Zinc Roofing

Wiki Page

Zinc Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Zinc Work = 2.3 m2/day Sloping Roof Zinc Work = 1.9 m2/day

Mar 7, 2009

Aluminium Roofing

Wiki Page

Aluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day

Mar 7, 2009

Titanium Roofing

Wiki Page

Titanium Roofing System  Metal roof works are usually carried out with 2 men gangs of skilled labour.  The rates do not include for the timber backing structures etc.  Titanium roof on multiple sub‑layers.  Typical composite rate of 9.5 m2/day.  Inst...

Mar 7, 2009

Metal Features

Wiki Page

Metal Roof Features Composite rates have been calculated to provide an approximation of the time elements for these ancillary parts to metal roofs. Dormer Cheeks 1.36 m2/day Flat Gutter & Coping Flashings negligible time Step Gutter & Shaped Copings ...

Mar 7, 2009

Guttering & Pipes

Wiki Page

DownPipes                75 mm UPVC Pipes 3.3 m/hr 75 mm Cast Iron Pipes 2.1 m/hr 72 mm Aluminium Pipe System 2.5 m/hr  Guttering                75 mm UPVC Gutter 3.1 m/hr 75 mm Cast Iron Gutter 2.5 m/hr 72 mm Aluminium Gutter System 2.9 m/hr  Fittin...

Mar 7, 2009

Gravel Chippings

Wiki Page

Roof Protections Gravel & Chippings - Allow a rate of 1.4 tonnes/day for transporting and laying out solar reflective chippings.

Mar 7, 2009

Define First Fix

Wiki Page

Definition of Building Services - First Fix  Environmental Control Systems   This shall include the installation of all ECS equipment such as MCC's, fans and AHU's.   In addition the installation of all primary and secondary ductwork and pipework sys...

Mar 7, 2009

Define Second Fix

Wiki Page

Definition of Building Services - Second Fix Environmental Control Systems This shall include the installation of fan coils, EP panels and PLC panels. In addition, the insulation of all primary and secondary ductwork as well as pipework systems; leak...

Mar 7, 2009

Lift Installation

Wiki Page

Lift InstallationSequence of WorkA standard installation sequence for a "conventional hydraulic lift with 2 - 3  storeys and doors etc.Handover of lift shaft structure and associated lift machine room.Deliver all materials to site, 2 weeks.Hoisting o...

Mar 7, 2009

Kitchen Installations

Wiki Page

Installation SequencesIndustrial and Commercial installations usually commence when false ceilings, floorings and final decorations are substantially complete. Kitchen Hood Installations are done before false ceiling completion and kitchen equipment ...

Mar 7, 2009

Milestone Management

Wiki Page

Milestone Management In order to organise your time and work for the project you have, set up milestones and define a deliverable for each major milestone. They enable the progress of the project to be easier measured and controled. A milestone is a ...

Mar 7, 2009

Progress Reporting

Wiki Page

Progress Reporting Progress reporting is a key element of project management. Reports should be issued by the Project Manager and circulated to the stakeholders on a regular basis. The following people must be included on the circulation list: Projec...

Mar 8, 2009

PERT

Wiki Page

Duration estimation ala PERT Program Evaluation and Review Technique (PERT) originated in the 1950s during the U.S.N. Nautilus nuclear submarine project. PERT has terminology and concepts all its own: •    Optimistic = O •    Most likely = ML •    Pe...

Mar 8, 2009

Hammock Tasks

Wiki Page

A hammock task is dependent on external dates for its start and finish dates and, ultimately, its duration. The name, hammock task, is derived from the way a hammock's shape is determined by the distance between the points to which it is attached. Cr...

Mar 8, 2009

Trending

Wiki Page

What is Trending ? How does it Work ? Incremental measurement of progress over short or long periods of Time Comparison of incremental planned progress with incremental actual progress Identifies all areas where shortfall in progress occurs Quantifie...

Mar 9, 2009

Deltek - Open Plan

Wiki Page

Deltek Open Plan is an enterprise-class project management solution for medium to large/multiple projects. Details: [[http://tinyurl.com/ple5pz]]

Apr 4, 2009

Common Brickwork

Wiki Page

Common Brickwork, by Machine (no/hr)        Hole depth (mm) --> 0-75 75-125 125-250 250-375 375-500 Ne 100 cm2 -  16.6 7.69 5.26 4.00 100-250 cm2 -  12.5 5.88 4.00 2.94 250-500 cm2 -  10.0 5.00 3.33 2.50 500-100 cm2 -  8.33 4.17 2.78 2.08  Common Bri...

Jul 13, 2009

Painting & Decorations

Wiki Page

PaintingTask / DescriptionSlow  Ave  Fast   Units Prepare Walls-  14.2 -   m2/hr Prepare Doors-  12.5 -   m2/hr Prepare Door Frames-  25.0 -   m/hr Burn Off / Heat Strip Paintwork-  1.1 -   m2/hr Internal Timber, 1 coat primer before fixing, generall...

Jul 13, 2009

Preparatory Works

Wiki Page

Strip Existing Wallpapers (3 layers) 5.00 m2/hr Burn Off/Heat Strip Paintwork 1.00 m2/hr Chemically Strip Paintwork 1.30 m2/hr Prepare walls 14.20 m2/hr Prepare door frame 25.00 m/hr Prepare door 12.50 m2/hr

Jul 13, 2009