projects deemed failure
Forum Topichi all,what is projects deemed failure?best,muataz
hi all,what is projects deemed failure?best,muataz
Is there a setting that handles this...? Float using Mandatory = 30 for example, but if using "On or before" exact same date sais 0 instead of the 30 days - why? should be 30 also...I used P3 longer than P6 but if I add a finish on or before Constrai...
I've just started to examine the tables within XER files. Within the Calendar table, there is a field called clndr_data, which has the calendar data for each calendar, i.e. the working time / days within the calendar and exceptions.The problem is how...
Corporate project management system usually includes the databases (reference-books) of the corporate standards and templates.These templates usually include the library of typical fragments that are small projects describing creation of typical proj...
In my project, There are three WBS. The first and third WBS are about project start and finish procedures. And the second WBS is about all project works of different desciplines. Is there any possible technique in P6 to identify the total float based...
Hi All,Could any one recommend me with an excellent Project Management Information System (PMIS)? I need this for company projects and need to be used by project managers and planners.best,Muataz
I've imported a new project and I have started to update the progress. I've had a few problems:1. When I update the actual units on an activity the actuals are added on to the at completion instead of taken away from at completion units. In other pro...
Hello Vladimir,Materials in Spider have an option called Discrete Consumtion which rounds up the consumtion of the material (granted the Backload consuption is set to No).So here is my question, is there a way to do this with resources?Example: Backh...
Hi,Does anyone know if its possible to create user defined columns that you can populate from drop down lists?looking to create a columns where I can have units such as kg, tonne, m , m2 etcRegardsChris
Hello Vladimir,in the latest versions of Spider Macros have been introduced as a new functionality. There are two types of macros:Internal, from what I understand these are macros applied at the project (file) level;External, from what I understant t...
What job title would best reflect my current position? What info to select for my Linkedin profile to a better position/advertise myself & match it with what employers & recruiters look for? My role is multifold and I share some responsibilities of B...
Every tree or two months, my Schedule Variance increase, my planner modify the baseline eachtime two reduce the variance, is it correct to do it? and if it's correct in which case we have to do it please?
Hello everybody,Best wishes to the PP's community as our calendars approach the 2019 switch in approximately two weeks.For the planners taking christmas as a day off, merry christmas and enjoy the days out! For all the others, planning or not, happy...
Greetings to everyone. Is there any possible technique in primavera to get all the schedule % complete for each day ? Thanks in advance.
Hi,I would like to seek the expert advice here as to what sort of historical data a planner should have readily on hand by the end of a project, to better prepare for the next one. This would include things like Scope / Rates / Costs.Are there any ot...
Hi every body,I'm looking for a methedology to build a recovery schedule, because we are late and a lot of gaps was noted and our contractor was very furious, what is the best solution please ?
Can someone tell me the maximum number of activities for a single planner to maitain efficiently ?ThanksRoberto
Has someone a sample use of WPA new facility in TILOS 10.2 ?Thanks Roberto
Hi,In our project plan, I want to filter acitivities under Podium - Level 01 (Activties circled in attached image). Please help.[[wysiwyg_imageupload:6438:]]
Hi.Basically the situation is I need to do a revise programme, so I used the latest updated schedule, revise and re-baseline it. So from the revised programme, I input new resources as I need to generate S-Curve with 3 main elements which are Planned...