Hi Robin,

In P3, Click Format>Dates and only appeared the date format for Arabic numerals(21-3-2010), but not had that I need type (21-mar-2010)on months.

Member for

17 years 6 months

Hi Mike,

Sorry! I wrote the status is in primavera - P3.1 Verson. whether is same changing on the default system of windows XP? I already try so doing but not change together with system of windows XP.



Best regards



Mch714

Member for

19 years 10 months

Hi Mch



It is old software so the numeric system applies - you are lucky to get 2010 visible.



In Powerproject version 5 - some time ago - the date format was linked to the default windows set up but now you can set it to whatever configuration you want.



Best regards



Mike Testro.