JOSE MARIE ARCE resume

JOSEMARIE ARCE

B-1, L-27, Il Giardino Residence

Buenavista-1, General Trias, Cavite 4114, Philippines

Philippines Home Telephone    : +63-46–8504170

QatarMobile Phone                 : +974-55837538; +974-66804863

Email                                    : [email protected]

Qualifications:

  • Diploma in Marine Engineering dated March 1979. Specialization in Planning, Forecasting, Scheduling and Progressing Technique by US Naval Sea System Command Management Office, Western Pacific Fleet, Pearl Harbour Hawaii.
  • At present work as Senior Planning Engineer (EPIC) for DOPET Construction Co. Ltd., Doha, Qatar commencing from 16 July 2007 to present.
  • Seven (7) months, working experience as Planning Engineer in Shell Philippines Malampaya Gas and Oil exploration Project (SPEX) commencing from July 24, 2006 to February 28, 2007. 
  • Two (2) years working experience as Maintenance Planning Engineer Supervisor in MARAFIQ Company for JUBAIL Sea Water Cooling System, Desalination Plant, Waste Water Treatment and Industrial Treatment Plant.
  • Having a combine of seventeen (17) years intensive experience as Maintenance Planner and Scheduler in Saudi ARAMCO Ship Repair and Dry-docking Yard, Ras Tanura, KSA., and also in  Philippine Naval Ship Repair Yard.
  • Two and half (2-1/2) years related working experience as site construction Planner and Scheduler for mechanical and electrical in the construction of New Hong Kong Airport at Chek Lap Kok, Hong Kong, China.   
  • Combine of two (2) years working experience as Mechanical Foreman in the erection of four (4) Thomassen  Gas Turbines in Asab and Habshan, GASCO and eight (8) MARUBINI Gas Turbines for Water and Energy Department (WED). And also work for ADMA/OPCO in the modernization DAS Island Gas and Oil Refinery Control System, all in Abu Dhabi, UAE.    

 

Total experience :

  • 29 Years in Project Controls, Planning & Budget/Cost. Tenders/Contracts, Engineering, Procurement, Fabrication, Construction, Commissioning.

Special Skills:

  • Proficient MS Project, Primavera P3, P3e, Primvera Enterprise, P6, MS Access, MS Excel, Power Point, MS Word, MARAFIQ and ARAMCO SAP R3  4.6 PM Module User; and Shell SAP Blueprint User. 
  • Can read and interpret engineering plans like construction plans, electrical plans, piping and instrument diagrams, piping isometric and structural drawings. 

EXPERIENCE AND RESPONSIBILITY

 COMPANY                             :     DOPET CONSTRUCTION CO. LTD.

                                                         P.O. Box 1744 - Doha, Qatar

 

      Year of Employment              :     July 16, 2007 to Present

      Position                                 :     SENIOR PLANNING ENGINEER

      Project Title                            :  1.   QP GTC115ED EPIC OF LPG BOTTLING PLANT

                                                      2.   QP GC07101900 CRUDE OIL IMPORT/EXPORT FACILITIES UPGRADE

                                                      3.   QP INSTRUMENT AIR COMPRESSOR WITH AIR DRYER

                                                      4.   ORYX-GTL EN-1182 PIC OF AIR PUMP

                                                      5.    ORYX-GTL 05-82-10 ATR BURNER MODIFICATION

                                                            (PLANT SHUTDOWN)

                                                      6.   ORYX-GTL EN-1209 EPIC OF SHUTOFF VALVES

                                                             (PLANT SHUTDOWN)

                                                      7.   ORYX-GTL CN-009-10-EN PIC OF STEAM-PURGED OXYGEN NOZZLE

                                                      8.   LARSEN&TURBO /QP STATION A4,A5&V ERECTION OF STATION  PIPING

                                                      9.   MAERKS/QP ONFAGAS NORTHFIELD ALFA VALVE REPLACEMENT

                       

      Position                                 :     SENIOR PLANNING ENGINEER  

Responsibilities:   Prepares and coordinate planning/scheduling of works, invoicing and cost monitoring for EPIC project. Evaluation of consultants and sub-contractors manhours, cost schedules, deliverables programs inline with projects requirement.

 

COMPANY                             :     DESCON ENGINEERING, ABU DHABI, UAE

                                                         Musaffah Industrial Area, P.O. Box 46821, Abu Dhabi     

      Year of Employment              :     April 16 2007 To June 04, 2007

      Project Title                          :     ENOC EPCL NAPTHA HYDROTREATER PROCESS PLANT CONST.

      Position                                :     PLANNING ENGINEER

Responsibilities:   Review and Evaluates Technical Proposal for the Projects which includes  Schedules, Manpower and Resources, Work Narrative Plan, Sub Contractors Plan, Equipments and Manpower and other Resources and Estimated manhours.

  1. Calculate Total Diameter inches of piping for the whole Project and the Total Tonnage for Stationary and Rotary Equipment.
  2. Review the dates of Equipment delivery to incorporate in the overall final schedule 
  3. Prepares Early Works, Mobilization Plans, Documentation and Submittals 

      Year of Employment              :     February 28 to April 15, 2007

      Project Title                          :     GASCO PROJECT 1505PLANT SHUTDOWN

      Position                                :     PLANNING ENGINEER

Responsibilities:     Prepares and coordinate planning and scheduling of plant shutdown of GASCO, Bab, Habshan (Gas Process Plant).

  1. Receives work shutdown list, shutdown blind list and accordingly prepare materials such as blinds, gaskets, equipment parts and
  2. Prepares shutdown schedule in Primavera 3.0 bar consumables.chart schedule in level III and level IV format.



1 COMPANY  :                   AMEC SERVICES LTD., Philippines Branch

                                        Level-22 Tower1, Insular Life Corporate Center

                                        Corporate Corner Commerce Avenue

                                        Filinvest Corporate City, Alabang, Muntinlupa City, Phil.1780

                                                       

      Year of Employment              :     Jul 24, 2006 to Feb 26, 2007

      Project Title                         :     SHELL PHIL. MALAMPAYA PROJECT

      Position                               :     PLANNING ENGINEER/ SHUTDOWN PLANNER MALAMPAYA

Responsibilities:    Member of the core onshore Maintenance & Integrity support team and has accountability for the production and maintenance of the asset’s maintenance plans including input to the offshore 28 and 90 Day Plans, the shutdown plans and Integrated Activity Plan, in accordance with the approved Project Procedures. 

  1. Maintenance of the Offshore 28 & 90 Day Plans, particular attention to be paid to minimizing production outages, improving cost performance and POB efficiency
  2. Focal point for the asset’s maintenance plan and alignment with all other related plans.
  3. Produce POB information to facilitate the management needs of the platform, finance department and logistics/air traffic
  4. Liaising with the asset shutdown planner to ensure proper alignment and prioritization of maintenance work in shutdown scopes.
  5. Main interface with: IAP Planner, SAP Team, Onshore/Offshore Maint. Engineer, Campaign Maint. Planner, Shutdown Planner and OIMS.
  6. Scheduling technique used: -
  7. Shell SAP Blue print interface with Primavera P3e.

 COMPANY                             :     ZOMCO, ZAMIL OPERATION & MAINT. CO. LTD.

                                                  PO Box 11810, Jubail 31961, Kingdom of Saudi Arabia

                                                         Telephone No. 00-(966) (3) 341-0732 IP3525

     

      Year of Employment              :     May 11, 2004 to May 11 2006

      Project Title                            :     MARAFIQ, Jubail, KSA

                                                         Contract # MCJ-100-101  Potable water Distribution, Sea Water

                                                         Cooling, P/Water Desalination and Waste Water Treatment Plant.

                                                          

      Position                                 :     MAINTENANCE PLANNING SUPERVISOR

      Responsibilities                      :     Supervising five (5) Planning Engineers, ten (10) Planners and Schedulers, and four (4) Material Coordinators.

  1. Plan, schedule and allocate work as well as supervising the performance of my subordinates to ensure that all of the work is done promptly and efficiently.
  2. Compile and prepare maintenance daily report (MDR), monthly plans and daily schedules.
  3. Compile and prepare material status report.
  4. Prepare monthly accomplishment reports and Key Performance Indicators.
  5. Participating in operation, maintenance, material and engineering meeting.

     

      Year of Employment              : March 31, 1999 to May 10, 2004

      Project Title                            :     Saudi ARAMCO Ship Repair, Contract # 43793

      Position                                 :     MAINTENANCE PLANNER AND SCHEDULER

Responsibilities    :     Responsible for planning sequence of production operation, and scheduling of work using ARAMCO SAP system of planning.

  1. Determine shop capabilities, material availability and critical dates.
  2. Compile production schedules to meet SAUDI ARAMCO estimates and to track daily production progress.
  3. Develop work schedule milestone events (PERT/CPM) and evaluate actual progress versus prepared schedules.
  4. Update work schedule on a regular basis indicating the actual dates and time frame actually consumed in the performance of certain activity in the work schedule.
  5. Develop manning schedules and S-curve chart. Determines causes of delays and recommend for corrective action or revision of schedules.
  6. Prepares daily schedule, morning report, weekly report, monthly report and annual reports.
  7. Scheduling techniques used:
  8. Traditional method (Gant Chart); PERT/CPM ADM
  9. Primavera P3 and MS Project

 

  1. COMPANY                             :     ROTARY INTERNATIONAL LTD.

                                                         PO Box 300 Tuen Mun Central Post Office, Tuen Mun,

                                                         Hong Kong, China

                                                         Telephone No. 00-(852) 2769-3833

      Year of Employment              :     May 11, 1996 to July 12, 1998 

       Project Title                           :     The New Hong Kong Airport at Chek Lap Kok, Contract #320 

       Position                                :     CONSTRUCTION PLANNER AND SCHEDULER

Responsibilities:     Responsible for planning sequence of construction operation, and scheduling of work assignment using Airport Authority system of planning (PRIMAVERA).

  1. Compile production schedules to meet Airport Authority estimates and to track daily production progress.
  2. Prepares daily schedule, accomplishment report, morning report, weekly report and monthly report.
  3. Develop work schedule milestone events (PERT/CPM) and evaluate actual progress versus prepared schedules.
  4. Develop manning schedules and S-curve chart. Determines causes of delays and recommend for corrective action or revision of schedules.

           

  1. COMPANY                             :     UTS KENT & MF KENT LTD.

                                                         PO Box 277, Abu Dhabi, UAE

                                                         Telephone No. 727323

      Year of Employment              :     November 23, 1993 to October 27, 1995

      Position                                 :     MECHANICAL FOREMAN

      Project Title                            :     MODICS “A” Project (Modernization of DAS Island Control System. 

Responsibilities :     Take-charge, direct the planning, control of materials and sequence the works;

  1. Install assorted kind of instrument (pressure switches, temperature switches, level switches, gas/fire detectors, marshalling boxes, instrument boxes, marshalling cabinet and CC panels).
  2. Supervising in laying, bending and installation of instrumentation tubing and piping system. As-built construction drawings as constructed.

       Project Title                            :     Water Injection and Power Project, ADCO Habshan, Abu Dhabi

                                                   :     Water Injection and Power Project, ADCO, Asab, Abu Dhabi

       Responsibilities                      :     Take-charges direct the planning, control of materials and sequence the works;

  1. Supervising in erection and installation of four (4units) THOMASSEN Gas Turbines and all other auxiliary machineries and equipt. Prepare daily and weekly accomplishment reports.

                                                  

      Project Title                            :     Water and Energy Department (WED) GAS Turbine Package Units

                                                         Abu Dhabi & Alain Power Stations Contract No. WED/P/S/AD/176/92

      Position                                 :     MECHANICAL FOREMAN

Responsibilities:     Take-charge, direct the planning, control of materials and sequence the works;

  1. Supervising in erection of eight (8units) MARUBINI Gas Turbines and all other auxiliary machineries and equipment.
  2.  Prepare daily and weekly accomplishment reports.

 

  1. COMPANY                             :     NAVSHIP Naval Shipyard, Naval Support Command

                                                         Philippine Navy, Cavite, Philippines                      

      Year of Employment              :     December 27, 1981 to Dec 28, 1993  

      Project Title                            :     Ship Repair and Maintenance 

      Position                                 :     MAINTENANCE PLANNER AND SCHEDULER

Responsibilities :     Responsible for planning sequence of production operation, and scheduling of work using traditional Gantt charting and PERT/CPM networking.

  1. Determine shop capabilities, material availability and critical dates.
  2. Develop work schedule milestone events (PERT/CPM) and evaluate actual progress versus prepared schedules.
  3. Update work schedule on a regular basis indicating the actual dates and time frame actually consumed in the performance of certain activity in the work schedule.
  4. Develop manning schedules and S-curve chart. Determines causes of delays and recommend for corrective action or revision of schedules.
  5. Prepares daily schedule, morning report, weekly report, monthly report and annual reports.         

       Position                                 :     MARINE MECHANIC

Responsibilities :     Carried out skilled maintenance, overhaul, repair and alignment works on variety of ship equipment, including;

  1. Pumps (fresh water pump, bilge pump, sea water pump, fire pump, hydraulic pump).
  2. Air compressor (Hamworthy and Ingersoll-Rand).
  3. Deck machinery (towing winch, capstan, anchor winch and deck cranes).
  4. Main and auxiliary machinery (petrol and diesel engines). Plate types and tube types heat exchangers.
  5. Propeller, shaft and rudder ; Voith & Sneider (VSP); B&W Propeller Pitch Control; Schottel Thruster.