Blockwork
Wiki PageBlockwork
Blockwork
Professioanl development for projects controls specailists is a tricky areas with very little on offer. Project managers seem to have a wide range of choice including PRINCE2 and APMP in the UK and PMP Certification for those in the international mar...
DeckingTask / DescriptionSlow Ave Fast Units Simple Universal Beam Steel Bridge, concrete bridge deck, grano cover- 7.1 - m/day
Excavate and RemoveTask / DescriptionSlow Ave Fast Units Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil14.5 20.0 25.6 m3/hr Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds15.2 20.4 25.6 m3/hr Excavate Spoil Heaps to Tr...
Termination of the contract For termination of a contract due to default by the Contractor, FIDIC 4th Edition provides remedies for the employer in Clause 63.1 which, save for a fairly common provision relating to the contractor’s bankruptcy, liquida...
Concrete FinishingTask / DescriptionSlow Ave Fast Units Surface Finishing, Steel Float By Hand9.2 13.9 25.0 m2/hr Surface Finishing, Wood Float By Hand11.7 17.2 29.4 m2/hr Surface Finishing, Power Float13.9 20.8 37.0 m2/hr Surface Finishing, L...
Ceiling FinishesTask / DescriptionSlow Ave Fast Units Suspended Ceilings, office situations- 2.6 3.5 m2/hr Suspended Ceilings, First Fix- 0.7 - m2/hr Suspended Ceilings, Second Fix- 1.2 - m2/hr
Carpentry Final FixingTask / DescriptionSlow Ave Fast Units Windows, Softwood, 3.0-7.0m20.6 0.4 0.3 hrs/no Windows, Softwood, 7.0-10.0m21.3 0.9 0.6 hrs/no Windows, Hardwood, 1.0-3.0m20.4 0.3 - hrs/no Windows, Hardwood, 3.0-7.0m20.7 0.5 0.4 h...
Carpentry CarcassingTask / DescriptionSlow Ave Fast Units Windows, Timber Frames for Bricklaying1.1 0.5 0.1 hrs/no Windows, Drill, Screw & Plug extra over0.3 0.1 - hrs/no Door Frames, Softwood, 1.0-3.0m2- 0.2 - hrs/no Door Frames, Softwood,...
Carpentry & JoineryTask / DescriptionSlow Ave Fast Units Formwork to Soffit of Manhole- 1.8 - m2/hr Formwork to Walls of Manhole11.2 14.2 20.2 m2/hr Formwork to Road Edges, straight- 7.7 - m/hr Formwork to Road Edges, curves- 6.2 - m/hr
Bulk ExcavationTask / DescriptionSlow Ave Fast Units Excavation Bulking Factor, Sand/Soil- 15.0 20.0 % Excavation Bulking Factor, Gravel- 33.0 - % Excavation Bulking Factor, Clay/Chalk- 40.0 - % Excavation Bulking Factor, Boulder Clay- 4...
Basement ExcavationTask / DescriptionSlow Ave Fast Units Hydraulic Excavator, 0.3m3 bucket, Sand/Soil - Basement Works6.4 8.0 9.4 m3/hr Hydraulic Excavator, 0.3m3 bucket, Gravel Beds - Basement Works5.5 6.9 8.1 m3/hr Hydraulic Excavator, 0.3m3 ...
Bell Ground AnchorsTask / DescriptionSlow Ave Fast Units Uncased Anchors, 10m long- 2.0 - no/day Top Cased Anchors, 15m long- 1.0 - no/day Anchors stressing- 2.2 - no/day
Bored PilingTask / DescriptionSlow Ave Fast Units Cycle Time, 5-20m deep8.0 4.0 4.0 days/no Cycle Time, 20-40m deep10.0 8.0 - days/no Cycle Time, 40-70m deep25.0 10.0 - days/no Cycle Time, 70-90m deep45.0 25.0 - days/no Cycle Time, 90-135m...
ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Footing formworkFooting - Shuttering & Providing SupportSqm0.8 Mandays/10Sqm1.5 Mandays/10SqmMS Wall Form Panel - 1250 x 500 : 16Nos...
ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Raft formworkRaft - Shuttering & Providing SupportSqm0.71 Mandays/10Sqm1.41 Mandays/10SqmMS Wall Form Panel - 1250 x 500 : 16Nos/10...
ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Walls formworkWalls (Any Thickness), Including Buttresses - Shuttering & Providing Support - Up to 3.5m HeightSqm2.22 Mandays/10Sqm...
ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Staircase formworkStaircase (Excluding Spiral Staircase) - Shuttering & Providing SupportSqm0.23 Mandays/Sqm0.46 Mandays/SqmMS Floor...
ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Ramp formworkRamp - Shuttering & Providing SupportSqm0.22 Mandays/Sqm0.44 Mandays/SqmMS Floor Form Panel - 750 x 600 - 13.3Nos/10Sq...
ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Shades FormworkWeather Shade, Chajjas, Corbels Shuttering (Including Propping)Sqm0.12 Mandays/Sqm0.14 Mandays/SqmMS Floor Form Pane...