Cost Engineering

Wiki Page

Cost Engineering is concerned with the application of techniques encompassing cost estimating, cost control, profitability analysis, project management, relating to the planning and scheduling of projects.  Cost Engineers are similar to those of Quan...

Mar 18, 2011

Concrete Road surfacing

Wiki Page

Task / DescriptionSlow  Ave  Fast   Units Concrete Road surfacing, Kerbs or Side Haunches-  0.4 -   m3/hr Concrete Road surfacing, 150mm thick-  12.5 -   m2/hr Concrete Road surfacing, 200mm thick-  7.7 -   m2/hr Concrete Road surfacing, 300mm thick-...

Nov 2, 2010

Integrated Project Delivery (IPD)

Wiki Page

Integrated Project Delivery (abbreviated IPD), is a collaboration of people, systems, business structures and practices into a process that uses the skills of all participants to get project results, increase value to the owner, reduce waste, and max...

May 29, 2011

Timber frame superstructure

Wiki Page

Timber framing rates for hospital of 3173m2 GIFAAssuming that the labour is a 4 man squad working an 8 hour day as this would be normal practiceWall panels up to 3m in hieght including both external and internal panels ; 30 panels per day (average pa...

Dec 11, 2010

EVM Utilized Effectively-An Integrated Consulting Article

Wiki Page

Proper execution of projects is often hampered by inadequate planning during the initiation phase, which evolves into plans which cannot be managed effectively during execution. However, even when the planning process is successful, and what is assum...

Nov 14, 2011

The Values of Scheduling - An Integrated Consulting Article

Wiki Page

All projects regardless of size or complexity have a specific sequence for completing the component tasks. Most sequences require that certain activities be started, and in some cases, completed before other tasks may begin. This method of sequencing...

Nov 14, 2011

The Values of Scheduling - An Integrated Consulting Article

Wiki Page

All projects regardless of size or complexity have a specific sequence for completing the component tasks. Most sequences require that certain activities be started, and in some cases, completed before other tasks may begin. This method of sequencing...

Nov 14, 2011

Equipment Conveying decks

Wiki Page

Conveying decks may be used in a variety of industries, for example in airport baggage handling systems or cargo handling systems.

Nov 16, 2011

Common Scheduling Mistakes

Wiki Page

What is Scheduling? Now-a-days, in construction industry, the parameters that define the success of a project are delivering the required facility, at the required standard (quality), within the agreed Time and Budget. A commercial construction compa...

Jun 29, 2013

Zero Float

Wiki Page

 This is a condition where there exists no free time between activities in the [[schedule]].   A [[schedule]] [[activity]] which has [[Zero Float]] is a [[Critical Activity]].If this [[activity]], or a driving or driven activity is delayed then the [...

Apr 13, 2012

News: Friday 27th April 2012

Wiki Page

NEWS UPDATE...[[wysiwyg_imageupload:1044:height=80,width=207]]Dear Planners, Schedulers and Project Controls Professionals.Here is an update from us with some current and, we hope, pertinent news.Regards... Planning Planet TeamGUILD OF PROJECT CONTRO...

Apr 26, 2012

"Mr P6 Heavy Civils"

Wiki Page

Please find below pages that display a chosen selection of Q&A on this subject.

Nov 21, 2012

Promotion of activity codes in Oracle Primavera P6

Wiki Page

QUESTION Dear Mr P6 Civils,I know you can promote activity codes in P6.  What I want to know can you promote project codes to EPS codes and EPS codes to Global Codes or is it just promoting project codes to Global Codes.  I have promoted codes before...

Nov 21, 2012

"Mr Risk"

Wiki Page

Please find below pages that display a chosen selection of Q&A on this subject.

Nov 21, 2012

Risk Registers or Schedule Analysis

Wiki Page

QUESTIONDear Mr Risk,We run intensive risk workshops every month where we run through an ever growing register of what might go wrong and form all sorts of aspects – quality, finance, war!, subcontractor problems, flood, collapse, changes as well as ...

Nov 21, 2012

Optimistic and Pessimistic Durations

Wiki Page

QUESTION Dear Mr Risk,I have populated my schedule with optimistic and pessimistic durations that sit around the durations assigned in our proposed baseline. We have run our analysis package and produced a very nice ‘normal curve’ with various percen...

Nov 21, 2012