Search

Roof Structure

Wiki Page

Usually carried out with a minimum of a 2 man gang, sometimes with an additional labourer. For a typical semi-detached house structure or similar...    Roof Trusses 1.28 no/hr Wall Plates 2.76 m/hr Rafters 1.17 m/hr Ceiling Joists 32.10 m/hr    

Mar 7, 2009

Roof Structure

Wiki Page

Structural Steel Structures   For medium sized applications with a single crane and fixing gang.   A typical rate                  3.4 - 4.6 tonnes/day.   Structural steel for glazed wall, made of 18 no "bow string" strusses 25 m tall, cross braced a...

Mar 7, 2009

Slate Roofs

Wiki Page

Slate Roofs Usually carried out with a 2 man gang, sometimes with an additional labourer.             Natural Welsh Slate 3.5-5 mm thick 18.0 m2/day Natural Cumbrian 8-11 mm thick 8.5 m2/day Asbestos Slates   36.0 m2/day  

Mar 7, 2009

Tiled Roofs

Wiki Page

Usually carried out with a 2 man gang with 1 labourer.  The rates include for felting, battening and fixing of tiles etc.  Concrete Interlocking Tiles  52 m2/day Clay Pan Tiles 26 m2/day  

Mar 7, 2009

Asbestos Roofs

Wiki Page

Asbestos Type Roofs A typical rate of 39 m2/day

Mar 7, 2009

Asphalt Roofs

Wiki Page

Asphalt Roofs Usually carried out with a 2 man gang with an additional 1 or 2 labourers.   A typical composite rate of 45 m2/day

Mar 7, 2009

Felt Roofs

Wiki Page

Built-Up Felt Roofs Usually carried out with a minimum of a 1 man gang with a labourer. Large Roof Areas = 52 m2/day Smaller or Complicated Areas = 35 m2/day

Mar 7, 2009

Metal Decking

Wiki Page

Metal Decking SystemsUsually carried out with a minimum of a 3 man gang with a labourer.Large Roof Areas = 70 m2/daySmaller or Complicated Areas = 28 m2/dayMetal DeckingTask / DescriptionSlow  Ave  Fast   Units Metal Decking, large areas-  70.0 -   m...

Mar 7, 2009

Profiled Sheeting

Wiki Page

Profiled Sheeting Systems  Usually carried out with a minimum of a 2 man gang.   Large Roof Areas = 54 m2/day

Mar 7, 2009

P.V.C. Sheeting

Wiki Page

P.V.C. Sheeting Usually carried out with a minimum of a 3 man gang with a labourer. Large Roof Areas = 50 m2/day Smaller Areas = 40 m2/day

Mar 7, 2009

Lead Roofing

Wiki Page

Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Lead Roofing Flat Roof Lead Work = 2.5 m2/day Sloping Roof Lead Work = 2.1 m2/day

Mar 7, 2009

Copper Roofing

Wiki Page

Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Copper Roofing  Flat Roof Copper Work = 3.0 m2/day      Sloping Roof Copper Work = 2.7 m2/day  

Mar 7, 2009

Zinc Roofing

Wiki Page

Zinc Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Zinc Work = 2.3 m2/day Sloping Roof Zinc Work = 1.9 m2/day

Mar 7, 2009

Aluminium Roofing

Wiki Page

Aluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day

Mar 7, 2009

Titanium Roofing

Wiki Page

Titanium Roofing System  Metal roof works are usually carried out with 2 men gangs of skilled labour.  The rates do not include for the timber backing structures etc.  Titanium roof on multiple sub‑layers.  Typical composite rate of 9.5 m2/day.  Inst...

Mar 7, 2009

Metal Features

Wiki Page

Metal Roof Features Composite rates have been calculated to provide an approximation of the time elements for these ancillary parts to metal roofs. Dormer Cheeks 1.36 m2/day Flat Gutter & Coping Flashings negligible time Step Gutter & Shaped Copings ...

Mar 7, 2009

Guttering & Pipes

Wiki Page

DownPipes                75 mm UPVC Pipes 3.3 m/hr 75 mm Cast Iron Pipes 2.1 m/hr 72 mm Aluminium Pipe System 2.5 m/hr  Guttering                75 mm UPVC Gutter 3.1 m/hr 75 mm Cast Iron Gutter 2.5 m/hr 72 mm Aluminium Gutter System 2.9 m/hr  Fittin...

Mar 7, 2009

Gravel Chippings

Wiki Page

Roof Protections Gravel & Chippings - Allow a rate of 1.4 tonnes/day for transporting and laying out solar reflective chippings.

Mar 7, 2009

Define First Fix

Wiki Page

Definition of Building Services - First Fix  Environmental Control Systems   This shall include the installation of all ECS equipment such as MCC's, fans and AHU's.   In addition the installation of all primary and secondary ductwork and pipework sys...

Mar 7, 2009

Define Second Fix

Wiki Page

Definition of Building Services - Second Fix Environmental Control Systems This shall include the installation of fan coils, EP panels and PLC panels. In addition, the insulation of all primary and secondary ductwork as well as pipework systems; leak...

Mar 7, 2009