Housing Demolitions

Wiki Page

DemolitionTask / DescriptionSlow  Ave  Fast   Units Weight, Structural Steel-  2.5 -   Tonnes/m3 Remove & Cart away, Ceramic Wall Tiles2.0 2.5 3.4  m2/hr Remove & Cart away, Wallpaper, 1 layer-  8.7 -   m2/hr Remove & Cart away, Wallpaper, 2 layers- ...

Mar 1, 2009

Cutting Back

Wiki Page

Cutting Back Concrete Cutting Piles For Pile Caps, Using Breaker & Air Tools Providing A Rough Finish (hrs/pile)Pile Diameter-->0.35m0.5m0.6m0.79m0.94m1.1m2.2m0 - 100mm high0.320.440.630.931.381.74 8.10100-200mm high0.390.560.811.221.832.16 8.58200-3...

Mar 1, 2009

Cutting Chases

Wiki Page

Cutting ChasesTask / DescriptionSlow  Ave  Fast   Units Concrete, cutting by hand, < 25mm wide1.5 2.1 3.1  m/hr Concrete, cutting by hand, 25-50mm wide1.2 1.6 2.5  m/hr Concrete, cutting by hand, 50-75mm wide1.0 1.4 2.1  m/hr Concrete, cutting by han...

Mar 1, 2009

Cutting Switchboxes

Wiki Page

Cutting SwitchboxesTask / DescriptionSlow  Ave  Fast   Units Cutting in Concrete, small box7.1 9.5 12.5  no/hr Cutting in Concrete, large box3.6 4.5 5.6  no/hr Cutting in Brickwork, small box6.6 9.5 12.5  no/hr Cutting in Brickwork, large box4.2 5.3 ...

Mar 1, 2009

Spread & Leveling

Wiki Page

Spread and LevelTask / DescriptionSlow  Ave  Fast   Units Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 5-50m to stockpile13.9 20.4 25.0  m3/hr Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 50-120m to stockpile7.6 9.5 12.6  m3/hr Crawler Shovel, ...

Mar 1, 2009

Asta Powerproject

Wiki Page

 Asta Powerproject is proven robust and scaleable software, rated no.1 by the Planning Engineers Organisation for construction project management and planning.70% of successful UK construction projects are driven by Asta Powerproject software includi...

Mar 2, 2009

Trench Excavations

Wiki Page

Trench Excavation...Task / DescriptionSlow  Ave  Fast   Units Hydraulic Excavator, 0.3m3 bucket, Sand/Soil5.6 7.1 8.2  m3/hr Hydraulic Excavator, 0.3m3 bucket, Gravel Beds4.8 6.1 7.3  m3/hr Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk4.8 6.1 7.1  m3...

Mar 1, 2009

Linear Planning

Wiki Page

Linear Planning is [[planning]] or scheduling of project management tasks where distance is a significant factor in the project. Examples of projects include roads, rail, pipeline and transmission lines. Linear planning considers not only the time fa...

Mar 2, 2009

Underpinning

Wiki Page

Concrete Pinning - During underpinning operations a cycle of every 4th or 5th pin being constructed concurrently is adopted.Rate of 1.2 m/day, i.e. 1 number support pin per dayUnderpinning...Task / DescriptionSlow  Ave  Fast   Units Concrete Pinning,...

Mar 1, 2009

Barrette Piles

Wiki Page

Barrette PilesTask / DescriptionSlow  Ave  Fast   Units Rule of Thumb, overall rate by Mill0.5 1.1 1.2  hrs/no Fabricate reinforcement cages-  4.0 -   hrs/cage Concreting barrette panels40.0 50.0 55.0  m3/hr Trimming top of barrette panels-  2.4 -   ...

Mar 1, 2009