Slip Forming

Wiki Page

Concrete - Slip Forming A typical period of 10 - 14 days is required to setup the shutter on the ground and cast the platform. Rate of climb of formwork = 200 - 300 mm/hr.

Feb 7, 2009

Table Forms

Wiki Page

Concrete - Table Forms Fast method of forming walls/slabs with movable shutter. This rate is inclusive of walls and columns etc. Rate of 100 - 150 m2/day

Feb 7, 2009

Tunnel Forms

Wiki Page

Concrete - Tunnel Forms A system of forms which enables walls and slabs to be cast in the same pour. suited to buildings with large number of identically sized rooms, such as hotels or flats. Used in conjunction with high speed concrete pumps, pre-fo...

Feb 7, 2009

Post Tensioning

Wiki Page

Concrete - Post Tensioning Sequence:Concrete poured 1st Bay.After 48 hrs concrete is stressed to initial strength (15 kN takes 1 day).5 days after initial stressing, concrete is stressed to final strength (30 kN takes 1 day).Formwork may now be struc...

Feb 7, 2009

Hollorib Decking

Wiki Page

Hollorib Decking Lay decking = 350 m2/day Shear Connecting Studs 235 m2 studded per day per gun (4,000 studs/week) Concrete topping = 4,000 m2/week or 2,000 m2/week incl power floating

Feb 7, 2009

Stone Cladding

Wiki Page

External Stone Walls Various stone finishes are available...Polished / Tooled = Highly reflective finish. The full colour and grain of the stone becomes visible. A poished fiish seals the pores and gives a good weather and chemical protection.Honed =...

Feb 7, 2009

Doors & Window Installation

Wiki Page

InstallationFor windows that are not 'built-in' as work proceeds...Install & Fix - By Area = 2.0 m2/hrInstall & Fix - By Girth = 4.0 m/hrMastic Pointing = 6.0 m/hrDoors and WindowsTask / DescriptionSlow  Ave  Fast   Units Mastic Pointing to Frames-  ...

Feb 7, 2009

Glazing

Wiki Page

Glazing to windows, a typical rate of 1.23 m2/hr Sealed Glazing Units Single glazed units = 80.0 m2/wk Double glazed units = 45.0 m2/wk

Feb 7, 2009

Facade Cleaning

Wiki Page

Water Jetting = 25.0 m2/day Acid Etching = 9.0 m2/day Grit Blasting = 12.0 m2/day

Feb 7, 2009

Cladding Restoration

Wiki Page

Brickwork Restoration = 6.5 m2/day Stonework Restoration = 20.0 m/day (single course)

Feb 7, 2009

The ‘notices’ provision in the Contract

Wiki Page

  The ‘notices’ provision    Many of you will deal with industry-standard form contracts, while others will deal with company Standard or even bespoke forms; whatever the form of contract, the notices provision contained in the conditions of contract...

Oct 14, 2010

Steel

Wiki Page
Jul 13, 2009

Internally

Wiki Page

One coat primer, 1 undercoat, 1 gloss 2.40 m2/hr As above to steel stanchions and beams 1.30 m2/hr As above to balustrades, railings etc 1.40 m2/hr

Jul 13, 2009

Externally

Wiki Page

One coat primer, 2 undercoats, 1 gloss 1.70 m2/hr As above to steel stanchions and beams 0.90 m2/hr As above to balustrades, railings etc 1.00 m2/hr As above to gutter and downpipes etc 2.50 m/hr

Jul 13, 2009

Excavate & Reduce Levels

Wiki Page

Excavate By Hand Trenches (m3/hr)      Depth in Metres->Ne 1.51.5-3.03.0-4.5    Sand/Soil lose0.660.450.33Sand/Soil firm0.570.380.28Gravel0.450.310.23Clay/Heavy Soil0.460.310.24Boulder Clay0.380.260.19Pits or Bases Ne 2 m2 (m3/hr)                   D...

Jul 14, 2009

Beam Falsework Formwork

Wiki Page

Rates include for making, fixing, cleaning and minor repair works etc, rates in m2/hr.Soffits - On runners and props, including erection of props etc. Hight of Beam Soffit--->      0 - 3.5 m3.5 - 5.0 mWidthFixStrikeFixStrike     100 - 200 mm0.701.230...

Jul 15, 2009

Mixing Concrete

Wiki Page

Mixing By HandA typical rate of 0.32 m3/hr of concrete. Compulsory Paddle Mixer Generally with one or two 3.5m3 drums, giving a cycle time of 60 to 80 seconds (m3/Hr).                          Mix Time -->60 secs80 secsSingle drum plant210158Double d...

Jul 15, 2009

Place Concrete

Wiki Page

Barrowing Concrete (m3/hr).Receive concrete from mixer/lorry direct to barrow, wheel to placing position, tip and return.Distance0 - 10 m2.32 10 - 20 m1.81 20 - 50 m1.08As above but including load concrete from deck/tray.                Distance0 - 1...

Jul 15, 2009

Granolithic Flooring

Wiki Page

Typically carried out with a gang of 2 layers and a single labourer.   Typical rate of 3.15 m2/hr  

Aug 10, 2009