Looking for Decent Risk Software

Forum Topic

I am looking for Decent Risk Software   I have the following requirements   1) Integrateable with Primavera and MS project 2) Easy to use 3) Consider Lags and Logic as part of the Risk Assesment. (Example) Optimistic Logic FS-10D /  Pesimistic = FS +...

May 30, 2011

MHRs

Forum Topic

Hianyone knows when and how should we revise the manhours  Regards Ali

May 30, 2011

How to integrate costs within P6

Forum Topic

Hello, I'm a new user with the Primavera software (P6). My question is: how do I do cost input in P6?? If someone could tell me step by step please.... Thank you.

May 30, 2011

Working from home is the key to efficiency

Forum Topic

A lot of people have to do a job for a living, even if it means being exposed to a program of authoritarian propaganda punctuated by many different moments of frantic productivity. Beginning your own business kicks employers to the curb, but the trad...

May 31, 2011

Help! Transmission Lines...

Forum Topic

Greetings!I wish to seek assistance for the below as my experience on this is 0%.Objective is to prepare a master plan of a design and build program for the construction of a 275kV overhead transmission lines.What are key activities to develop a leve...

May 31, 2011

As Late as Possible (ROS)

Forum Topic

We have a Task called ROS (Required on site date) Normally we apply a as late as possible constriant on this task, The Task Predacessor is delivery to site Task Successor is Construction with a Lag (The Theory being that we want everything on ste 2 t...

May 31, 2011

Push to move away from WBS to Activity Codes

Forum Topic

Hii, Anyone gettibng pressure from Company to move away from WBS to using solely Activity Codes? I know primavera/oracle have been pushing this but don't know how far this has gone. Usually non-planners push this type of change.

May 31, 2011

BULK MATERIAL HANDLING WBS FOR AN EPC

Forum Topic

I am working on tailoring a work breakdown structure for the construction of a coal fired power plant for an EPC organisation. I am facing a challenge in defining a WBS that covers the bulk material from engineering, procurement through to constructi...

Jun 1, 2011

How to Restrict other users from editing perticular project

Forum Topic

Dear Guys, what are the different ways to restrict the other users who are viewing to edit the data. i tried to use the exclusive status to the project but again when I see the status from other users it is still in shared mode.why is this happening....

Jun 1, 2011

Does TIME-COST trade offs have any relevance in planning practice?

Forum Topic

Dear all,Probably all of you aware the fact that modern project management is tight together with the development of Pert, and CPM. I guess you know it too, that the original CPM method was a sophisticated cost optmization method, which could optimiz...

Jun 1, 2011

Display "%" into an UDF

Forum Topic

Hello guys, I'm looking for a way to display the "%" character at the end of an UDF in order to make it looks like at a calculated cells. I didn't find anything so anybody already try? and succeed? Thanks in advance 

Jun 1, 2011

MSP-2010 More than 1 timeline

Forum Topic

Hi...   Anyone can tell how to insert more than one timeline at the top in MSP 2010??   Rangrajan

Jun 2, 2011

schedule cracker

Forum Topic

Hi friends,Is there any manual adjustments possible sc reports or is it only templates?Best RegardsSunil

Jun 2, 2011

Spending Plan

Forum Topic

Mga Kabayan, Any of you using spending plan who can help coz y have a six years project and i can't put the six years duration since only 4 years appearing on the speding plan window. How can i adjust to make it six years.   Thanks for your help, dav...

Jun 2, 2011

P6 duration format

Forum Topic

It's confuse, my activity duration is 240days, I think 240 days roughly equal to 8 months,  when I change the duration format  unit of time to month, it became to 11 month, what's the problem? Dose anyone can help me ? Thanks Huang Zhao

Jun 2, 2011

MS Project 2007 to MS Project 2010

Forum Topic

Hi guys,   I'm currently working with a quite big project plan in MS Project 2007. I want to move over to MS Project 2010 and had it installed, but it does not want to open my MS Project 2007 plan. It just starts up and then close immediately. Any id...

Jun 2, 2011

Cost Control MS Project 2007

Forum Topic

Hi there,   I loaded the estimate into my project plan in MSP 2007 as cost and material resources. When is a cost resource used? When I enter % complete, it also calculate my actual cost. I did untick this option but it keeps on doing it. How do I en...

Jun 2, 2011

Cost Control MS Project 2007

Forum Topic

Hi there,   I loaded the estimate into my project plan in MSP 2007 as cost and material resources. When is a cost resource used? When I enter % complete, it also calculate my actual cost. I did untick this option but it keeps on doing it. How do I en...

Jun 2, 2011

Retained Logic/ Progress Override

Forum Topic

Total float can be calculated using one of this method, which method is more realistic for the complex and big projects.

Jun 3, 2011