Substantial Completion Date Change

Forum Topic

Currently I'm working on a project where I review a subcontractor's P6 schedule and implement their update when I submit mine to the client. When I import their project into my machine, I hit re-calculate and their Substantial Completion date changes...

Mar 18, 2015

Request for project planning survey

Forum Topic

Hello Everyone, I am studying Quantity Surveying at Coventry University. As part of my final year dissertation, I am carrying out this survey about project planning. It would be very helpful if you could complete this short project planning survey by...

Mar 18, 2015

Inserting Gantt Chart Gridlines in Primavera P6

Forum Topic

We had a call from someone who had become frustrated with trying to change the Primavera P6 Gantt chart gridlines for printout. If you didn’t know, the Gridlines toggle in the print page setup dialog only controls the gridlines of the activity table;...

Mar 20, 2015

Thorny one -How would you model this?

Forum Topic

Contractor A has a large construction project in the middle of nowhere. The logistics route from the nearest available port to the workfront is >1,500km long and in poor condition, and will have to carry something like 200,000 tonnes of plant, equipm...

Mar 20, 2015

What is the best way to compare 2 schedules?

Forum Topic

I want to find out what relationships have been added / deleted from a previous schedule. What is the best (or fastest) way of doing this automatically, without having to review them one by one, visually, manually, etc.?

Mar 21, 2015

Topic for MS (Project Management) Thesis

Forum Topic

Dear PM Professionals!I am in process of selecting thesis for my MS (Project management) Degree. My basic job involve Cost Estimation and Cost Control in construction industry of saudi arabia. I want to make thesis either in Cost Estimation or Cost C...

Mar 21, 2015

Man hours query

Forum Topic

Dear all,Please help me out in couple of queries1) I have budgeted labour, budgeted non labour (equipment hrs) units for each activity in project. when i calculate progress based on budgeted units alone do i have to consider only labour units as this...

Mar 22, 2015

P6 8.2 - Revised baseline - Copying actuals from status update

Forum Topic

Hi,When we revise links and add activities to our original baseline to make it revised baseline, how to copy the actual dates from the updated schedule to reflect on the new (re linked) schedule?Re applying actuals one by one for hundreds of activiti...

Mar 24, 2015

Loaded Costs are not spreading in the activity's duration

Forum Topic

Dear Experts,We have a program fully loaded with cost and manpower. The problem that we are facing right now is that lots of costs that were loaded to the program are not spreading to the entire duration of the activity. Can anyone share his knowledg...

Mar 24, 2015

Zero Duration % complete

Forum Topic

Hii,I get 0 duration % complete for one particular set of activity codes at the WBS level, but all other activities which are in progress/ completed rolls up to some value in the WBS level.The activity type assiged is Fixed Durations & Units for all ...

Mar 24, 2015

P6 Group and Sort View Layout Problem

Forum Topic

This may sound very easy question but we cannot find how to establish a constant group and sort view by clicking just once. I can prepare group and sort as my own way but I failed when I want to send this group and sort layout to my friend. He could ...

Mar 25, 2015

Resource Leveling

Forum Topic

Dear Planners,How to make Primavera does not revert the original schedule when re-schedule the program after resource leveling is done.Best,Moutaz

Mar 26, 2015

Material Submittal Delay

Forum Topic

Hi All,I have the following scenario of delay due to the late material submission by the Contractor.Material Submittal: 30 daysApproval by Engineer: 21 daysMaterial Procurement: 5 monthsConstruction & Commissioning: 3 monthsThe above are the planned ...

Mar 26, 2015

Primavea vs MS Project

Forum Topic

Good day, I use MS project and currently try to move to Primavera. But there are some things that I can't do in Primavera. For example in linked photo ( http://imgh.us/MS_Project.jpg ) you can find screenshot from MS project where I allocated resourc...

Mar 26, 2015

P6 project layout

Forum Topic

I'd like to create a layout in project view where if project status = planned, inactive, active etc. it gives me a bar of a different colour for each.I tried to create filters for this but they don't appear to be available in the when I try to add a ...

Dec 1, 2014