Project Summary from Aug 2001 till Date
- Project Planner i/c of OML124 Izombe flare Down Gas Project Executed for Addax Petroleum Corporations Ltd by Hanover Nig Ltd. Scope of works included Engineering, Fabrication, Installation, Start –up and Commissioning of, pipelines, Gas lift equipment, E&I control systems, 2nos HP compressors installed to achieve Gas Re-injection and 6nos LP compressors installed to achieve Gas lift. Project which was worth $44Million was commenced by 26th May 2008 and was commissioned 25th July, 2009.
- Project/Costing Engineer i/c of Shell Gbaran Ubie EPF, aNigerian foremost gas project with a capacity to supply 1 Billion standard cubic feet of gas and 70,000 barrels of oil per day, being executed by Exterran Energy Services Ltd. Project scope include Engineering, Fabrication, Installation, Start –up and Commissioning of,23nos skidded Mechanical Gas equipment items and their piping connection networksplus E&I control systems, & associated Civil infrastructure. Joined Project worth over $50 Million USD by Jun,2009. Project which is currently ongoing is at 99% completion.
- Project Control Manager i/c of V-Monitor / EGP3B Offshore Tie-in & Brown field Modifications. Projects executed within the period July 2005- Nov 2008 while working for Titan Energy Nig Ltd included (i) Revamp Conceptual Engineering & FEED at Funiwa and North Apoi Platforms (ii) Installation Plans for Chevron Brown Field EGP3B Offshore Tie-in and Platform modifications Project. (iii) SPDC Vmonitor & Remote Sensor Project.
- Project Control/ Quality Engineer i/c of Okan Upgrade & other Projects executed for Chevron, Addax, Shell & NNPC for the period 1988 to Jun 2005.