PLANNER / SCHEDULER & COST ENG.
Corrado
SURNAME: AUSTENI
NATIONALITY: Italian
EDUCATION: • Technical Mechanical Diploma
• Diploma in Project Management, Honeywell - Milan, Italy, 1987
• Project Management Institute (PMI)
LANGUAGES: Italian (native) English and French (fluent), Russian (basic)
COMPUTER SKILLS: MS Office, MS Windows, Primavera (P6), Artemis7000, Internet Applications
NOTICE PERIOD: 1 weeks
Oil & Gas
FEED & EPC experiences
- New and Revamping of LNG plants and BOP (with special attention for Piping fabrication and erection).
- New Oil Refinery and BOP (with special attention to Piping and Mech. activities).
- Pipelines and Pump Stations.
- Oil Drilling Platform “Fabrication & Hook-Up”.
- Petrochemical Plant and BOP Piping & Support Fabrication of Piping.
- Sphere & Tank construction.
- Oil Refinery Planned Ordinary Maintenance and Extraordinary Intervention of Maintenances.
Energy
- Nuclear Fusion ITER Project (Jig Vacuum Vessel fabrication)
- Nuclear Power Station construction
- Concentrate Solar Steam Power Plants Piping Shop fabrication and Site erection
- New Oil/Gas and Coal fired Boiler Power Station and related BOP (with Organization by Systems of Piping, Equipment, I&C, Electrical)
- Rehabilitation of Old Power Station
- New CCGT and related BOP (with Organization by Systems of Piping, Equipment, I&C), construction
Pharmaceutical Plant (Planning for Procurement, Shop Fabrication and Site Installation)
- Fabrication and Installation of Piping by System, Area, Zone
- Equipment as Heat Exchangers with Heads and Coils in Titanium
- Reactors with internal Mixer shaft and Blades
- Filters and Bed plus Filtration piping/filters/pumps/tanks/sewers system
- Drums in Stainless Steel for International and in particular Swiss clients
- Laboratory internal firefighting with gas and deluge
- Equipment Fabrication Work Shop Manager, Oil & Gas, Pharmaceutical and Petrochemical Sectors
- Appliance Plant (as Refrigerator Plant)
- Sea Water Desalination Plants plus Re-carbonation of water
- Forensic Planner Delay Analysis of Scheduling, Resources & Cost