Career Development Plan

Forum Topic

Dear Friends,We have been asked / tasked with reviewing the Guild's Career Development Plan.  If anyone wishes to join the team who are reviewing this please drop us a line at [email protected].  Keep on Planning !

Feb 26, 2014

Sample P6 MEP plan

Forum Topic

Hi           Please can any one send me MEP sample plan on P6 Primavera. I am fresh planning engineer needing help in planning. regards mohsin [email protected]

Feb 26, 2014

NEC3 - Terminal Float

Forum Topic

Hi all,If the Contract states that the float from planned completion to contractual completion of the different sectional milestones and the final completion date belongs to the Contractor, would you then make activities for that float in the baselin...

Feb 26, 2014

Adtivity Duration and resource levelling

Forum Topic

hi people, I am new in planning, and It would be highly appreciated to answer my BASIC questions :) Have an activity which actually takes 12 hours but in 2 weeks, how I can plan it? already in my schedule,  it started on 17th Feb and will finish 28th...

Feb 27, 2014

Local/Govt Regulation requirements(work permits) for Malaysia

Forum Topic

Dear All,   I am presetly preparing Level 3 schedule for a EPC Project in Malaysia.I have to add the Local/Govt regulations and work permits required in to the schedule.As of now,I have only around 10 work permits listed in the schedule,which is very...

Feb 27, 2014

Unassigned baseline problem with current project

Forum Topic

Hi All,Although i havent assigned any baseline to my schedule in bar chart i see baseline bars(project,primary or secondary) for actual activities seen attached pictureWhen i assign baseline i also see same barsCan anybody help me?Kursat[[wysiwyg_ima...

Feb 27, 2014

Anyone Going to COLLABORATE14?

Forum Topic

Who's going to COLLABORATE14 in Las Vegas this April? It's a huge event, particularly for us Primavera P6 users. More details here http://ow.ly/u3FDo

Feb 27, 2014

Control E Fill Down Functionality Removed in R8.3

Forum Topic

I apologize if this has been asked/ansewred a million times already but not having much luck with the seartch functions of the forum. I recently  purchased and installed P6 R8.3.0 (build 6424) and I still have fill down capability, but only by right ...

Feb 27, 2014

Shift resources

Forum Topic

Hi All, I'm involve in Turnaround scheduling and I've got this problem with operations resources. In ops, we have day shift (6pax) and night shift (2pax) resources and we need to work around this constraint and level the resources. My problem is when...

Feb 28, 2014

Network logic Plots

Forum Topic

I am after good quality network logic plots from a P6 schedule I have. The default P6 layout with logic lines overlying each other is not very conducive to following the logic on A0 sized sheets, especially for non Planners. I seem to remember some t...

Feb 28, 2014

Do not resource level flag / Must Start On constraint.

Forum Topic

Dear all,I still sort of feel that for my applications it would be difficult to work  with Spider without a feature  to make certain tasks so high priority, that resource leveling cannot move them at all. So, something like “do not resource level” fl...

Feb 28, 2014

Best Interview Questions

Forum Topic

HiWhat would be very great interview questions to ask to a project cost controller EXPERT/Guru to test his real knowledge.The goal is to test following areas:Project Planning & SchedulingCost ControlsCost Estimation & Bidding Expertise for projects I...

Feb 28, 2014

where to find labour or machine constant values online

Forum Topic

Hi all, can anyone please advise where to find labour or machine constant values online?it there any free sources such as Rawlinsons construction handbook online.If not, how can you get the labour or machine constant values to estimate the activity d...

Mar 1, 2014

P6 8.3.2 Top Down Estimation

Forum Topic

Just upgraded to P6 8.3.2 and noticed a feature under Tools called 'Top Down Estimation'.  Never used it before.  How does it work?  Is it worth learning.  Apparently it has been around since P3C, but disappeared after 8.1.  Just curious.

Mar 2, 2014

High Rise Building Construction Schedule

Forum Topic

Dear Friends,Can anybody help me by forwarding "High Rise Building Construction Schedule". If possible resource loaded otherwise without will also help.My email id: [email protected] will be a great help...Thanks in advance!Regards,Prakash 

Mar 3, 2014

Late Start and Late Finish earlier than Early Start and Early Finish

Forum Topic

Dear all, In a schedule that I used the same calendar for all the activities I experienced the fact that for some activities on critical path the late dates were earlier than the early dates. e.g. ES:1-MAR-2014 LS:28-FEB-2014 late start one day befor...

Mar 3, 2014

Assigning From A Sub-Selection Of P6 Resources

Forum Topic

It can be a real pain when trying to assign Resources to the Activities in your Primavera P6 Project when you are going to use just a handful of the large number of P6 resources that are available. Here's an article on how to assign from a sub-select...

Mar 3, 2014

Gantt chart separation of activities

Forum Topic

My project has several locations of work performed and I have them grouped by activity codes A,B,C... This does not appear to be enough separation for my customer.  Is there a way to insert a horizontal line to separate these activity groups?

Mar 3, 2014

Free Gantt Viewer and DCMA 14 for Primavera

Forum Topic

Hello Plannersi have written  an excel macro that perform the metrics for DCMA 14 ( ok only the first 10 tests), and draw a gantt Chart in Excelyou can download it in https://code.google.com/p/xer-reader/a short tutorial is available herehttps://www....

Mar 4, 2014