Bulk Excavation

Wiki Page

Bulk ExcavationTask / DescriptionSlow  Ave  Fast   Units Excavation Bulking Factor, Sand/Soil-  15.0 20.0  % Excavation Bulking Factor, Gravel-  33.0 -   % Excavation Bulking Factor, Clay/Chalk-  40.0 -   % Excavation Bulking Factor, Boulder Clay-  4...

Jul 19, 2011

Basement Excavation

Wiki Page

Basement ExcavationTask / DescriptionSlow  Ave  Fast   Units Hydraulic Excavator, 0.3m3 bucket, Sand/Soil - Basement Works6.4 8.0 9.4  m3/hr Hydraulic Excavator, 0.3m3 bucket, Gravel Beds - Basement Works5.5 6.9 8.1  m3/hr Hydraulic Excavator, 0.3m3 ...

Jul 19, 2011

Bell Ground Anchors

Wiki Page

Bell Ground AnchorsTask / DescriptionSlow  Ave  Fast   Units Uncased Anchors, 10m long-  2.0 -   no/day Top Cased Anchors, 15m long-  1.0 -   no/day Anchors stressing-  2.2 -   no/day

Jul 19, 2011

Bored Piling

Wiki Page

Bored PilingTask / DescriptionSlow  Ave  Fast   Units Cycle Time, 5-20m deep8.0 4.0 4.0  days/no Cycle Time, 20-40m deep10.0 8.0 -   days/no Cycle Time, 40-70m deep25.0 10.0 -   days/no Cycle Time, 70-90m deep45.0 25.0 -   days/no Cycle Time, 90-135m...

Jul 19, 2011

Footing formwork

Wiki Page

ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Footing formworkFooting - Shuttering & Providing SupportSqm0.8 Mandays/10Sqm1.5 Mandays/10SqmMS Wall Form Panel - 1250 x 500 : 16Nos...

Jun 6, 2011

Raft formwork

Wiki Page

 ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Raft formworkRaft - Shuttering & Providing SupportSqm0.71 Mandays/10Sqm1.41 Mandays/10SqmMS Wall Form Panel - 1250 x 500 : 16Nos/10...

Jun 6, 2011

Walls formwork

Wiki Page

 ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Walls formworkWalls (Any Thickness), Including Buttresses - Shuttering & Providing Support - Up to 3.5m HeightSqm2.22 Mandays/10Sqm...

Jun 6, 2011

Staircase formwork

Wiki Page

ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Staircase formworkStaircase (Excluding Spiral Staircase) - Shuttering & Providing SupportSqm0.23 Mandays/Sqm0.46 Mandays/SqmMS Floor...

Jun 6, 2011

Ramp formwork

Wiki Page

 ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Ramp formworkRamp - Shuttering & Providing SupportSqm0.22 Mandays/Sqm0.44 Mandays/SqmMS Floor Form Panel - 750 x 600 - 13.3Nos/10Sq...

Jun 6, 2011

Shades Formwork

Wiki Page

 ActivityTASKSTask - UOMLabor (L) - Carpenter (Mandays)Labor (L) - Helper (Mandays)Material (M)Material (M)Material (M)Shades FormworkWeather Shade, Chajjas, Corbels Shuttering (Including Propping)Sqm0.12 Mandays/Sqm0.14 Mandays/SqmMS Floor Form Pane...

Jun 6, 2011

Footing Reinforcement

Wiki Page

 ActivityTASKSTask - UOML - Barbender/Fitter (Mandays)L - Helper (Mandays)MMMFooting ReinforcementFoot Rein - Placing in Position & Binding - Using TMT Bars, Mild Steel, Tor SteelMt0.28 Mandays/0.1Mt0.38 Mandays/0.1MtBars - Include 5% WastageBinding ...

Jun 6, 2011

Walls Reinforcement

Wiki Page

 ActivityTASKSTask - UOML - Barbender/Fitter (Mandays)L - Helper (Mandays)MMMWalls ReinforcementWalls Rein - Placing in Position & Binding - Using TMT Bars, Mild Steel, Tor SteelMt0.41 Mandays/0.1Mt0.45 Mandays/0.1MtBars - Include 5% WastageBinding W...

Jun 6, 2011

Staircase Reinforcement

Wiki Page

 ActivityTASKSTask - UOML - Barbender/Fitter (Mandays)L - Helper (Mandays)MMMStaircase ReinforcementStaircase Rein - Placing in Position & Binding - Using TMT Bars, Mild Steel, Tor SteelMt0.32 Mandays/0.1Mt0.34 Mandays/0.1MtBars - Include 5% WastageB...

Jun 6, 2011

Progress Over-Ride

Wiki Page

network logic is ignored and the activity can progress without respect to predecessorrs

Dec 14, 2011

Constructability

Wiki Page

Constructability; techniques, definitions of, examplars.

Feb 11, 2011

Planning Planet Zone at London Olympia

Page

We want to say thanks to the 700+ members who came along to see us on the 21st and / or 22nd September.  We had a great two days, meeting people and talking about the Guild initiative.  The presentations were very much appreciated and informative.We ...

Feb 16, 2011

Scheduling

Wiki Page

Scheduling is the process of deciding how to commit resources between a variety of possible tasks and often refers to the creation of a time or resource schedule.

Mar 18, 2011

Project Controls

Wiki Page

Project Controls relates to the use of systems and is that element of a project that keeps it on-track, on-time and within budget.

Mar 18, 2011

Cost Engineering

Wiki Page

Cost Engineering is concerned with the application of techniques encompassing cost estimating, cost control, profitability analysis, project management, relating to the planning and scheduling of projects.  Cost Engineers are similar to those of Quan...

Mar 18, 2011

Concrete Road surfacing

Wiki Page

Task / DescriptionSlow  Ave  Fast   Units Concrete Road surfacing, Kerbs or Side Haunches-  0.4 -   m3/hr Concrete Road surfacing, 150mm thick-  12.5 -   m2/hr Concrete Road surfacing, 200mm thick-  7.7 -   m2/hr Concrete Road surfacing, 300mm thick-...