Strip Existing Wallpapers (3 layers) 5.00 m2/hr Burn Off/Heat Strip Paintwork 1.00 m2/hr Chemically Strip Paintwork 1.30 m2/hr Prepare walls 14.20 m2/hr Prepare door frame 25.00 m/hr Prepare door 12.50 m2/hr

Jul 13, 2009

Internally

Wiki Page

(Rates per coat unless stated otherwise)   One coat primer, before fixing generally 6.70 m2/hr One coat primer, before fixing lengths 20.0 m/hr Knot, 1 primer, stop, 1 undercoat, 1 gloss 1.75 m2/hr Touchup primer, 1 undercoat, 1 coat gloss 3.10 m2/hr...

Jul 13, 2009

Walls

Wiki Page
Jul 13, 2009

Internally

Wiki Page

2 coats emulsion - to plaster 8.00 m2/hr - to brick/blockwork 6.00 m2/hr 1 mist, 2 emulsion - to plaster 6.00 m2/hr - to brick/blockwork 4.50 m2/hr 1 primer, 1 undercoat, 1 gloss - to plaster 2.30 m2/hr Undercoat - to door frame 20.00 m/hr Gloss - to...

Jul 13, 2009

Externally

Wiki Page

2 coats sandtex etc - to render/concrete 2.50 m2/hr - to brick/blockwork 2.00 m2/hr 1 sealer, 2 emulsion - to render/concrete 2.00 m2/hr - to brick/blockwork 1.70 m2/hr

Jul 13, 2009

Floors

Wiki Page

Epoxy floor paint 2.95 m2/hr

Jul 13, 2009

Ceilings

Wiki Page

Emulsion paint - 2 coat 6.05 m2/hr - 3 coats 5.02 m2/hr Textured paint 4.20 m2/hr Artex 4.10 m2/hr

Jul 13, 2009

Pipeline Construction

Wiki Page

Pipe welding is not that straight forward.  You have a number of welding passes to take into consideration, then NDT and finally hydrotesting.  I worked on a pipeline construction project in Iraq and used the following formulae to work out duration f...

Jul 12, 2011

IFC File

Wiki Page

The Industry Foundation Classes (IFC) data model is intended to describe building and construction industry data.It is a neutral and open specification that is not controlled by a single vendor or group of vendors. It is an object-based file format w...

Jul 12, 2011

Tekla 3D BIM Software

Wiki Page

Tekla develops model-based software products for the architectural, engineering, and construction (AEC) market, for local government use and for power companies. These products provide users with state-of-the-art features and functionality for creati...

Jul 12, 2011

3D Objects

Wiki Page

3D Objects are 3D digital representations of elements of a 3d BIM model such as RC columns or even a light bulb. They are intelligent items/objects that have unique characteristics such as weight,area,density and volume.

Jul 12, 2011

4D Focus Time

Wiki Page

BIM 4D Focus Time is a part of the 4d timeline in 4d software whereby viewers of a 4d model can manipulate the actions of the 4d scenario by sliding the focus time on the Gantt Chart element.

Jul 12, 2011

Synchro 4D/5D BIM Software

Wiki Page

Headquartered in Birmingham, England, Synchro Ltd began software product development in 2001 on its construction simulation and task management solution, and has been recognized for its achievements in producing award-winning, innovation technology. ...

Jul 12, 2011

5D BIM

Wiki Page

5D BIM is the cost element of BIM. 5D stage takes place from concept stage through to handover of a project. It also has significance during the Asset Management stage of a project.

Jul 12, 2011

OFC Laying

Wiki Page

OFC LayingBy Using Concrete/Road Cutter EquipmentResourcesSurvey Team of 4  (1 Suveyor , 3 Assistants)Equipment with Operator and HelperCutting Line Marking team ( 2-3 Persons)OFC cable laying team ( 4 Persons)Splicing team (2  technicians )Productiv...

Jul 12, 2011

Fibre Cables

Wiki Page

There are 4 phases to laying fibre cables - The laying of the duct, the pulling of the fibre cable, the splicing/terminating of the cable and the testing of the cable.The production rate for the laying of the duct will be as any similar small diamete...