedule) in addition to detailed task level. Directly responsible for 'hands-on' scheduling support to control account managers by developing new schedules for work in planning stages, updating schedules as revisions occur, and updating status all schedules on a weekly basis.

 

Khalifa Port and Industrial Zone Project

Boskalis Westminster Middle East

Planning Engineer

Provide schedule analysis to include float analysis/slack and critical path status at the summary level (Gantt charts, Milestone/Events, Master Phasing Schedule) in addition to detailed task level. Directly responsible for 'hands-on' scheduling support to control account managers by developing new schedules for work in planning stages, updating schedules as revisions occur, and updating status all schedules on a weekly basis.

 

Al Taweela, Abu Dhabi, U.A.E.

Dec 2009 – Feb 2010

Planning Engineer

Provide schedule analysis to include float analysis/slack and critical path status at the summary level (Gantt charts, Milestone/Events, Master Phasing Schedule) in addition to detailed task level. Directly responsible for 'hands-on' scheduling support to control account managers by developing new schedules for work in planning stages, updating schedules as revisions occur, and updating status all schedules on a weekly basis

 

Dredging International South Africa

DurbanHarbourWidening and Deepening Project,

Durban, South Africa Aug 2008 - Jul 2009

Planning Engineer

 

Jan De Nul Dredging - Boskalis Westminster Middle East

Dredging, Land Reclamation and Construction of Breakwater for Ras Laffan Port Expansion Project

01 June 2006 – 31 May 2008

Plannning Engineer

Responsibilities: Project planning and programming and provided direct scheduling support for project managers and operation managers: Develop detailed construction programme, interdependency and network schedules. Facilitate and assist programs in establishing schedule by defining the tasks, establishing logical relationships, estimating appropriate duration, identifying necessary constraints, assigning appropriate resources, and analyzing the schedule.

 

Boskalis Westminster - Archirodon

Artificial Island , North Caspian Sea Project

Republicof Kazakhstan

Feb 2005 – Dec 2006

Planning Engineer

Project: Construction of US$ 80M Artificial Island and underwater Berm at North Caspian Sea Project Kazakhstan ROK.

Responsibilities: Project planning and programming and provide direct scheduling support to construction projects to include: Baseline Programme, master schedules, detail schedules, interdependency and network schedules. Facilitate and assist programs in establishing schedule by defining the tasks, establishing logical relationships, estimating appropriate duration, identifying necessary constraints, assigning appropriate resources, and analyzing the schedule.

 

Artlink Design Associates Ltd.

2004 – 2005

Project Manager / Designer

 

Goudie Associates Ltd.

Jan 2003 – Oct 2003

Project Supervisor / Designer

 

Prudential Surveyors Ltd.

July 2002 – Jan 2003

Cad Supervisior

 

AIM Group Limited (Hong Kong)

Sept 1999 – July 2002

 

Projects:

KCRC East Rail Extension - Necso-China State-Hip Hing Joint Venture.

 

Responsible for the submission of the revised Master Works programme TCC200/300 and Detail Construction programme for all Stations and Viaduct construction from Tai Wai to Lee On. Prepared the initial programme for Piling and Structural, mechanical, electrical and ABWF works utilizing Primavera Project Planner

 

China Light & Power/ Yau Nam Kee Contractors

Responsible for the preparation of the Initial Submission programme for the Power Cable circuit Installation from Tai Wan to Tseung Kwan O.

 

Contract DC/96/17 Strategic Sewage Disposal Scheme Paul Y. - Seli(JV) Completion works for Transfer SystemResponsible for the preparation of Detailed Construction Programme which included programme works for Tunnel Shafts at Chai Wan Kwun Tong, Tseung Kwan O, Shau Kei Wan, and Shau Kei Wan Diversion Chamber and 5 nos. sections of Surface works which included steel pipework, civil works, E&M and general landscaping.

Assisted in the preparation of a works method statement for each shaft / surface works area detailing the logic, sequence and resources required for the monitoring and production of ‘S’ curve schedules.

 

 

MTRC 602 Tiu Keng Leng Station, N.T. Hong KongPaul Y. -CRECJoint Venture

Project Planner - Responsible for the initial submission of detailed construction programme for Grid Line 7-2, TKL Station terminal. Preparation of alternative construction programmme as part of the Delay Recovery Measures.

 

Planning and Programming for KCRC (Kowloon Canton Railway Corporation) West Rail Extension for ChunWo-Fujita-Henry Vicy. Responsible for the monthly update and submission of Construction programme and preparation of monthly progress evaluation report for civil works, infrastructure, and ABWF installation works.

 

 

 

COMPUTER SKILLS

 

Primavera ver. 8.2

Microsoft Project

MS Excel, MS Word

AutoCAD

Microsoft FrontPage

Illustrator

Corel Draw

MS Power Point

PageMaker, Photoshop 6.0, 7.0

Sketchup 8.1

 

LANGUAGE             

 

Spoken English – fluent            

Written English - fluent

Cantonese – 30%

           

EDUCATION                       

 

Year:                            1990

Qualification:               University

School:                       Central University of the Philippines

Discipline:                     Civil Engineering / Architecture

 