Ali Elhendawi resume

ALI ELHENDAWI

PMP, BSc. C.Eng.MASCE,MICE IEng,6 Sigma

USA -1122 Whisper Trace, Sugar land 77479: [email protected]

Tel: 18329038873

 

Project Control Manager - Scheduling/ Planning Manager/Claim Expert

PMP Instructor –P6 Trainer

 

SUMMARY OF EXPERIENCE

 

Around 20 years’ of experience with several leading International Consulting, PMC and Contracting firms in Project Management include Project control of medium/large projects ,Scheduling, and Planning and site works,  (Qatar ,Oman, UAE, Egypt , Morocco, Equatorial Guinea ,USA ) for value of more than 50bn $ .

 

 

Extensive knowledge of planning, scheduling using P6,,Claim analysis, Time Impact analysis, Ms Project , and added value for the project execution methodology review, cost estimation, resolving claims, and disputes.

 

Added value to the company reporting system by Providing  information and decide on all issues concerning the issuance of the Baseline schedule such as WBS, activity codes, logical sequence, critical path method scheduling techniques, estimating, project cost management, forecasting and document control for multiple projects.

Ensure accurate Earned Value Management system reporting EVM, and accurate cost management and forecast reporting

 

Prepare Projects master plans, portfolio module, WBS, EVM, Codes, and Baseline. Measure actual progress verses the approved baseline. Production of KPI’s and Strategic planning/KPI’s, Dashboards, and keeping close eye on the Company objectives /Cost/Budget/risk.

Lead and manage the project controls team, Site work follow up, develop the project controls execution strategy, prepare presentations to senior management, and responsible for Hands on works to the clients.

 

Well versed in all pre- and post-contracts quantity surveying activities, including the review of Contractors' payment certificates.

Maintained good relationships with clients ,supplier ,subcontractors and act as focal point of contact.

 

Well versed in all pre- and post-contracts quantity surveying activities, including the review of Contractors' payment certificates and claims, preparation of technical reports on quantities and works progress.

 

Perform Extension of time analysis & reports and preparation of the Project control Procedures

 

Identify delays, risk analysis with PertMaster, critical paths CPM, areas of concerns and provide corrective and Preventive actions to achieve Contract milestone dates.

 

 

PROJECT TYPES

 

Railways ,Highways, Infrastructures

Airports, Tunnels, Marine development

Mixed use Development, Substation, Electrical

Marine Platforms & Pipelines

 

 

ACTIVITIES

Engineering and Construction

Project Scheduling, Shutdown Scheduling

WBS, EVM, Cost Control

Baseline Analysis, Bids and Proposals

Production of KPI’s Dashboards, Reporting, Claim Administration

Risk analysis using PMI methodology

 

                                         

 

PERSONAL QUALIFCATIONS

BSc. C.Eng,PMP, MASCE

MICE IEng, 6 Sigma,

Fluent in English,

Average French – Little Spanish

 

 

SYSTEM/COMPUTER SKILLS                                       f                                                                      

P6,Pertmaster, Claim Digger, Schedule Analyzer

Proliance. Contract Management.

AutoCAD, Microsoft Office

 

 

 

EMPLOYMENT HISTORY

 

                                    KBR                                                   2014 – June 2016

                                    QPM                                                   2012 - 2014

                                    Dar Al Handash.                               2009 - 2012

                                    WS ATKINS OVERSEAS              2008–2009

                                    ARAB CONTRACTORS                     1996-   2008

 

KBR - March 2014 – June 2016 ,Houston USA

Lead Specialist, Scheduling/ Planning Manager BP Husky

Programme Planning Manager for Q2022 Expressway infrastructures

 

BP Husky Toledo refinery Plant (TFOA-Building ,Infra,  Pipeline ,steel structures and Equipment)  ,Full project control and scheduling ,maintaining Baselines  measuring variances ,Producing KPI’s, Procurement (follow up with vendors ,review their schedules ), ,preparing reports ,Generating S curves ,Coordination ,and Client Presentation.

 

Q2022 Expressway infrastructuresProgramme .Doha, Qatar; the biggest Governmental infrastructures, Highways and bridges Programme for Q2022, with value of more than 30 bn. USD. The programme includes 900km of world-class expressways including highways, interchanges, truck routes, underpasses, flyovers, and a full range landscape. The programme also includes a major scope of infrastructure including TSE pipelines, storm water pipelines, street lighting, MV/HV power lines, power substations, ITS, and sign gantries.

 

Managed  complex EPC Programme from inception to completion, interfaced with key stakeholder, resolved 13 Projects Baseline issue, and implemented project control system for corporate  schedules updates.

Created master schedules of 10000 tasks to summarize programme status, EVM ( CPI and SPI), SV,CV, CPM, S Curves , and Cost Control 

Achieved 21 projects on beneficial use (opened for traffic on time) and 6 projects on design stage.

Prepared guidelines and manuals for extension of time analysis (TIA) which resolved more 20 pending claims  

Updated the Project Control Processes & Procedures, Master Scheduling to match client objectives and successfully approved by the client (ASHGHAL)

Prepared MPR , creative dashboards and fin tuned the monthly analysis and presentation for biweekly client meetings

Prepared risk analysis (Monte Carlo analysis) in PertMaster, this gives the realistic completion, dates for the projects. Developed and maintained effective relationships with existing, customers and contractors which resolved many claims ,issues ,Payment and saved around 20 Million $ for the 21 ongoing projects.

 

QPM   2012 – 2014- Tangier, Morocco

Planning &Control Manager          

 

·         Overall Project Control Processes & Procedures, Master Scheduling, Planning, Cost Control, Claims analysis, progress measurement Reports, change management, design follow up, and documentation system control (Proliance system –Share Point –P6, Spread Sheets, and Primavera Contract Management).

·         Finalized 3 extensions of time analysis which lead to realistic and approved target, setup  progress measurement system, and change management, 

·         Prepared Master schedule 8000 Tasks

·         Reviewed and approved all the planning documents, deliverables, i.e. (Baseline, Bar chart, CPM, Logic Relations, resources and production rates) submitted by the contractor within the time stipulated in FIDIC contract.(Red Book)

·         Maintained projects Baselines, record progress, cost and measured any deviation versus the approve Baseline.

·         Attended client meeting and prepared and lead the client presentations

·         Prepared Project Control Processes, Procedures, WBS summary and detailed, Dashboards, MPR, look ahead).

Al Houara Coastal Resort With approximately270,000 M2 of total built area (2 bn. $), the development is a mixed-used golf and beach resort, including a 300 key Hotel and a 150 key Hotel, Serviced Apartments, Beach Villas, Beach Apartments, Beach Club house, a PGA 18 hole Golf Course, Country Club, Golf View Villas and Apartments, Retail, a Resort Spa and various water sport and family amenities

 

Dar Al Handash.2009 – 2012 ,Jeddah ,Saudí Arabia

Project Controls Manager

 

Reviewed and approved all the planning documents, submitted by the Contractors i.e. (Bar chart, CPM, Logic Relations, resources and production rates)

Prepared progress reports to the related authorities: PM/Saudi Railways organization/Ministry of transportation, High level summary and status Reports.

Maintain projects Baseline, record progress, cost and keeping a close eye on possible problems before they become critical

Identified delays, Critical Paths and areas of concern and provide corrective actions to achieve contract Milestones.

Provided information and decide on all issues concerning the issuance of the Baseline schedule.

Monitored contractor’s progress versus the approved Baseline

Reviewed all correspondence of the Contractors to ensure its compliance with Contract Conditions

Monitored project cost and follow up any deviation

Participated in reviewing and approving Contractors Method Statements.

 

Project:

HARAMAIN HIGH SPEED RAIL; with a value around (4) bn.$ Phase - 1 relates to the construction of Route Civil Works( Rail works, Road works, Interchanges, Bridges, Camel crossings...) and Stations (3) bn.$ (. Phase - 2 includes the entire superstructure works (i.e. Track, Signaling, Telecommunication, Power Supply, Catenaries, Rolling Stock and Operations & Maintenance Contract.)with a value around 8.2 Bn $

 

WS ATKINS OVERSEAS  2008–2009, Sharjah ,UAE

Senior Planner-Sr. Highway Engineer

 

Reviewed Schedule of work, and measuring Project Performance against Baseline Schedule.

Produced-curves (Cost –Manpower Histogram –Equipment Histogram)

Measured variances and recommend corrective action.

Managed and maintained all administration procedures including RFI's, RFA's other relevant documents, planning, managing and controlling the projects

Interface with the Client, Contractors, Authorities and other Consultants.

Reviewed and evaluate technical submittals and shop drawings

Monitored QA/QC site procedures

Ensured the quality of design works are undertaken in accordance with relevant standards and codes of practices

Projects:

EDUCATION CITY DOHA: Prestigious project in Qatar with around 800 Hectares of urban development, infrastructure works –highways –tunnels

New Doha International Airport: This is a design and build contract. the works consist of 3 major interchanges leading to New Doha International Airport, link roads, perimeter roads, site roads, internal roads, parking, perimeter security fence, drainage, utility corridors and bridge design works for 19 Bridges. The contract value was £110 million, which has been extended to include Phase II Construction to an increased value of works to be approximately £170 million.

Durrat Al Bahrain resort: Prestigious resort on the south of Manama (capital of Bahrain), includes infrastructures, networks, building, villas, and hotels

 

ARAB CONTRACTORS    1996-   2008 ,Egypt ,Oman ,Equatorial Guinea

Technical Manager /Head of Planning

 

Technical office works; Preparing schedules, follow up projects progress, and measure key performances indexes, Produce S-curves; Cost, Equipment, Manpower Histograms.

Company representative for International deals, visits and liaison with the relevant authorities.

Prepared tenders documents, Procurement of materials, and supplier negotiation.

Measured variances and recommend corrective action.

Prepared Contractors invoices- Client liaison, prepare minutes of meetings and workshops.

Plan; manage resources, client requirements, projects follow up

Follow up Quality control procedure, and ensure that work executed as per quality procedure

Projects:

Upgrading Cairo / Alexandria / Matrouh Desert Road    value of 4 bn. million US Dollars      

ALkal Al Doqm Road 200 km-(Bs. Standards);              value of 15 million US Dollars.

Sohar port-                                                                        value 220 million US Dollars

Ela Nguma –cope) Road; around                                                 value of 67 million US Dollars

Pico Road 30 km : around                                                value of 45 million US Dollars

Malabo Road Networks: around                                      value of 30 million US Dollars.

Rehabilitation of Ministry of foreign affairs: around       value of 12 million US Dollars.

Malabo General  hospital : around                                    value of 50 million US Dollars

Mongomo airport tendering and Technical work study

Road projects in Hurghada up to (1000km) :                   value of 45 million US Dollars.

Abu soma Touristic village Roads Network: around        value of 6 million US Dollars

Safaga Road Network :                                                    value of 8 million US Dollars

Hurghada Airport renovation work                                  Value 500 million US Dollars

 

ACADEMIC QUALIFICATIONS

 

BSc Civil Engineering 1995 -Primavera Enterprise P6, and P3. Oracle University certified in Contract Management

Certificate in  (ISO 9001- ISO 14001- OHSAS 18001) - Quality, HSE & PMP 128904

Certified Internal Auditor (Business Management system)  

MEMBERSHIP OF PROFESSIONAL ORGANIZATION

MASCE, PMP ,AAHSTO Member – MICE,6 Sigma

     

International standards

Expert in FIDIC–Familiar with international Codes (DMRB- Egyptian Code-AASHTO-Qatar, Dubai, Oman, and Saudi Arabia codes)- MCHW- British Standards- QCS2007- QHDM – Qatar traffic Manuals- QSE  -ACI – ASTM.

Driving License                    

USA- UAE -KSA -Qatar-Oman – Egypt –Guinea-Morocco

 

References

Mr. Andi Harrah   - Company KBR USA ,Houston                           : andi.harrah @kbr.com

Mr. David Orelly  Programme director  - Company KBR Doha         : David.o'reilly @kbr.com

Mr. Richard Leech Programme Control Manager -                               Company KBR Doha         

Ian Kasher - Operation Manager - Alfasy Group                                 i[email protected]

Kevin Gadesby - Programme Director -MAG                                    :[email protected]