Planning engineer, SILEC CABLE, Cable Installation Works

B
Bert Ella 👤 Member for 15 years 3 months
START Date

 

PLANNING ENGINEER (Main Contractor) October 2010 to Present

SILEC CABLE: a General Cable Company

P.O. Box 112478, Abu Dhabi, UAE

Job Description:

 Reports to the Project Manager

 Ensure the Planning and Updating Schedules

 Prepares Baseline Programs using

 

Primavera P6 v6.2 – 7.0 as per ADWEA-TRANSCO’s Requirement

 Generates Cash Flow, S-curves and Manpower Histogram.

 Prepares weekly and monthly reports, and analyzing the delays of the Project.

 Presenting schedules of work, often with visual aids such as bar charts and procedures diagrams

 Monitoring progress throughout the construction process and comparing this with the projected schedule of work.

 Selecting the appropriate techniques and sequence of events for a particular project

 Support delivery of project to cost, time and quality

 

Project Handling : ADWEA-TRANSCO PROJECTS; N7022 (132kV Cable Installations 5 Circuits), N7015 (220kV Cable Installations 1 Circuit-9300 m), N7027 (220kV Cable Installations 3 Circuits), N6485.1 (132kV Cable Installations 5 Circuits)