About resource Max. Units per time!!!

Forum Topic

In resources, max units per time means i have to add duration of particular material or machinaries in day or nos of material set or machinaries we are using in  a day.  Example, If I am using 4 Hydra then when I am inserting hydra as a resource then...

Aug 11, 2017

@ Risk assistance

Forum Topic

Forum MembersHopefully someone can point me in the correct direction here.I have 7 data points (actuals from a mini-project i'm currently doing - 2800, 4300, 8300, 11000, 13600, 14900, 17400) and would like to trend these out to week 26 to give me a ...

Aug 12, 2017

Consumable resource leveling capabilities of scheduling software

Forum Topic

Does this mean these the software can level consumable resources, or they just make a warning of some over allocation?Oracle Primavera P6:Adding Resources - Use this task to add resources to the resource pool. Resources include the personnel and equi...

Aug 13, 2017

EPC with emphasis on Procurement.

Forum Topic

Distinguished Planners, PM,Please i have issues measuring the progress with Ordered and delivered material. I built in every material in my program but the performance % complete keps reading zero wheni filter for procurement. How can i deal with thi...

Aug 14, 2017

Primavera & Planning Course

Forum Topic

Hey everyone,  I want to take a planning & primavera course and was wondering if someone can help me with the following questions: 1. What is the 102 course ? 2. Is it better to have an online course or a classroom based course? Thanks in advance ! 

Aug 15, 2017

Any recommended hierarchy colour schemes?

Forum Topic

Hello all,Wanted to ask if the planners on this forum follow any specific colour scheme on a programme?Just curious to know if you use a standard colour scheme on all propgrammes you use or have different pallettes for different programmes.This would...

Aug 15, 2017

keeping external links

Forum Topic

Morning all,I have a project with external links to a suppliers project.  well I have two to be honest.On one of them if they change the project number I lose the links and on the other I do not.My settings are all the same and I can't see any differ...

Aug 15, 2017

schedule % complete

Forum Topic

Hi ,I have some issues,I need to use Expense Cost and Man-hour related progress. I want to see the Planned progress and Actual progress based on the Expense Cost and Man-hour same time.I believe we can load Expense Cost as well as Man-hours to the Sc...

Aug 15, 2017

Over allocation but under resource limit

Forum Topic

 Issue with P6 showing over allocation to things under the limit (see pic).  These are multiple resources combined.  Why is it showing over allocation when the resources are under the limit?  Any help would be great. [[wysiwyg_imageupload:4951:]]

Aug 15, 2017

changing the activity links and lags

Forum Topic

I m trying to review the MS schedule submitted by the Contractor, i noticed that he is changing the activity links and lags in the updated monthly schedule, does anyone have a spreadsheet or a certain method to review the links I tried exporting the ...

Aug 16, 2017

Works not reflecting accepted programme

Forum Topic

Hi I hope this has been posted in the right place...I have a situation where a contractor has had a clause 31 programme accepted however from day one the construction team are undertaking works in a different sequence... they clause 32 is due in 3 we...

Aug 16, 2017

WBS Schedule Pro Software and WBS Charts

Forum Topic

Here's a quick tip on how to make viewable WBS charts of your schedule for presentation to stakeholders using WBS Schedule Pro and WBS Charts http://ed.gr/dj7v

Aug 17, 2017

Multiple productivities in one activity

Forum Topic

Hi,    I'm trying to set up a Primavera Project for a future sensitivity/Monte Carlo analysis, therefore, I need to automatize the current schedule.     I have two activities running in paralell. Activity 1 is shorter than activity two and once it fi...

Aug 17, 2017

Progressing Milestones in the Spreadsheet

Forum Topic

When I log in as admin I can progress milestones in the spreadsheet, but when I log in as a user inside of a security group I have to progress up to 100% complete on the Gantt Chart and then change the date. The error reads that I do not have suffici...

Aug 17, 2017

Planned Resources Analysis Monthly

Forum Topic

Hi,Currently I'm preparing planned resources (machinery & manpower) required for the project in monthly frequency. However, there are two ways in assessing the planned and resources (perhaps different user different method). The method (in my opinion...

Aug 21, 2017

Filtering by Trades Contractor

Forum Topic

Hi All, Is it possibel to filter by trades contractor? I am currently using version 13.0.02.069 of Asta Thanks

Aug 22, 2017