Search

Seasons Greetings

News

Some yuletide greetings to everyone...While shepherds watched their flocks by night.... PP admin formed a vision To upgrade our site and add subscribers was our mission. More than that to add value to our members was our aim When we achieve this ever...

Dec 22, 2009

PP SERVER AND DATABASE UPGRADES

News

Dear All,As a result of the continued growth in our community membership we are having to upgrade our server and the databases that house the sites content.You may have noticed some short periods of site down-time recently, this is due to us having t...

Jan 7, 2010

Planning Planet strikes agreement with Asta Development

News

Planning Planet strikes agreement with Asta DevelopmentPlanning Planet announces that it has entered into an agreement with Asta Development, a leader in project management software solutions for construction and IT.The deal will broaden Asta Develop...

Feb 1, 2010

Consultado Brasileiro

Wiki Page

 Brasil (Brazil) Consul: Peter Berndt de Souza MelloTel: +55 61 8153-8290Email: [email protected] consulado tem como objetivo aproximar os profissionais de planejamento no Brasil em um fórum com oportunidades internacionais. Nós iremos ...

Sep 14, 2010

Escalator Installation

Wiki Page

Modular Design Escalators PackagesThe escalator trusses are usually delivered in 1.6 m cubes, which include the internal workings etc. Normally 3 to 4 sections go to make up a standard escalator (an 11 m rise), however sizes and lengths vary greatly....

Feb 7, 2009

Road Markings

Wiki Page

Road and Car Park Markings 75 mm road lines = 20.5 m/hr Road writing = 3.5 hrs/word or symbol

Feb 8, 2009

Road Surfaces

Wiki Page

Barber Greene 8798 machine laying 100 mm in two coats (m2/hr)... Tarmacadam = 160.0 Asphalt = 145.0 Manual laying 100 mm in two coats (m2/hr)... Tarmacadam = 7.7 Asphalt = 5.0 Average laying of Asphalt wearing Course=40 Ton/hr so one crew can do 400 ...

Feb 8, 2009

Covered Steel Footbridge

Wiki Page

Simple universal beam steel bridge in modular sections, welded on site. 16 truss sections each 15 m in length, supported on H-frame vertical columns / supports.Support Steelwork Fabrication (4 bays) = 25 daysSupport Steelwork Erection (4 bays) = 30 d...

Feb 8, 2009

Soft Landscaping

Wiki Page

SoilSpread topsoil, prepare for turf/seeding = 2.5 m2/hr Spread fertilizer and rake in = 25.0 m2/hrPlantingHedges or Shrubs, ne 750 mm high = 4.0 no/hr Hedges or Shrubs, exc 750 m high = 1.5 no/hr Saplings, ne 3.0 m high = 1.7 hrs/noTurfingTypical ra...

Feb 8, 2009

Wall & Ceiling Coverings

Wiki Page

Paper CoveringsWall paper and lining paper = 5.00 m2/hr Vinyl and washable papers = 4.20 m2/hrCeiling lining paper = 4.00 m2/hrRates in relation to one skilled craftsman and labourer.Wallpapering...Task / DescriptionSlow  Ave  Fast   Units Strip Exis...

Feb 8, 2009

The Purpose of the Project Schedule

Wiki Page

The project schedule is one of the most important tools in creating a successful project (usually after building a good team). However, the true value of the schedule is only achieved if several other tools are implemented and integrated. To develop ...

Feb 10, 2009

Baseline Schedule

Wiki Page

The client-approved schedule that reflects the plan for implementing a project. This schedule reflects no status, and is sometimes referred to as the “target schedule.”

Feb 10, 2009

Critical Activity

Wiki Page

Any activity on a [[critical path]]. A delay in a critical activity will delay the project.

Feb 10, 2009

Critical Path

Wiki Page

关键路径是决定项目最小可能持续时间的活动顺序。当在[[网络图]中查看时),关键路径是到项目结束的最长路径。如果网络图仅包含完成至启动关系,则关键路径上任何活动的延迟都会延迟[[完成日期]]。如果它包含其他类型的关系(SS,FF,SF),这可能并不总是反映在项目管理软件中。 例如,考虑一个包含2个活动的网络:活动A具有10天的持续时间,并且具有与活动B的开始与开始关系的前驱20天。大多数PM软件将表明这两项活动都处于关键路径上,但该软件将允许A延迟10天而不延迟项目完成。事实上,由于软件算法在识别...

Feb 10, 2009

Integrated Master Schedule

Wiki Page

The overall project schedule, created by merging individual contract schedules (i.e., designer and construction contractors) and including relationships between activities that are performed and managed by different groups.

Feb 10, 2009

Current Schedule

Wiki Page

The most recent schedule, consisting of actual dates together with the project team’s forecast start and/or finish dates for each activity remaining.

Feb 10, 2009

Schedule Update

Wiki Page

A regularly scheduled status update of the current schedule, reflecting completed work and [[forecast completion]] dates for remaining efforts. See also [[Time Now]].

Feb 10, 2009

Relationship

Wiki Page

Defines how one [[activity]] is related to another. A relationship can be one of four types and may include a [[lag]] time: 1. [[Finish to start]] (FS) activity cannot start until another is finished. 2. [[Finish to finish]] (FF) activity cannot fini...