Name: Alex Fraser
Address 29 Allandale Tee
New Maske
Cleveland
TS10 8HN
Telephone: 01642 473178
E-Mail: [email protected]
DOB: 29th December 1957
Professional/Institutes: Associate Member of the Chartered
Institute of Building 1995
Member of the Project Management Institute 1997
Qualifications: Vocational Certificate in Construction 1980
City & Guilds Advanced Craft Certificate 1978
City & Guilds Craft Certificate 1976
Training: Open University Short Course in Effective Management 1995 Ref. Number P2264227/C/95
Computer Training: Primavera P3 & P6, Sure Track, Artemis 6000, Open Plan, and MS Project. Pert-master Version 8.5
General Experience: Thirty years in the Oil and Gas industry, mostly on the heavy Engineering and Construction of Terminals, Topsides, Jackets and Rig Upgrades.
Aug 2010 – Present INPEX - Onshore Terminal (Fabrication Yard)
Senior Planning Engineer
Senior Planning Engineer for the construction of an onshore terminal for Darwin Australia. Working in the design office in Yokohama and reviewing bid documents and engineering progress, shortly to be seconded to the STP&I yard in Thailand. The work is coordinating the planning and control with several Contractors. Procurement and Design teams and hook up contractor. Duties include planning interfaces at all site, overall project planning, interfacing with planning teams at each location and the overall planning execution
July 2009 – Aug 2010 British Gas – Tunisia Pipelines
Senior Planning Engineer
Senior Planning Engineer for the construction of the Hasdrubal to Gabes pipeline and associated block valve stations, duties included monitoring Contractors programs and Progress, updating of level 3 schedule, coordinating between Engineering, Procurement and the contractor on drawing and material priorities. Carrying out risk assessments on the overall project. Agreeing monthly invoices based on physical progress.
Aug 2007 – June 2009 Woodside PBL (Thailand) – Onshore Terminal
Senior Planning Engineer
Pluto Project Onshore Terminal Construction Thailand. Two Hundred and sixty one modules to Construct and ship To Karratha Australia. 30,000(t) of steelwork, 49 Pre-assembled Units (process) up to 1,800(t) and 138 Pre-assembled Racks with 74 pre-assembled steel supports. Responsible for the overall planning and reporting to project group based in Perth. Responsibilities of overseeing the contractors planning and control system, assisting the contractor in the initial days of setting up a reporting system, prioritising PAU’S / PAR’s to be fabricated to meet the needs of the erection Sequence in Karratha, reviewing the shipping schedule on a fortnightly bases with the contractors personnel, and agreeing quantities fabricated for progress payments, producing weekly and monthly reports, and involved in the Risk Analysis of the project.
Sep 2001 – July 2007 BP (Azerbaijan) – STEP Onshore Oil & Gas Terminal
Senior Planning Engineer
Responsible to the Project director for all planning works on the onshore terminal, Phases 1, 2, & 3 ACG oil plants including , Shah Deniz Gas onshore Plant, BTC head pumping Station, Azpetrol pipelines, Tank farm, pipelines Duties: Included the following
· Setting up a planning Reporting System and planning team
· All aspects of planning to deliver the projects on time from FEED to Handover
· Interfaces with Materials, Engineering, Construction, Commissioning and operations.
Jan 1999- Aug 2001 Rashid Petroleum Company (Egypt) Onshore Terminal
Senior Planning Engineer
Responsible for the cost and planning of a new onshore gas terminal in Alexandria, Egypt. A joint Venture between Shell / Edison / BG Egypt. Heading up a team of four personnel, which contained both ex-pat and local staff. Planning works include Design Engineering, Procurement, Civils, Mechanical, Electrical, Instrumentation, Pre-commissioning and Commissioning. D
July 97- Jan 1999 BP Shah Deniz Shelf 5 Rig Upgrade (Azerbaijan)
Cost and Planning Manager
Responsible for the cost and planning of the Shelf 5 Rig upgrade in Baku, Azerbaijan. Heading up a team of nine personnel, which contained both ex-pat and local staff, with several sub-contractors and vendors. Works included building a new fabrication facility at the same time as setting up monitoring systems and upgrading a Drilling Rig.
Duties included:
* Designing a monitoring and progress System on P3
* Validation of Contractors plans and progress against Quantities
* Cost monitoring and Agreeing Quantities fabricated and erected
* Agreeing progress payments and contract quantities
Sept 96 - July 1997 Meissner & Wurst (Singapore / Malaysia)
Senior Planning Engineer / Project Manager
Contractors Senior Planning Engineer for the Planning Construction of the IBM Clean room class one hundred in Singapore. Promoted to Project Manager prior to the completion of the project, latterly responsible for the day-to-day running of the project and control of eleven discipline Engineers, Construction Managers and Supervisors.
Responsibilities Included:
* Site Management
* Site Safety and Welfare
* Completion of the Works
* Hand over and Site Completion to IBM
* Closeout documentation
* Final Accounts
* Commercial Claims
* Cost, Quantity Surverying and Planning - Primavera P3, MS Project
June 95- Sept 1996 British Gas Exploration & Production
Senior Planning Engineer
Client's Senior Contracts and Planning Engineer and Deputy Site Manager for the construction of the 8000(t) Armada Jacket at Ardersier. Duties included:
* Tender Evaluation
* Validation of Contractors plans and progress and project quantities
* Control of variation proposals and variation orders
* Agreeing variations
* Critical path and risk analysis
* Coordinating client supplied materials
Oct 93- May 1995 Shell - Pelican RM4E Process Module
Senior Cost & Planning Engineer and Quantity Surveying .
Clients Senior Cost, Quantity and Planning Engineer and acting Deputy Site Manager for the Engineering, Procurement and construction of the RM4E Process
Sept 91 - Oct 1993 British Gas Exploration & Production Onshore Terminal
Senior Planning Engineer
Clients Senior Planning Engineer for the planning of the Mechanical North area and Electrical works on the North Morecambe Onshore Gas Terminal at Barrow-in-Furness. Previously resposible for the planning of the P.A.R.'s at Ponticelli in France and the planning of the North Morecambe Jacket at Middlesborough. Duties as above
Dec 89 - Sep 1991 Mobil North Sea (Beryl Alpha Refurbishment)
Senior Planning Engineer
Based onshore and working within the platform task force group. Reporting directly to the construction manager for the refurbishment of the Beryl Alpha Platform.
Sep 81- Oct 1989 McDermott Ardersier Scotland
Junior Planning Engineer - Planning Engineer
Contractors Planning Engineer responsible for producing the contract Master Schedules, Estimating Quantities for Progress , weekly & monthly reporting, monitoring progress, costs, Quantity updating as drawings where issued etc.
Contracts during this period.
* DP6 & DP8 EPIC Contract joint Venture with AMEC & MH Design 1987 - 89
* Conoco S.B.G.D. Jackets Phase II (4 Number), 1987
* Conoco S.B.G.D. Jackets Phase I , 1986
* Marathon Brae 'B' Jacket, 1985
* Marathon Modules 06 and 01, 1985
* Conoco NW Hutton TLP 1983 1985
* British Gas / Marathon Modules 1