Deltek - Open Plan
Wiki PageDeltek Open Plan is an enterprise-class project management solution for medium to large/multiple projects. Details: [[http://tinyurl.com/ple5pz]]
Deltek Open Plan is an enterprise-class project management solution for medium to large/multiple projects. Details: [[http://tinyurl.com/ple5pz]]
Common Brickwork, by Machine (no/hr) Hole depth (mm) --> 0-75 75-125 125-250 250-375 375-500 Ne 100 cm2 - 16.6 7.69 5.26 4.00 100-250 cm2 - 12.5 5.88 4.00 2.94 250-500 cm2 - 10.0 5.00 3.33 2.50 500-100 cm2 - 8.33 4.17 2.78 2.08 Common Bri...
PaintingTask / DescriptionSlow Ave Fast Units Prepare Walls- 14.2 - m2/hr Prepare Doors- 12.5 - m2/hr Prepare Door Frames- 25.0 - m/hr Burn Off / Heat Strip Paintwork- 1.1 - m2/hr Internal Timber, 1 coat primer before fixing, generall...
Strip Existing Wallpapers (3 layers) 5.00 m2/hr Burn Off/Heat Strip Paintwork 1.00 m2/hr Chemically Strip Paintwork 1.30 m2/hr Prepare walls 14.20 m2/hr Prepare door frame 25.00 m/hr Prepare door 12.50 m2/hr
(Rates per coat unless stated otherwise) One coat primer, before fixing generally 6.70 m2/hr One coat primer, before fixing lengths 20.0 m/hr Knot, 1 primer, stop, 1 undercoat, 1 gloss 1.75 m2/hr Touchup primer, 1 undercoat, 1 coat gloss 3.10 m2/hr...
2 coats emulsion - to plaster 8.00 m2/hr - to brick/blockwork 6.00 m2/hr 1 mist, 2 emulsion - to plaster 6.00 m2/hr - to brick/blockwork 4.50 m2/hr 1 primer, 1 undercoat, 1 gloss - to plaster 2.30 m2/hr Undercoat - to door frame 20.00 m/hr Gloss - to...
2 coats sandtex etc - to render/concrete 2.50 m2/hr - to brick/blockwork 2.00 m2/hr 1 sealer, 2 emulsion - to render/concrete 2.00 m2/hr - to brick/blockwork 1.70 m2/hr
Epoxy floor paint 2.95 m2/hr
Emulsion paint - 2 coat 6.05 m2/hr - 3 coats 5.02 m2/hr Textured paint 4.20 m2/hr Artex 4.10 m2/hr
Pipe welding is not that straight forward. You have a number of welding passes to take into consideration, then NDT and finally hydrotesting. I worked on a pipeline construction project in Iraq and used the following formulae to work out duration f...
The Industry Foundation Classes (IFC) data model is intended to describe building and construction industry data.It is a neutral and open specification that is not controlled by a single vendor or group of vendors. It is an object-based file format w...
Tekla develops model-based software products for the architectural, engineering, and construction (AEC) market, for local government use and for power companies. These products provide users with state-of-the-art features and functionality for creati...
3D Objects are 3D digital representations of elements of a 3d BIM model such as RC columns or even a light bulb. They are intelligent items/objects that have unique characteristics such as weight,area,density and volume.
BIM 4D Focus Time is a part of the 4d timeline in 4d software whereby viewers of a 4d model can manipulate the actions of the 4d scenario by sliding the focus time on the Gantt Chart element.
Headquartered in Birmingham, England, Synchro Ltd began software product development in 2001 on its construction simulation and task management solution, and has been recognized for its achievements in producing award-winning, innovation technology. ...
5D BIM is the cost element of BIM. 5D stage takes place from concept stage through to handover of a project. It also has significance during the Asset Management stage of a project.